Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by India Japan Lighting Team. If you also belong to the team, you can get access from here

India Japan Lighting Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

India Japan Lighting Team Lead Interview Questions and Answers for Experienced

Updated 3 Feb 2025

India Japan Lighting Team Lead Interview Experiences for Experienced

2 interviews found

Team Lead Interview Questions & Answers

user image Anonymous

posted on 3 Feb 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I appeared for an interview in Aug 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Assembly production
  • Q2. Shop floor

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir Assembly production Team Ledar is g

Team Lead Interview Questions & Answers

user image Anonymous

posted on 24 Sep 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Sep 2023. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Have ever involved in CFT team for new Mould trual
  • Q2. Have You sufficient knowledge of IATF documents explain about each .
  • Q3. Which plastic resign are used in your current company and tell it's manufacturing company.
  • Ans. 

    The plastic resin used in our current company is ABS (Acrylonitrile Butadiene Styrene) manufactured by companies like LG Chem, Chi Mei Corporation, and Styrolution.

    • ABS (Acrylonitrile Butadiene Styrene) is commonly used for its toughness, impact resistance, and heat resistance.

    • LG Chem, Chi Mei Corporation, and Styrolution are some of the major manufacturers of ABS resin.

    • Other commonly used plastic resins in the industry

  • Answered by AI
  • Q4. Brief Description about MTC, Dehumidifier, injection Molding defects and it's trouble shooting
  • Ans. 

    MTC stands for Mold Temperature Control, Dehumidifier is used to reduce moisture in the air, Injection Molding defects can include warping, sink marks, and flash.

    • Mold Temperature Control (MTC) is crucial for maintaining consistent part quality and reducing cycle times in injection molding.

    • Dehumidifiers are used in injection molding facilities to prevent moisture from affecting the quality of the final product.

    • Common in...

  • Answered by AI
Round 2 - HR 

(4 Questions)

  • Q1. Why U want change the current company
  • Ans. 

    Seeking new challenges and growth opportunities in a different environment.

    • Desire for new challenges and opportunities for personal growth

    • Seeking a different work culture or environment

    • Looking for better career advancement prospects

    • Want to broaden skill set and experience in a different industry

    • Company restructuring or downsizing affecting current role

  • Answered by AI
  • Q2. Have you work where employee Union available
  • Ans. 

    Yes, I have worked in a company where employee Union was available.

    • I have experience working in a company where there was an employee Union representing the workers.

    • I have interacted with Union representatives to address employee concerns and negotiate collective bargaining agreements.

    • I have ensured compliance with Union regulations and worked collaboratively with Union leaders to maintain a positive work environment.

  • Answered by AI
  • Q3. Are you comfort to work in shifts
  • Ans. 

    Yes, I am comfortable working in shifts as I have prior experience and understand the importance of flexibility in a team leader role.

    • I have previous experience working in shifts and understand the importance of flexibility in a team leader role.

    • I am willing to adapt my schedule to meet the needs of the team and the organization.

    • I understand the benefits of working in shifts, such as increased coverage and productivity...

  • Answered by AI
  • Q4. Why I hire you
  • Ans. 

    I have a proven track record of successfully leading teams, motivating team members, and achieving goals.

    • I have X years of experience in leadership roles

    • I have a strong ability to communicate effectively with team members

    • I have a history of meeting and exceeding team targets, such as increasing sales by X% in my previous role

  • Answered by AI

Interview Preparation Tips

Topics to prepare for India Japan Lighting Team Lead interview:
  • IATF Documents
  • Plastic processing

Team Lead Interview Questions Asked at Other Companies for Experienced

Q1. write a java program to get maxing profit by buying and selling a ... read more
Q2. 1: What does Test Strategy means ? Test strategy is a document wh ... read more
asked in Delhivery
Q3. How will you calculate volume of a shipment?
Q4. 1) What happens when two positively charged material is placed to ... read more
Q5. A baseball bat and a ball cost 110together, and the bat costs 100 ... read more

Interview questions from similar companies

Interview Questionnaire 

3 Questions

  • Q1. Tell about function of Compressor.
  • Ans. 

    A compressor is a mechanical device that increases the pressure of a gas by reducing its volume.

    • Compressors are used in various applications such as air conditioning, refrigeration, and gas turbines.

    • They work by drawing in low-pressure gas and then compressing it to a higher pressure.

    • Compressors can be classified into positive displacement and dynamic types.

    • Positive displacement compressors use a piston or a rotating m...

  • Answered by AI
  • Q2. GD&T questions.
  • Q3. Engineering drawing related questions.

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality tools
  • Q2. 7 qc tools , why why analysis
  • Ans. 

    The 7 QC tools are used for quality control and the Why Why analysis is used to identify the root cause of a problem.

    • The 7 QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.

    • Why Why analysis involves asking 'why' multiple times to identify the underlying cause of a problem.

    • It helps in identifying the root cause of a problem and taking correctiv...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Done your homework before interview
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basic questions 7qc tools,core tools.
  • Q2. QMS- IATF16949 system related. Problem solving -8D,RCA

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare what you mentioned in your resume. Proactive approach for position which you are applying.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Question will be coming from Math, reasoning and English.

Round 2 - Group Discussion 

Topic always current affairs.

Round 3 - Technical 

(5 Questions)

  • Q1. General Procurement process of any material?
  • Ans. 

    General procurement process involves identifying needs, selecting suppliers, negotiating terms, and managing contracts.

    • Identify the need for the material

    • Research potential suppliers

    • Request for quotations or proposals

    • Negotiate terms and pricing

    • Select the supplier

    • Create a purchase order

    • Receive and inspect the material

    • Pay the supplier

  • Answered by AI
  • Q2. What is zero based costing.
  • Ans. 

    Zero based costing is a method of budgeting where all expenses must be justified for each new period.

    • In zero based costing, all expenses start from zero and must be justified for each new period.

    • It requires managers to analyze and justify all expenses, rather than just making incremental changes to the previous budget.

    • This method can help identify inefficiencies and unnecessary expenses in the budget.

    • Example: A company...

  • Answered by AI
  • Q3. What is vlookup and X Lookup And Differentiate also?
  • Ans. 

    VLOOKUP and XLOOKUP are Excel functions used to search for a value in a table and return a corresponding value.

    • VLOOKUP stands for 'Vertical Lookup' and searches for a value in the first column of a table and returns a value in the same row from a specified column.

    • XLOOKUP is a newer function that can search both vertically and horizontally in a table and has more flexibility in its syntax.

    • VLOOKUP requires the lookup val...

  • Answered by AI
  • Q4. How we can create a pivot table in MS Excel?
  • Ans. 

    To create a pivot table in MS Excel, go to the 'Insert' tab, click on 'PivotTable', select the data range, choose where to place the pivot table, and drag fields into the rows, columns, and values areas.

    • Go to the 'Insert' tab in Excel.

    • Click on 'PivotTable'.

    • Select the data range you want to analyze.

    • Choose where you want to place the pivot table (new worksheet or existing worksheet).

    • Drag and drop fields into the rows, co...

  • Answered by AI
  • Q5. Introduce yourself with 5 strength and examples also.
  • Ans. 

    I am a dedicated and detail-oriented engineer with strengths in problem-solving, communication, teamwork, adaptability, and technical skills.

    • Problem-solving: Successfully resolved a complex technical issue by analyzing data and implementing a creative solution.

    • Communication: Effectively communicated project updates and requirements to team members and stakeholders.

    • Teamwork: Collaborated with cross-functional teams to a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sanden Vikas Engineer interview:
  • MS Excel and ERP
Interview preparation tips for other job seekers - Good knowledge in the field of ERP software and MS Office and it will help you more in interview.
You will get advantages in your work profession.

I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why do you want to change ?
Round 3 - Technical 

(1 Question)

  • Q1. Tell me about the previous job ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patient , calm and composed. Don't be in a hurry. Negotiate well for your salary. Aim too high.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself and details of work you are doing
  • Q2. Expertise in Excel, Word, frequent travel at vendor end

Interview Preparation Tips

Topics to prepare for S. M. Auto Engineering Engineer interview:
  • Excel
  • SAP
  • AutoCAD
  • CATIA
Interview preparation tips for other job seekers - Great place to learn in initial stage of career and in retirement phase, you will get extension after your retirement

I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Basic details about you and previous company experience
Round 2 - Technical 

(3 Questions)

  • Q1. GD&T , drawing level of understandings,auto-cad drawings comments ,basic knowledge about ERP systems
  • Q2. About Drawing symbols
  • Q3. Autocad drawing comments

Interview Preparation Tips

Interview preparation tips for other job seekers - Do the interviews with strong mind & confidence.All the best for interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There were 4 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Normal related to previous experience, about family background, expected salary.
Round 2 - Technical 

(1 Question)

  • Q1. About previous job profile and responsibilities related to project. Basic questions about your relevant field. Some questions about in which post you were going to hire.
Round 3 - Design Test 

(1 Question)

  • Q1. CAD test thus I am Design Engineer
Round 4 - HR 

(1 Question)

  • Q1. Regarding salary and other facilities

Interview Preparation Tips

Interview preparation tips for other job seekers - PVNA is a very good company and very good management. If you get chance to work you should go there.

India Japan Lighting Interview FAQs

How many rounds are there in India Japan Lighting Team Lead interview for experienced candidates?
India Japan Lighting interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the India Japan Lighting interview process for experienced candidates are Technical, HR and One-on-one Round.
What are the top questions asked in India Japan Lighting Team Lead interview for experienced candidates?

Some of the top questions asked at the India Japan Lighting Team Lead interview for experienced candidates -

  1. Which plastic resign are used in your current company and tell it's manufacturi...read more
  2. Brief Description about MTC, Dehumidifier, injection Molding defects and it's t...read more
  3. Have You sufficient knowledge of IATF documents explain about eac...read more

Tell us how to improve this page.

India Japan Lighting Team Lead Interview Process for Experienced

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Knorr-Bremse Interview Questions
3.9
 • 56 Interviews
Sanden Vikas Interview Questions
4.0
 • 45 Interviews
Adient Interview Questions
4.0
 • 18 Interviews
View all
India Japan Lighting Team Lead Salary
based on 99 salaries
₹1.5 L/yr - ₹4.3 L/yr
70% less than the average Team Lead Salary in India
View more details

India Japan Lighting Team Lead Reviews and Ratings

based on 33 reviews

4.3/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

3.3

Salary

3.8

Job security

4.3

Company culture

3.2

Promotions

3.6

Work satisfaction

Explore 33 Reviews and Ratings
Junior Engineer
153 salaries
unlock blur

₹1.6 L/yr - ₹3.5 L/yr

Engineer
114 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Senior Engineer
114 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Assistant Engineer
113 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Team Lead
99 salaries
unlock blur

₹1.5 L/yr - ₹4.3 L/yr

Explore more salaries
Compare India Japan Lighting with

Knorr-Bremse

3.8
Compare

Sanden Vikas

4.0
Compare

Victora Auto Private Limited

3.9
Compare

Gestamp

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview