Filter interviews by
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before May 2021. There were 2 interview rounds.
Aptitude test
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Apr 2022. There were 2 interview rounds.
Digital electronics is the branch of electronics that deals with digital signals and circuits.
It involves the use of binary digits (0 and 1) to represent information
Digital circuits are made up of logic gates that perform Boolean operations
Examples include computers, smartphones, and digital cameras
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
What kind of behavior for workers
Process actives are steps or tasks involved in completing a specific process.
Identify all the steps involved in the process
List the tasks in sequential order
Define the inputs and outputs of each step
Assign responsibilities for each task
Monitor progress and adjust as needed
posted on 20 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
A random cylinder is a geometric shape defined by a random height and radius, often used in probability and statistics.
A random cylinder can be defined by its height (h) and radius (r), which can vary randomly.
In probability, random cylinders can model real-world phenomena, like the distribution of particles in a volume.
Example: If the height of a cylinder is uniformly distributed between 1 and 10 units, and the radius...
OEE stands for Overall Equipment Effectiveness, a metric used to measure manufacturing productivity.
OEE is calculated using three components: Availability, Performance, and Quality.
Availability = (Operating Time / Planned Production Time) x 100%. Example: If a machine runs for 8 hours but is down for 1 hour, availability is 87.5%.
Performance = (Actual Output / Maximum Possible Output) x 100%. Example: If a machine prod...
based on 1 interview
Interview experience
based on 14 reviews
Rating in categories
Process Engineer
215
salaries
| ₹2.6 L/yr - ₹9.4 L/yr |
Junior Officer
105
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Assistant Manager
96
salaries
| ₹3.5 L/yr - ₹10.4 L/yr |
Section Leader
91
salaries
| ₹5 L/yr - ₹16 L/yr |
Executive
65
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda