Upload Button Icon Add office photos

Filter interviews by

Hitek Engineering Services Interview Questions, Process, and Tips

Updated 19 Mar 2025

Top Hitek Engineering Services Interview Questions and Answers

View all 8 questions

Hitek Engineering Services Interview Experiences

Popular Designations

5 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of electrical engineering questions, earthing types
  • Q2. Type of earthing types function of induction motor
  • Ans. 

    Earthing types include TT, TN-S, TN-C-S, and IT. Induction motors convert electrical energy into mechanical energy.

    • Earthing types are used to provide a safe path for electrical current to flow to the ground.

    • TT earthing involves a separate earth electrode for each electrical system.

    • TN-S earthing uses a combined neutral and protective earth conductor.

    • TN-C-S earthing combines the neutral and protective earth conductors up...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - make your basics very clear,
about contactor,mcb,vfd etc

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Hirect and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introducing ourselves and professional background
Round 3 - Technical 

(2 Questions)

  • Q1. Work profile and responsibilties of previous organisation.
  • Q2. Family background and ways of income sources? (As they wanted to know , if they can hold the salary)

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary is 1 or 2 months delayed. HR ,director and manager are the most hopeless beings.
I got my appointment letter post 1 month that too after writing to them.

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)

I applied via Referral and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What will you do to a customer complaint registered under your command
  • Ans. 

    I will promptly investigate the complaint, apologize for any inconvenience caused, and take necessary steps to resolve the issue.

    • Listen to the customer's complaint with empathy

    • Apologize for any inconvenience caused

    • Investigate the complaint promptly

    • Take necessary steps to resolve the issue

    • Follow up with the customer to ensure satisfaction

  • Answered by AI
  • Q2. How will you ensure vendor deliveries with quality price and timely
  • Ans. 

    I will establish clear communication channels with vendors and implement a robust quality control system.

    • Establish clear communication channels with vendors to ensure timely delivery

    • Implement a robust quality control system to ensure high-quality deliveries

    • Regularly review vendor performance and provide feedback to improve future deliveries

    • Negotiate favorable pricing terms with vendors to ensure cost-effectiveness

    • Maint...

  • Answered by AI
  • Q3. How will you act to a team member in your team reporting late everyday and doing good performance
  • Q4. Whats the failure you faced and how did you react and respond to to prevent

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear on the JD and if the JD don't match 60% with your expertise or experience do not attempt to submit cv as your cv will flood the market and that may devalue yourself

Commercial Manager Interview Questions asked at other Companies

Q1. How can you satisfy the management requirements through your services pertaining to sales distribution & related services
View answer (9)

Project Engineer Interview Questions & Answers

user image Sounak Saha

posted on 19 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Mvws vs hvws spray system in fire fighting
  • Ans. 

    MVWS and HVWS are fire fighting spray systems with different applications and effectiveness based on fire type and environment.

    • MVWS (Medium Velocity Water Spray) systems use water sprays at medium velocities, effective for cooling and controlling fires.

    • HVWS (High Velocity Water Spray) systems discharge water at high velocities, suitable for extinguishing large fires and protecting structures.

    • MVWS is often used in indus...

  • Answered by AI
  • Q2. How to do hydrotest and at what pressure.
  • Ans. 

    Hydrotesting involves filling a system with water to check for leaks at a specified pressure, typically 1.5 times the design pressure.

    • 1. Prepare the system by cleaning and inspecting it for any visible defects.

    • 2. Fill the system with water, ensuring all air is purged from the lines.

    • 3. Gradually increase the pressure to the test pressure, usually 1.5 times the maximum allowable working pressure (MAWP).

    • 4. Maintain the te...

  • Answered by AI
  • Q3. Welding type smaw & mig.
  • Q4. Water calculation in hydrant system

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)

Hitek Engineering Services interview questions for popular designations

 Project Engineer

 (3)

 Electrical Engineer

 (1)

 Commercial Manager

 (1)

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Apna Jobs and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Only salary discussion
Round 3 - Technical 

(4 Questions)

  • Q1. How to handle your site.
  • Q2. You have knowledge about MS Excel or PPT.
  • Q3. Please explain welding procedure
  • Ans. 

    Welding procedure involves joining two materials together using heat and pressure.

    • Select appropriate welding method based on materials being joined

    • Prepare materials by cleaning and removing any contaminants

    • Set up welding equipment and ensure proper safety measures are in place

    • Weld materials together using the selected method

    • Inspect the weld for quality and make any necessary adjustments

  • Answered by AI
  • Q4. How to select welding consumables
  • Ans. 

    Welding consumables should be selected based on factors like base metal, welding process, mechanical properties required, and environmental conditions.

    • Consider the type of base metal being welded

    • Choose the appropriate welding process (e.g. MIG, TIG, stick)

    • Determine the mechanical properties required for the weld joint

    • Take into account the environmental conditions of the welding site

    • Consult with welding engineers or sup

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Hitek Engineering Services Project Engineer interview:
  • Only site knowledge is enough
Interview preparation tips for other job seekers - Don't join if you go for learn or develop your skills.
If you have financial problems, and any options, the you go for that.
Otherwise I suggest don't join.

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All aboutElectrical distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is purely based on electrical basics and they asked questions only from your resume please prepare your resume clearly
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Substation related questions
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation

I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Work profile,qualifications,subjects
  • Q2. How to handle problem
  • Ans. 

    Handling problems involves identifying the issue, analyzing it, developing a solution, and implementing it.

    • Identify the problem by gathering information and understanding the root cause.

    • Analyze the problem by breaking it down into smaller components and evaluating possible solutions.

    • Develop a solution by brainstorming ideas, considering constraints, and selecting the most effective approach.

    • Implement the solution by cr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep elaborate the things but final call will be based on performance only

Interview Questionnaire 

4 Questions

  • Q1. Instrumentation Basics
  • Q2.  DCS Architecture for various Projects handled in my career
  • Ans. 

    I have worked on various DCS architectures in my career, including those for chemical plants and power plants.

    • Designed and implemented DCS architecture for a chemical plant project

    • Developed DCS architecture for a power plant project

    • Worked on DCS architecture for a water treatment plant project

    • Collaborated with team to create DCS architecture for a pharmaceutical plant project

  • Answered by AI
  • Q3. Boiler Process and Logic Configurations
  • Q4. Package Negotiation

Interview Preparation Tips

Round: Resume Shortlist
Experience: DCS and Industrial Automation

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(11 Questions)

  • Q1. Introduce yourself briefly?
  • Ans. 

    I am a highly skilled and experienced Project Engineer with a strong background in managing complex engineering projects.

    • Over 10 years of experience in project management and engineering

    • Proficient in utilizing project management software and tools

    • Strong leadership and communication skills

    • Proven track record of successfully delivering projects on time and within budget

    • Experience in coordinating with cross-functional tea...

  • Answered by AI
  • Q2. What projects you have done in previous company
  • Ans. 

    I have worked on various projects in my previous company, including the construction of a new office building and the implementation of a software system for project management.

    • Construction of a new office building

    • Implementation of a software system for project management

  • Answered by AI
  • Q3. What is lifecycle of project
  • Ans. 

    The lifecycle of a project refers to the stages it goes through from initiation to closure.

    • Initiation: project is defined and approved

    • Planning: project objectives, scope, and resources are determined

    • Execution: project plan is put into action

    • Monitoring and Control: project progress is tracked and necessary adjustments are made

    • Closure: project is completed and evaluated

    • Examples: construction of a building, development of...

  • Answered by AI
  • Q4. What are the industrial communication protocols
  • Ans. 

    Industrial communication protocols are standards for data exchange between devices in industrial automation and control systems.

    • Some common industrial communication protocols include Modbus, Profibus, DeviceNet, Ethernet/IP, and CANopen.

    • These protocols enable devices from different manufacturers to communicate with each other and exchange data.

    • Industrial communication protocols can be wired or wireless, and can operate...

  • Answered by AI
  • Q5. What are the settings required in MODBUS
  • Ans. 

    MODBUS settings include baud rate, parity, data bits, stop bits, and slave address.

    • Baud rate determines the speed of communication between devices.

    • Parity is used for error checking and can be set to even, odd, or none.

    • Data bits determine the number of bits used to represent each character.

    • Stop bits indicate the end of a character and can be set to 1 or 2.

    • Slave address is used to identify the device on the network.

    • Examp...

  • Answered by AI
  • Q6. Maximum speed in modbus
  • Ans. 

    The maximum speed in Modbus depends on the baud rate and cable length.

    • Modbus speed is measured in baud rate

    • Higher baud rates allow for faster data transfer

    • Cable length can also affect the maximum speed

    • For example, at 9600 baud rate, the maximum cable length is 1200 meters

  • Answered by AI
  • Q7. How many device add in modbus
  • Ans. 

    The number of devices that can be added in Modbus depends on the network architecture and the number of available addresses.

    • The maximum number of devices that can be added to a Modbus network is 247.

    • The number of available addresses depends on the type of Modbus protocol used (RTU or TCP/IP).

    • The network architecture also plays a role in determining the number of devices that can be added.

    • It is important to ensure that ...

  • Answered by AI
  • Q8. Types of modbus communication
  • Ans. 

    Modbus communication types include RTU, ASCII, and TCP/IP.

    • RTU (Remote Terminal Unit) is a serial communication protocol that uses binary code to transmit data.

    • ASCII (American Standard Code for Information Interchange) is a serial communication protocol that uses ASCII characters to transmit data.

    • TCP/IP (Transmission Control Protocol/Internet Protocol) is a network communication protocol that uses Ethernet to transmit d...

  • Answered by AI
  • Q9. On which scada you are worked
  • Ans. 

    I have worked on multiple SCADA systems including Wonderware, Ignition, and Inductive Automation.

    • I have experience with configuring and programming SCADA systems

    • I have worked with Wonderware, Ignition, and Inductive Automation

    • I am familiar with creating HMI screens, alarms, and trends

    • I have experience with PLC communication and data acquisition

    • I have worked on projects in various industries including manufacturing and

  • Answered by AI
  • Q10. What is maximum Input output handle
  • Ans. 

    The maximum input output handle refers to the maximum number of inputs and outputs that a device can handle.

    • The maximum input output handle varies depending on the device and its specifications.

    • It is important to consider the maximum input output handle when selecting a device for a project.

    • For example, a PLC may have a maximum input output handle of 256 inputs and 256 outputs.

    • Another example is a microcontroller with ...

  • Answered by AI
  • Q11. How many pages designed in HMI
  • Ans. 

    The number of pages designed in HMI depends on the project requirements and complexity.

    • The number of pages can range from a few to hundreds depending on the project scope.

    • The complexity of the HMI design and functionality also affects the number of pages.

    • Factors such as user interface, data visualization, and system integration can impact the number of pages.

    • It is important to prioritize user experience and ease of nav

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Currently they having vacancy for project engineer who is having experience of process automation in oil and gas field,chemical.

Skills evaluated in this interview

Hitek Engineering Services Interview FAQs

How many rounds are there in Hitek Engineering Services interview?
Hitek Engineering Services interview process usually has 2 rounds. The most common rounds in the Hitek Engineering Services interview process are Technical, Resume Shortlist and HR.
How to prepare for Hitek Engineering Services interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Hitek Engineering Services. The most common topics and skills that interviewers at Hitek Engineering Services expect are Banking, E-Tendering, Excel, MS Office and Marketing.
What are the top questions asked in Hitek Engineering Services interview?

Some of the top questions asked at the Hitek Engineering Services interview -

  1. What will you do to a customer complaint registered under your comm...read more
  2. How will you ensure vendor deliveries with quality price and tim...read more
  3. How to do hydrotest and at what pressu...read more

Tell us how to improve this page.

Hitek Engineering Services Interview Process

based on 4 interviews

Interview experience

2.3
  
Poor
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 260 Interviews
ABB Interview Questions
4.1
 • 243 Interviews
John Deere Interview Questions
4.1
 • 238 Interviews
Cummins Interview Questions
4.3
 • 235 Interviews
Caterpillar Inc Interview Questions
4.2
 • 178 Interviews
KONE Interview Questions
4.1
 • 109 Interviews
Hitachi Interview Questions
4.0
 • 82 Interviews
View all

Hitek Engineering Services Reviews and Ratings

based on 43 reviews

3.2/5

Rating in categories

3.0

Skill development

2.9

Work-life balance

2.5

Salary

2.6

Job security

2.5

Company culture

2.5

Promotions

3.2

Work satisfaction

Explore 43 Reviews and Ratings
Project Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Account Assistant
9 salaries
unlock blur

₹1.1 L/yr - ₹4.6 L/yr

Electrical Engineer
8 salaries
unlock blur

₹1.2 L/yr - ₹3.6 L/yr

Project Manager
7 salaries
unlock blur

₹5.7 L/yr - ₹13.6 L/yr

Site Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Hitek Engineering Services with

John Deere

4.1
Compare

Thermax Limited

4.1
Compare

Cummins

4.3
Compare

ABB

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview