Filter interviews by
Siemens plc OB, FB, FV, and DB are different types of blocks used in programming Siemens PLCs.
OB (Organization Block) is used for organizing and controlling the program execution.
FB (Function Block) is used for creating reusable functions or subroutines.
FV (Function Value) is used for passing parameters to function blocks.
DB (Data Block) is used for storing and managing data in the PLC program.
The number of relays in transfer protection varies depending on the specific system and requirements.
The number of relays in transfer protection can range from a few to several dozen, depending on the complexity of the system.
Relays are used in transfer protection to detect faults, isolate faulty sections, and ensure smooth transfer of power.
Examples of relays used in transfer protection include differential relays, di
I applied via Referral and was interviewed before Jan 2019. There were 6 interview rounds.
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Proxy is an intermediary server that acts as a gateway between clients and servers. SMPS is a power supply unit that converts AC to DC. Encoder is a device that converts motion into digital signals. Star delta is a method of starting three-phase motors.
Proxy helps in hiding the identity of clients and servers.
SMPS is commonly used in computers and other electronic devices.
Encoders are used in robotics, automation, and ...
posted on 10 Feb 2022
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Newspaper Ad and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
posted on 30 Dec 2021
I applied via Shine and was interviewed in Dec 2021. There was 1 interview round.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease the voltage of an alternating current (AC) signal.
They consist of two or more coils of wire, known as windings, that are wound around a core made of magnetic material.
The primary winding receives electrical energy from a power source, while t...
Control diagram of a motor with remote and local start using star delta starter.
Use a star delta starter for reduced voltage starting
Include a remote start/stop switch in the control circuit
Use a contactor to switch between star and delta connections
Include overload protection in the circuit
Use a control transformer to step down voltage for control circuit
Include a pilot light to indicate motor status
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
33
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Senior Engineer
27
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Engineer
25
salaries
| ₹2 L/yr - ₹4.3 L/yr |
Deputy Manager
17
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Quality Engineer
13
salaries
| ₹3 L/yr - ₹4.1 L/yr |
Jindal Stainless
Jindal Saw
ESL Steel
Jai Balaji Group