I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Launching girder is a temporary structure used in construction to move and position heavy loads.
Launching girder is typically made of steel and consists of multiple sections that can be assembled and disassembled.
It is used in the construction of bridges, viaducts, and other structures to lift and move precast concrete segments into position.
The launching operation involves the step-by-step movement of the girder along...
posted on 30 Nov 2023
I appeared for an interview before Nov 2022.
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
posted on 30 Nov 2022
I applied via Job Portal
I applied via Referral and was interviewed in May 2023. There were 3 interview rounds.
based on 55 reviews
Rating in categories
QA QC Engineer
5
salaries
| ₹3.9 L/yr - ₹4.5 L/yr |
Resident Construction Manager
5
salaries
| ₹6 L/yr - ₹11.8 L/yr |
Deputy Manager
4
salaries
| ₹5.1 L/yr - ₹7 L/yr |
Operations Executive
4
salaries
| ₹2.9 L/yr - ₹2.9 L/yr |
Mechanical Engineer
4
salaries
| ₹2.1 L/yr - ₹5.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company