Upload Button Icon Add office photos

Filter interviews by

Holista Tranzworld Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Egerly they asked questions about your inner confidence of tha job seekers

Interview Preparation Tips

Interview preparation tips for other job seekers - Ntg is impossible first you consatret your looking i meen your dress sens... first impression is tha best impression so u look complete formally & kindly answer tha questions very confidently ..be honest delivered good communication skills

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY

Interview Questionnaire 

1 Question

  • Q1. What's is your ambition

Interview Preparation Tips

Interview preparation tips for other job seekers - Go and attend the interview with fearless
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Mcq

Interview Preparation Tips

Topics to prepare for Busibud Software Developer interview:
  • C
  • C++
Interview preparation tips for other job seekers - I am fullstack software developer.And i have no experience.

I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Program we're asked based on html

Interview Preparation Tips

Interview preparation tips for other job seekers - no advice to be given the he was good and it nice experience

I applied via Recruitment Consultant and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Realted to my previous job

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in answering to the interviewer
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced business analyst with a background in data analysis and process improvement.

    • Over 5 years of experience in analyzing business processes and identifying areas for improvement

    • Skilled in data analysis tools such as Excel, SQL, and Tableau

    • Strong communication and problem-solving skills

    • Led a project to streamline inventory management processes, resulting in a 20% reduction in costs

  • Answered by AI
  • Q2. Tell me about your roles and responsibilities
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. What are the seven quality control tools, and can you provide explanations for each?
  • Ans. 

    The seven quality control tools are essential for process improvement and problem-solving in engineering.

    • Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.

    • Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.

    • Cause-and-effect diagram (Fishbone diagram): Visuali...

  • Answered by AI
  • Q2. 5S and visual management
  • Q3. What are the seven steps of autonomous maintenance?
  • Ans. 

    Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.

    • Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.

    • Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.

    • Step 3: General Inspection - Operators visually inspect the ...

  • Answered by AI
  • Q4. What are the calculations involved in Overall Equipment Effectiveness (OEE)?
  • Ans. 

    OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.

    • Calculate Availability by dividing Operating Time by Planned Production Time.

    • Calculate Performance by dividing Actual Production by Maximum Possible Production.

    • Calculate Quality by dividing Good Units Produced by Total Units Started.

  • Answered by AI
  • Q5. Why is it mandatory for an organization to implement lean practices?
  • Ans. 

    Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.

    • Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.

    • By implementing lean practices, organizations can improve quality control and reduce defects in products or services.

    • Lean practices promote continuous improvement and empower ...

  • Answered by AI
  • Q6. How can downstream team members be motivated?
  • Ans. 

    Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.

    • Provide recognition for their hard work and achievements

    • Communicate clearly about goals, expectations, and feedback

    • Offer opportunities for growth and development, such as training or mentorship programs

    • Create a positive work environment through team-building activities a

  • Answered by AI
  • Q7. What is Pareto analysis and how is it applied in decision-making processes?
  • Ans. 

    Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.

    • Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.

    • It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.

    • By focusing on addressing the most critical fact...

  • Answered by AI
  • Q8. What is a Gemba walk, and how is it performed?
  • Ans. 

    A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.

    • Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.

    • Managers should focus on understanding the work being done and the challenges faced by employees.

    • Gemba walks help in building relationships with employees and fostering a culture of c...

  • Answered by AI
  • Q9. What are the steps involved in performing safety risk assessments?
  • Ans. 

    Steps involved in performing safety risk assessments

    • Identify hazards and potential risks

    • Assess the likelihood and severity of each risk

    • Implement control measures to mitigate risks

    • Monitor and review the effectiveness of control measures

    • Document findings and recommendations

    • Communicate risks to relevant stakeholders

  • Answered by AI
  • Q10. Explain about TPM
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.

    • It involves autonomous maintenance, planned maintenance, and focused improvement activities.

    • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...

  • Answered by AI

Holista Tranzworld Interview FAQs

How to prepare for Holista Tranzworld interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Holista Tranzworld. The most common topics and skills that interviewers at Holista Tranzworld expect are Project Management, Chemical Analysis, Chemical Testing, Competitive Sales Analysis and Dispatch Scheduling.

Tell us how to improve this page.

Interview Questions from Similar Companies

Busibud Interview Questions
4.0
 • 42 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
KHY ELECTRONIC Interview Questions
3.7
 • 27 Interviews
Patil Group Interview Questions
3.8
 • 25 Interviews
InsanelyGood Interview Questions
4.1
 • 19 Interviews
View all

Holista Tranzworld Reviews and Ratings

based on 6 reviews

4.0/5

Rating in categories

2.9

Skill development

3.8

Work-life balance

3.7

Salary

3.3

Job security

3.7

Company culture

3.3

Promotions

3.7

Work satisfaction

Explore 6 Reviews and Ratings
Quality Executive
4 salaries
unlock blur

₹1.8 L/yr - ₹5.7 L/yr

Finance Manager
3 salaries
unlock blur

₹9 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Holista Tranzworld with

Amazon Sellers Services

4.0
Compare

Primus Global Technologies

3.9
Compare

GAMMON INDIA

3.8
Compare

Practo

3.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview