Filter interviews by
I applied via Naukri.com and was interviewed in May 2019. There were 4 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Nov 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
The Soil Bearing Capacity of Adyar varies depending on the specific location and soil composition.
Soil bearing capacity is typically measured in terms of pressure per unit area that the soil can support without failure.
Factors affecting soil bearing capacity include soil type, moisture content, compaction, and depth.
For Adyar, the soil bearing capacity can range from 1000 to 5000 kN/m^2 depending on the specific locati
I applied via Pradeep and was interviewed in Feb 2024. There was 1 interview round.
1st angle projection is commonly used in the United States, while 3rd angle projection is more commonly used in Europe and Asia.
1st angle projection places the object in the first quadrant, with the front view on the right and the top view on top.
3rd angle projection places the object in the third quadrant, with the front view on the left and the top view on top.
1st angle projection is commonly used in the United State...
Two-stroke engines have a power stroke every revolution, while four-stroke engines have a power stroke every other revolution.
Two-stroke engines have a simpler design with fewer moving parts compared to four-stroke engines.
Two-stroke engines require a fuel-oil mixture for lubrication, while four-stroke engines have a separate oil system.
Two-stroke engines are lighter and have a higher power-to-weight ratio than four-st...
5S is a workplace organization method, Kaizen is continuous improvement, and Poka Yoke is error-proofing.
5S types refer to Sort, Set in order, Shine, Standardize, and Sustain for workplace organization.
Kaizen is a Japanese term for continuous improvement in processes and products.
Poka Yoke is a mistake-proofing technique to prevent errors in manufacturing processes.
Example: Implementing 5S in a factory to improve effic...
SQTCM stands for Software Quality Testing and Control Management. It is a process that ensures software products meet quality standards.
SQTCM involves creating test plans and test cases to ensure software functionality meets requirements
It includes conducting various types of testing such as unit testing, integration testing, and system testing
SQTCM also involves tracking defects and issues found during testing and ens
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 2 interview rounds.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
Software or tool test
Engineer- Customer Support
60
salaries
| ₹4 L/yr - ₹8.1 L/yr |
Senior Engineer
33
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Assistant Manager
32
salaries
| ₹7.6 L/yr - ₹12.5 L/yr |
Service Engineer
30
salaries
| ₹2.2 L/yr - ₹6.7 L/yr |
Product Manager
16
salaries
| ₹7 L/yr - ₹16.8 L/yr |
Apotex Research
BCD Travel
Saud Bahwan Group
Bahwan Engineering