Upload Button Icon Add office photos

Filter interviews by

Hll Infra Tech Services Site Supervisor, Site in Charge and Site Engineer Interview Questions and Answers

Updated 7 Feb 2021

Hll Infra Tech Services Site Supervisor, Site in Charge and Site Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Feb 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Please say about your self,tell me 10 sentence in Hindi and English,Why are you left your privious job, How many types of filters used in hospital.
  • Ans. 

    I am a Site Supervisor with experience in managing construction projects. I can speak both Hindi and English fluently. I left my previous job due to personal reasons. There are various types of filters used in hospitals for air purification.

    • I have worked as a Site Supervisor, overseeing construction projects and ensuring smooth operations.

    • I am proficient in both Hindi and English languages, allowing effective communica...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare 10 sentence in Hindi or English and also prepare self introduction.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the hydraulic gradient line?
  • Q2. What are the methods for managing floods?
  • Q3. What is prestress concrete?
  • Q4. What is Flood Wall?

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain a positive attitude and demonstrate a willingness to learn.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. How to grow up to other company
  • Ans. 

    To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.

    • Network with professionals in your industry to learn about job opportunities

    • Attend industry events, conferences, and workshops to expand your knowledge and skills

    • Update your resume with your latest projects, achievements, and certifications

    • Practice for interviews by research...

  • Answered by AI
  • Q2. How will do interview with another company
  • Q3. I want to know everything is new company
  • Q4. I want to know new company wor management and had office staff
  • Q5. I want know my new company work location

Interview Preparation Tips

Interview preparation tips for other job seekers - Time management it very important with manpower and machine
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. : What are some of the biggest challenges civil engineers face?
  • Ans. 

    Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.

    • Managing project budgets effectively to avoid cost overruns

    • Dealing with unexpected site conditions such as soil instability or environmental hazards

    • Ensuring compliance with regulations and obtaining necessary permits

    • Balancing the needs of various stakeho...

  • Answered by AI
  • Q2. What is your favorite role on a project team? How do you react to a task you're not sure how to approach?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Draw a Bar bending schedule
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There were 9 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. This is information to company
  • Q2. This is company sites through
  • Q3. This company is highly growth
  • Q4. This is responsible for the employee
Round 2 - Technical 

(2 Questions)

  • Q1. Bar bending shedule in this question
  • Q2. What are you quality control
  • Ans. 

    Quality control is a process used to ensure that products or services meet specified requirements and standards.

    • Quality control involves inspecting, testing, and evaluating products or services to ensure they meet quality standards.

    • It also includes identifying defects or deviations from specifications and taking corrective actions.

    • Quality control helps to prevent defects, improve processes, and enhance customer satisfa...

  • Answered by AI
Round 3 - Group Discussion 

This is company at the high economy

Round 4 - Aptitude Test 

Number system and latter

Round 5 - Coding Test 

On basis of defined structure

Round 6 - One-on-one 

(1 Question)

  • Q1. The information to company
Round 7 - Case Study 

This check the soil testing

Round 8 - Assignment 

This is growth process in the employee

Round 9 - So interested your job profile 

(1 Question)

  • Q1. I like this with company

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Site planning , binding work ,
  • Q2. Drawing work auto CAD
  • Q3. Billing engineer, work s
  • Q4. Salary Client al

Interview Preparation Tips

Topics to prepare for L & W Constructions Civil Site Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Site engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. I am fresher and 3 month job in Maharashtra civil site engineer engineer on duty and I am a final year student
Round 2 - Material related 

(4 Questions)

  • Q1. Concrete material
  • Q2. Type of material
  • Ans. 

    Civil engineers work with a variety of materials including concrete, steel, asphalt, and wood.

    • Common materials used in civil engineering include concrete, steel, asphalt, wood, and aggregates.

    • Concrete is used for foundations, roads, and structures.

    • Steel is used for beams, columns, and reinforcement.

    • Asphalt is used for roads and pavements.

    • Wood is used for formwork, bridges, and buildings.

    • Aggregates are used in concrete

  • Answered by AI
  • Q3. Material distribution
  • Q4. Normal material

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Only Document Verification
Round 3 - Technical 

(2 Questions)

  • Q1. Explain about Initial and Routine Pile Load Test
  • Ans. 

    Initial and Routine Pile Load Tests are conducted to assess the load-bearing capacity and performance of piles.

    • Initial Pile Load Test is performed on a single pile to determine its ultimate load capacity and settlement behavior.

    • Routine Pile Load Test is conducted on a representative sample of piles to verify the design assumptions and ensure the desired performance.

    • Initial Pile Load Test involves applying a gradually i...

  • Answered by AI
  • Q2. Explain about Performance Test of Elastomeric Bearings
  • Ans. 

    Performance test of elastomeric bearings evaluates their ability to withstand load, deformation, and environmental conditions.

    • Performance test assesses the load-carrying capacity of elastomeric bearings.

    • It measures the deformation and displacement under different loads.

    • Tests evaluate the behavior of bearings under various environmental conditions like temperature and moisture.

    • Performance tests ensure the durability, st...

  • Answered by AI

Skills evaluated in this interview

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 414 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
View all
Assistant Project Engineer
35 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Project Engineer
30 salaries
unlock blur

₹6 L/yr - ₹10 L/yr

Project Engineer - Civil
13 salaries
unlock blur

₹8 L/yr - ₹9.1 L/yr

Account Assistant
12 salaries
unlock blur

₹2.8 L/yr - ₹4.2 L/yr

Senior Manager
9 salaries
unlock blur

₹6 L/yr - ₹17.5 L/yr

Explore more salaries
Compare Hll Infra Tech Services with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview