Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Interarch Building Product Team. If you also belong to the team, you can get access from here

Interarch Building Product Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Interarch Building Product Assistant Manager- HR Interview Questions and Answers

Updated 17 Jul 2021

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Related to Personality assessment
Round 3 - Technical 

(1 Question)

  • Q1. Related to work profile

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Assistant Manager- HR interview:
  • Personality Development
  • Communication Skills
  • Subject Matter Expertise
Interview preparation tips for other job seekers - HE / SHE MUST BE CONFIDENT,COMPASSION,SMART WORKER AND ZEAL.....DONT BE ARTIFICIAL BE AS YOU ARE...
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Aptitude Test 

Electrical engineer related

I applied via Referral and was interviewed in Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Have you worked at heights?
  • Q2. Have you had expected in Steel structures
  • Ans. 

    Yes, I have experience in designing and analyzing steel structures.

    • I have worked on various projects involving steel structures such as bridges, buildings, and industrial facilities.

    • I am familiar with industry standards and codes such as AISC, ASCE, and ACI.

    • I have experience in using software such as STAAD.Pro and SAP2000 for structural analysis and design.

    • I have also conducted site inspections and provided recommendat...

  • Answered by AI
  • Q3. Structural steel grades
  • Q4. Welding types and processes
  • Ans. 

    Welding is a process of joining two or more metal parts by heating the surfaces to their melting points.

    • There are several types of welding such as MIG, TIG, Stick, and Flux-Cored welding.

    • MIG welding uses a wire electrode and a shielding gas to join two metal parts.

    • TIG welding uses a tungsten electrode and a filler metal to join two metal parts.

    • Stick welding uses a consumable electrode and a flux coating to join two met...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Production Engineer interview:
  • Structural Fabrication
  • Erection
  • Work at height
  • Safety Management
Interview preparation tips for other job seekers - Keep calm and all you have to do is manage manpower and other resources

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience, and my scope of work?
  • Q2. Areas of strengths and areas need to develop

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview consisting of two rounds, first is about my personal details, which is intervied by Hr person. the second round is technical one, which was taken by Project director of the particular project. So i advice everyone be confident what you answering them, all the questions were asked about my experience part, and the knowledge what i have gained during the work apart from my education life. They also check all my documents. After completion of my interview and after 1 month, i got the offer letter of this company. Now iam so happy for this achievement. I hope all of the others who were attending for the interviews, hope you all get placed.

Thanks and Regards
Rahman

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About the background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have good job knowledge

I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How to start a new project ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just say what are you doing in the past and what you can do.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

Tell us how to improve this page.

Interarch Building Product Assistant Manager- HR Salary
based on 4 salaries
₹5.9 L/yr - ₹7.2 L/yr
6% less than the average Assistant Manager- HR Salary in India
View more details

Interarch Building Product Assistant Manager- HR Reviews and Ratings

based on 2 reviews

1.4/5

Rating in categories

3.2

Skill development

1.9

Work-life balance

1.4

Salary

4.5

Job security

3.2

Company culture

1.0

Promotions

3.2

Work satisfaction

Explore 2 Reviews and Ratings
Quality Engineer
37 salaries
unlock blur

₹1.5 L/yr - ₹4.6 L/yr

Assistant Manager
32 salaries
unlock blur

₹4.2 L/yr - ₹10 L/yr

Senior Safety Officer
32 salaries
unlock blur

₹3.2 L/yr - ₹6.5 L/yr

Safety Officer
24 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Deputy Manager
21 salaries
unlock blur

₹7 L/yr - ₹13 L/yr

Explore more salaries
Compare Interarch Building Product with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview