Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Johnson Lifts Team. If you also belong to the team, you can get access from here

Johnson Lifts Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Johnson Lifts Project Manager Interview Questions and Answers

Updated 26 Sep 2024

Johnson Lifts Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Important Govt. Projects (Railways, refinery, etc) successfully executed in past
  • Ans. 

    Some important Govt. projects successfully executed in the past include the construction of the Golden Quadrilateral highway network and the Delhi Metro.

    • Construction of the Golden Quadrilateral highway network connecting major cities in India

    • Development of the Delhi Metro system to improve public transportation in the capital city

    • Modernization of airports such as the Indira Gandhi International Airport in Delhi and Chh

  • Answered by AI
  • Q2. Relieving time of present organization?
  • Ans. 

    I am currently serving a notice period of 1 month in my present organization.

    • Currently serving a notice period of 1 month

    • Will be available to start in a new role after the notice period is completed

  • Answered by AI
  • Q3. Expected salary
  • Ans. 

    My expected salary is in line with industry standards and reflective of my experience and skills.

    • Research industry standards for Project Manager salaries in the local area

    • Consider my years of experience and relevant skills when determining salary expectations

    • Be prepared to negotiate based on the specific responsibilities and requirements of the role

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Tell your achievements

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Project management and project planning

Round 2 - Technical 

(2 Questions)

  • Q1. Enterprise Resources planning
  • Q2. Manufacturing executives systems
Round 3 - HR 

(2 Questions)

  • Q1. Certificate verification
  • Q2. Salary negotiations
Round 4 - One-on-one 

(2 Questions)

  • Q1. Project management
  • Q2. Project ownership

Interview Preparation Tips

Interview preparation tips for other job seekers - A creative man is motivated by the desire to achieve not by the desire to beat others
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Introduction and background related questions
  • Q2. Current and expected comp
Round 2 - Technical 

(2 Questions)

  • Q1. Quality and API related aspects were discussed
  • Q2. Background and past projects related questions/discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Project management and project planning

Round 2 - Technical 

(2 Questions)

  • Q1. Enterprise Resources planning
  • Q2. Manufacturing executives systems
Round 3 - HR 

(2 Questions)

  • Q1. Certificate verification
  • Q2. Salary negotiations
Round 4 - One-on-one 

(2 Questions)

  • Q1. Project management
  • Q2. Project ownership

Interview Preparation Tips

Interview preparation tips for other job seekers - A creative man is motivated by the desire to achieve not by the desire to beat others
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Introduction and background related questions
  • Q2. Current and expected comp
Round 2 - Technical 

(2 Questions)

  • Q1. Quality and API related aspects were discussed
  • Q2. Background and past projects related questions/discussion
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Working of NVR and troubleshooting of same
  • Ans. 

    NVR stands for Network Video Recorder, used for recording and storing video footage from IP cameras.

    • NVR records video footage from IP cameras onto a hard drive or storage device.

    • Troubleshooting NVR involves checking network connections, power supply, and storage capacity.

    • Common issues include network connectivity problems, insufficient storage space, and power supply failures.

  • Answered by AI
  • Q2. What is earthing
  • Ans. 

    Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.

    • Earthing helps to prevent electric shock by providing a path for fault currents to flow safely into the ground.

    • It also helps to protect electrical equipment from damage caused by lightning strikes or power surges.

    • Earthing is essential in electrical systems to ensure safety and proper functioning.

    • Exampl...

  • Answered by AI
  • Q3. How to check input and output voltage
  • Ans. 

    To check input and output voltage, use a multimeter to measure the voltage at the input and output terminals of the device.

    • Set the multimeter to the voltage measurement setting.

    • Connect the black probe to the ground terminal and the red probe to the input terminal to measure input voltage.

    • Repeat the process for the output terminal to measure output voltage.

    • Ensure the voltage readings are within the specified range for t

  • Answered by AI
  • Q4. Colour coding of cat6 cable
  • Ans. 

    Cat6 cables are typically color coded for easy identification and organization.

    • Cat6 cables are often color coded according to the TIA/EIA-568-B standard

    • The standard color code for Cat6 cables includes solid colors like blue, orange, green, and brown, as well as striped versions of those colors

    • Color coding helps in quickly identifying and organizing cables in a network setup

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - A good company with friendly atmosphere

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Related to CCTV projects
  • Q2. Boom barrier loop detection?
Round 3 - HR 

(1 Question)

  • Q1. Salary related questions answers

Interview Preparation Tips

Interview preparation tips for other job seekers - take answers prepare technical stick on salary negotiation

I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to handle project
  • Ans. 

    Handling a project involves effective planning, communication, and coordination to ensure successful completion.

    • Create a detailed project plan outlining objectives, tasks, and timelines.

    • Assign roles and responsibilities to team members based on their skills and expertise.

    • Establish clear communication channels to facilitate regular updates and feedback.

    • Monitor project progress regularly and address any issues or risks p...

  • Answered by AI
  • Q2. How to share update to the customer.
  • Ans. 

    Regular communication through emails, calls, meetings and reports.

    • Schedule regular meetings with the customer to discuss progress and updates.

    • Send weekly or monthly reports summarizing the progress made.

    • Communicate through emails and calls to keep the customer informed about any changes or issues.

    • Provide demos or presentations to showcase the work done.

    • Be transparent and honest about any delays or challenges faced.

    • Ask ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Firstly , prepare for interview . Be confident at the time of interview.

Assistant Project Manager Interview Questions & Answers

Rockman Industries user image Sushil Shukla 》》Way of Life《《

posted on 28 May 2021

Interview Questionnaire 

1 Question

  • Q1. Why joining

Johnson Lifts Interview FAQs

How many rounds are there in Johnson Lifts Project Manager interview?
Johnson Lifts interview process usually has 1 rounds. The most common rounds in the Johnson Lifts interview process are HR.
How to prepare for Johnson Lifts Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Johnson Lifts. The most common topics and skills that interviewers at Johnson Lifts expect are Elevators, Escalators, Lifts, Program Management and Project Execution.
What are the top questions asked in Johnson Lifts Project Manager interview?

Some of the top questions asked at the Johnson Lifts Project Manager interview -

  1. Important Govt. Projects (Railways, refinery, etc) successfully executed in p...read more
  2. Relieving time of present organizati...read more

Tell us how to improve this page.

Johnson Lifts Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

John Deere Interview Questions
4.1
 • 226 Interviews
VVDN Technologies Interview Questions
3.6
 • 193 Interviews
Vivo Interview Questions
4.1
 • 191 Interviews
Royal Enfield Interview Questions
4.2
 • 149 Interviews
Schlumberger Interview Questions
4.0
 • 137 Interviews
View all
Johnson Lifts Project Manager Salary
based on 6 salaries
₹14 L/yr - ₹25 L/yr
28% more than the average Project Manager Salary in India
View more details

Johnson Lifts Project Manager Reviews and Ratings

based on 4 reviews

4.6/5

Rating in categories

4.3

Skill development

4.2

Work-life balance

4.1

Salary

3.9

Job security

4.1

Company culture

4.1

Promotions

3.8

Work satisfaction

Explore 4 Reviews and Ratings
Junior Engineer
315 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Lift Technician
236 salaries
unlock blur

₹1 L/yr - ₹6 L/yr

Technician
193 salaries
unlock blur

₹1.1 L/yr - ₹5.1 L/yr

Elevator Technician
116 salaries
unlock blur

₹1.5 L/yr - ₹5.5 L/yr

Sales Executive
107 salaries
unlock blur

₹2.4 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Johnson Lifts with

Otis Elevator

4.0
Compare

KONE

4.2
Compare

Schindler

3.9
Compare

Mitsubishi Electric

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview