Filter interviews by
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
My name is Sudhir yadav from jharkhand branch electrical Engineer and. Diploma pass out of 2021
Balancing quantity and quality time in the working process is essential for efficiency and effectiveness.
Prioritize tasks based on importance and deadlines to manage quantity and quality time effectively.
Set realistic goals and deadlines to ensure quality work while also meeting quantity requirements.
Regularly review and adjust your schedule to optimize productivity and maintain work-life balance.
Use tools and techniqu...
Diploma pass out 2021 year .motor work properly a
Top trending discussions
I applied via Campus Placement and was interviewed in Mar 2024. There were 2 interview rounds.
My father is a software engineer who works for a tech company.
Software engineer
Works for a tech company
Yes, I have worked for another company before.
Yes, I have previous work experience with XYZ Company as a sales associate.
I have also worked part-time at ABC Corporation during my college years.
My previous job at DEF Inc. involved project management and client relations.
Some logical technical and reasoning related questions
25 optional questions
I applied via Recruitment Consulltant
Glass manufacturing involves melting raw materials, shaping the molten glass, and cooling it to form the final product.
Raw materials such as silica sand, soda ash, and limestone are melted in a furnace at high temperatures.
The molten glass is then shaped using various techniques like blowing, pressing, or drawing.
The shaped glass is cooled slowly in an annealing oven to relieve internal stresses and strengthen the glas...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
I last worked at a marketing agency specializing in digital advertising.
Worked at a marketing agency
Specialized in digital advertising
I have over 5 years of experience in the field.
5+ years of experience in the industry
Extensive knowledge and skills acquired over the years
Proven track record of successful projects
Familiarity with industry trends and best practices
Mass production allows for lower costs due to economies of scale.
Lower production costs per unit
Increased efficiency in production processes
Ability to meet high demand quickly
Consistent quality control measures
Examples: assembly line production in automotive industry, electronics manufacturing
Fundamental deviation of hole in BIS system can be indicated by specifying the tolerance zone and the position of the hole.
Specify the tolerance zone for the hole based on the BIS system standards.
Measure the actual position of the hole and compare it to the specified tolerance zone.
If the actual position of the hole falls outside the tolerance zone, indicate it as a fundamental deviation.
A rack and pinion mechanism is used to convert linear motion of plunger to rotary motion of pointer in D.T.I.
Rack and pinion mechanism consists of a gear (pinion) that meshes with a linear gear (rack) to convert linear motion into rotary motion.
As the plunger moves linearly, it engages with the rack which in turn rotates the pinion, causing the pointer to move.
This mechanism is commonly used in devices like dial indica...
I applied via Campus Placement
I applied via Company Website and was interviewed in Jul 2023. There were 2 interview rounds.
G code and m code
Solid works, cad, cam
Fanuc series 21 programming, mazatrol programming
Engineer
186
salaries
| ₹2.5 L/yr - ₹7 L/yr |
Senior Engineer
131
salaries
| ₹4.4 L/yr - ₹9.5 L/yr |
Trainee
124
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Junior Engineer
123
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Quality Engineer
85
salaries
| ₹1.9 L/yr - ₹5.8 L/yr |
Bharat Forge
Samvardhana Motherson Group
TVS Sundram Fasteners
Rane Group