Upload Button Icon Add office photos

Filter interviews by

Hitek Engineering Services Project Engineer Interview Questions and Answers

Updated 14 Oct 2023

Hitek Engineering Services Project Engineer Interview Experiences

2 interviews found

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Hirect and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introducing ourselves and professional background
Round 3 - Technical 

(2 Questions)

  • Q1. Work profile and responsibilties of previous organisation.
  • Q2. Family background and ways of income sources? (As they wanted to know , if they can hold the salary)

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary is 1 or 2 months delayed. HR ,director and manager are the most hopeless beings.
I got my appointment letter post 1 month that too after writing to them.
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Apna Jobs and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Only salary discussion
Round 3 - Technical 

(4 Questions)

  • Q1. How to handle your site.
  • Q2. You have knowledge about MS Excel or PPT.
  • Q3. Please explain welding procedure
  • Ans. 

    Welding procedure involves joining two materials together using heat and pressure.

    • Select appropriate welding method based on materials being joined

    • Prepare materials by cleaning and removing any contaminants

    • Set up welding equipment and ensure proper safety measures are in place

    • Weld materials together using the selected method

    • Inspect the weld for quality and make any necessary adjustments

  • Answered by AI
  • Q4. How to select welding consumables
  • Ans. 

    Welding consumables should be selected based on factors like base metal, welding process, mechanical properties required, and environmental conditions.

    • Consider the type of base metal being welded

    • Choose the appropriate welding process (e.g. MIG, TIG, stick)

    • Determine the mechanical properties required for the weld joint

    • Take into account the environmental conditions of the welding site

    • Consult with welding engineers or sup

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Hitek Engineering Services Project Engineer interview:
  • Only site knowledge is enough
Interview preparation tips for other job seekers - Don't join if you go for learn or develop your skills.
If you have financial problems, and any options, the you go for that.
Otherwise I suggest don't join.

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions will be related to the post which company is offering.
  • Q2. Should be very accurate to all electronics queries

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart and to the point answers will help.

I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions on Process,Simulation, CAD

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain Compilation process steps?
  • Ans. 

    Compilation process involves several steps to convert source code into executable code.

    • Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.

    • Compilation: Translates source code into assembly code.

    • Assembly: Converts assembly code into machine code.

    • Linking: Combines object files and libraries to create an executable file.

    • Loading: Loads the executable file into memory and prepares it

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well prior the interview, revise all the basic concepts of Embedded C and MATLAB if you have applied for embedded systems.

I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Sourcing and Vendor development related

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical of ZBC and Manufacturing process.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is your experiencce
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Ask machine knowledge

I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basic of fabrication, materials welding processes, distortion control methods, lifting techniques
  • Q2. Telephonic conversation regarding basics of welding and material properties
  • Q3. Interview with a panel of 4 judges
  • Q4. Salary negotiation notice period etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared. Be honest. Say no if you don't know the answer instead of guessing or pretending

Hitek Engineering Services Interview FAQs

How many rounds are there in Hitek Engineering Services Project Engineer interview?
Hitek Engineering Services interview process usually has 3 rounds. The most common rounds in the Hitek Engineering Services interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Hitek Engineering Services Project Engineer interview?

Some of the top questions asked at the Hitek Engineering Services Project Engineer interview -

  1. How to select welding consumab...read more
  2. Please explain welding proced...read more
  3. You have knowledge about MS Excel or P...read more

Tell us how to improve this page.

Hitek Engineering Services Project Engineer Interview Process

based on 2 interviews

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 250 Interviews
Cummins Interview Questions
4.3
 • 231 Interviews
John Deere Interview Questions
4.1
 • 228 Interviews
Caterpillar Inc Interview Questions
4.3
 • 176 Interviews
KONE Interview Questions
4.1
 • 101 Interviews
Hitachi Interview Questions
4.0
 • 81 Interviews
Atlas Copco Interview Questions
4.2
 • 78 Interviews
View all
Hitek Engineering Services Project Engineer Salary
based on 16 salaries
₹1.8 L/yr - ₹6 L/yr
17% less than the average Project Engineer Salary in India
View more details

Hitek Engineering Services Project Engineer Reviews and Ratings

based on 3 reviews

1.2/5

Rating in categories

1.7

Skill development

1.7

Work-life balance

1.0

Salary

1.7

Job security

1.0

Company culture

1.0

Promotions

1.2

Work satisfaction

Explore 3 Reviews and Ratings
Project Engineer
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Account Assistant
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Hitek Engineering Services with

John Deere

4.1
Compare

Thermax Limited

4.1
Compare

Cummins

4.3
Compare

ABB

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview