Hitek Engineering Services Project Engineer Interview Questions, Process, and Tips

Updated 19 Mar 2025

Top Hitek Engineering Services Project Engineer Interview Questions and Answers

Hitek Engineering Services Project Engineer Interview Experiences

3 interviews found

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Hirect and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introducing ourselves and professional background
Round 3 - Technical 

(2 Questions)

  • Q1. Work profile and responsibilties of previous organisation.
  • Q2. Family background and ways of income sources? (As they wanted to know , if they can hold the salary)

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary is 1 or 2 months delayed. HR ,director and manager are the most hopeless beings.
I got my appointment letter post 1 month that too after writing to them.

Project Engineer Interview Questions & Answers

user image Sounak Saha

posted on 19 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Mvws vs hvws spray system in fire fighting
  • Ans. 

    MVWS and HVWS are fire fighting spray systems with different applications and effectiveness based on fire type and environment.

    • MVWS (Medium Velocity Water Spray) systems use water sprays at medium velocities, effective for cooling and controlling fires.

    • HVWS (High Velocity Water Spray) systems discharge water at high velocities, suitable for extinguishing large fires and protecting structures.

    • MVWS is often used in indus...

  • Answered by AI
  • Q2. How to do hydrotest and at what pressure.
  • Ans. 

    Hydrotesting involves filling a system with water to check for leaks at a specified pressure, typically 1.5 times the design pressure.

    • 1. Prepare the system by cleaning and inspecting it for any visible defects.

    • 2. Fill the system with water, ensuring all air is purged from the lines.

    • 3. Gradually increase the pressure to the test pressure, usually 1.5 times the maximum allowable working pressure (MAWP).

    • 4. Maintain the te...

  • Answered by AI
  • Q3. Welding type smaw & mig.
  • Q4. Water calculation in hydrant system

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Apna Jobs and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Only salary discussion
Round 3 - Technical 

(4 Questions)

  • Q1. How to handle your site.
  • Q2. You have knowledge about MS Excel or PPT.
  • Q3. Please explain welding procedure
  • Ans. 

    Welding procedure involves joining two materials together using heat and pressure.

    • Select appropriate welding method based on materials being joined

    • Prepare materials by cleaning and removing any contaminants

    • Set up welding equipment and ensure proper safety measures are in place

    • Weld materials together using the selected method

    • Inspect the weld for quality and make any necessary adjustments

  • Answered by AI
  • Q4. How to select welding consumables
  • Ans. 

    Welding consumables should be selected based on factors like base metal, welding process, mechanical properties required, and environmental conditions.

    • Consider the type of base metal being welded

    • Choose the appropriate welding process (e.g. MIG, TIG, stick)

    • Determine the mechanical properties required for the weld joint

    • Take into account the environmental conditions of the welding site

    • Consult with welding engineers or sup

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Hitek Engineering Services Project Engineer interview:
  • Only site knowledge is enough
Interview preparation tips for other job seekers - Don't join if you go for learn or develop your skills.
If you have financial problems, and any options, the you go for that.
Otherwise I suggest don't join.

Interview questions from similar companies

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions will be related to the post which company is offering.
  • Q2. Should be very accurate to all electronics queries

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart and to the point answers will help.

I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Sourcing and Vendor development related

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical of ZBC and Manufacturing process.

I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions were related to the post John Deere were offering to candidates. For me it was Diagnostics Author position.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be aware that answer as simple as you can.
If you don't know the answer don't try to attempt simply say that you don't know and assure interviewer that if you ll get a chance you will definitely answer that.

Be optimistic and attentive.

I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They just asked basics que. related to job profile.. seeking confidence..

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.... should have basic knowledge of process. and knowledege of work and items.. and their costing and commercial terms.

I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions on Process,Simulation, CAD

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

I applied via Recruitment Consultant and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. CNC programming

Interview Preparation Tips

Interview preparation tips for other job seekers - Be very technical

Hitek Engineering Services Interview FAQs

How many rounds are there in Hitek Engineering Services Project Engineer interview?
Hitek Engineering Services interview process usually has 2-3 rounds. The most common rounds in the Hitek Engineering Services interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Hitek Engineering Services Project Engineer interview?

Some of the top questions asked at the Hitek Engineering Services Project Engineer interview -

  1. How to do hydrotest and at what pressu...read more
  2. How to select welding consumab...read more
  3. Mvws vs hvws spray system in fire fight...read more

Tell us how to improve this page.

Hitek Engineering Services Project Engineer Interview Process

based on 3 interviews

Interview experience

2
  
Poor
View more
Hitek Engineering Services Project Engineer Salary
based on 17 salaries
₹1.8 L/yr - ₹6 L/yr
11% less than the average Project Engineer Salary in India
View more details

Hitek Engineering Services Project Engineer Reviews and Ratings

based on 3 reviews

1.2/5

Rating in categories

1.7

Skill development

1.7

Work-life balance

1.0

Salary

1.7

Job security

1.0

Company culture

1.0

Promotions

1.2

Work satisfaction

Explore 3 Reviews and Ratings
Project Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Account Assistant
9 salaries
unlock blur

₹1.1 L/yr - ₹4.6 L/yr

Electrical Engineer
8 salaries
unlock blur

₹1.2 L/yr - ₹3.6 L/yr

Project Manager
7 salaries
unlock blur

₹5.7 L/yr - ₹13.6 L/yr

Site Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Hitek Engineering Services with

John Deere

4.1
Compare

Thermax Limited

4.1
Compare

Cummins

4.3
Compare

ABB

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview