I am a dedicated and experienced Purchase Engineer with a strong background in sourcing and procurement.
Over 5 years of experience in purchasing materials and components for manufacturing processes
Proficient in negotiating prices and contracts with suppliers
Skilled in analyzing market trends and identifying cost-saving opportunities
Strong communication and relationship-building skills
Example: Successfully reduced procu...
I gained valuable experience in managing procurement processes, negotiating with suppliers, and ensuring timely delivery of materials.
Managed procurement processes from sourcing to delivery
Negotiated contracts and prices with suppliers
Ensured timely delivery of materials to meet production deadlines
I have extensive experience creating SOPs for purchasing processes.
Developed detailed SOPs outlining purchasing procedures from vendor selection to order placement
Ensured SOPs were compliant with company policies and industry regulations
Regularly reviewed and updated SOPs to reflect changes in purchasing practices
Trained purchasing team members on SOPs to ensure consistency and efficiency in operations
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
ASME Code Section 8 covers pressure vessels while Section 9 covers welding and brazing qualifications.
ASME Code Section 8 provides guidelines for the design, fabrication, inspection, testing, and certification of pressure vessels.
ASME Code Section 9 covers the qualification of welding and brazing procedures, welders, and brazers.
Both sections are important for ensuring the safety and quality of pressure vessel designs
I was interviewed in Dec 2023.
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
Static head formula calculates the pressure at the bottom of a fluid column.
Static head formula: P = ρgh
P is the pressure at the bottom of the fluid column
ρ is the density of the fluid
g is the acceleration due to gravity
h is the height of the fluid column
INOXCVA interview questions for popular designations
I was interviewed before Feb 2024.
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Nov 2022. There were 4 interview rounds.
Basic MCQs from ASME BPVC DIV. 1, Cryogenic properties of LIN, LOX & LAR
The interview questions cover topics related to heat treatment, material properties, and industry standards in engineering.
PWHT (Post Weld Heat Treatment) and PFHT (Preheat and Post Weld Heat Treatment) are required for certain materials to relieve residual stresses and improve mechanical properties.
Stress relieving involves heating the material to a specific temperature and holding it for a period of time to reduce in...
Top trending discussions
I was interviewed before Jul 2016.
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
General information about electronic products which is used in daily life and technical questions related about the electronic equipments.
The duration of INOXCVA interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 9 interviews
Interview experience
based on 113 reviews
Rating in categories
Assistant Manager
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Design Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Linde India
Air Liquide
Praxair
GAIL