Upload Button Icon Add office photos

Filter interviews by

Hitek Engineering Services Electrical Engineer Interview Questions and Answers

Updated 19 Feb 2023

Hitek Engineering Services Electrical Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of electrical engineering questions, earthing types
  • Q2. Type of earthing types function of induction motor
  • Ans. 

    Earthing types include TT, TN-S, TN-C-S, and IT. Induction motors convert electrical energy into mechanical energy.

    • Earthing types are used to provide a safe path for electrical current to flow to the ground.

    • TT earthing involves a separate earth electrode for each electrical system.

    • TN-S earthing uses a combined neutral and protective earth conductor.

    • TN-C-S earthing combines the neutral and protective earth conductors up...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - make your basics very clear,
about contactor,mcb,vfd etc

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. A 22 kw AOP motor CT cable burn again and again what is the reason ?
  • Ans. 

    The repeated burning of a 22 kW AOP motor CT cable may be due to overloading, short circuits, poor insulation, or incorrect cable sizing.

    • Check for overloading of the motor causing excessive heat in the cable

    • Inspect for short circuits in the motor or the wiring

    • Ensure proper insulation of the cable to prevent overheating

    • Verify if the cable size is appropriate for the motor's power requirements

  • Answered by AI
  • Q2. When CT of AOP motor is bypassed then what effect on the motor ?
  • Ans. 

    Bypassing the CT of an AOP motor can lead to overcurrent and damage to the motor.

    • Bypassing the CT can result in the motor drawing excessive current.

    • This can lead to overheating of the motor windings.

    • Overcurrent can cause damage to the motor components.

    • It can also pose a safety risk due to potential electrical faults.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is motor in electrical
  • Ans. 

    A motor in electrical engineering is a device that converts electrical energy into mechanical energy.

    • Motors are commonly used in various applications such as industrial machinery, household appliances, and electric vehicles.

    • There are different types of motors including DC motors, AC motors, and stepper motors.

    • Motors consist of a rotor and a stator, with the rotor rotating when electrical current is applied.

    • The speed an...

  • Answered by AI
  • Q2. Introduce yourself by technically
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What is VFD work
  • Ans. 

    VFD stands for Variable Frequency Drive, which is a type of motor controller that drives an electric motor by varying the frequency and voltage supplied to the motor.

    • VFDs are used to control the speed and torque of AC motors in various applications.

    • They are commonly used in HVAC systems, industrial pumps, conveyor systems, and machine tools.

    • VFDs can help save energy by adjusting motor speed to match the actual load req...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. My Communicate, my rafomnace,my character etc related Qution
  • Q2. My education qutlifacation and my interview

Interview Preparation Tips

Interview preparation tips for other job seekers - CT PT teasing exprince in ashamor electrical private Limited, kalol, Gathinagar

I applied via Referral and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. What's your name and qualifications
  • Q2. What is your qualifications and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - I was not interested vdd
Jff
Uuhg hdgh hhjj ygc

I applied via Company Website and was interviewed in Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - I always go to work in kirloskar brother group.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the synchronisation process of plant ?
  • Ans. 

    Synchronisation process of a plant involves matching the frequency, voltage, and phase angle of the incoming generator with the grid.

    • Ensure the generator frequency matches the grid frequency (50Hz or 60Hz).

    • Match the voltage levels of the generator with the grid.

    • Adjust the phase angle of the generator to synchronize with the grid.

    • Use synchronizing equipment like synchroscope or synchronizing lamps to ensure proper synch...

  • Answered by AI
  • Q2. Brief discussion about alternator and transformer protection system ?
  • Ans. 

    Alternator and transformer protection systems are essential for preventing damage and ensuring safe operation.

    • Alternator protection systems typically include overcurrent, overvoltage, and reverse power protection to safeguard the alternator from damage.

    • Transformer protection systems often involve differential protection, overcurrent protection, and temperature monitoring to prevent overheating and insulation breakdown.

    • ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Logical Reasoning, English Quant, Aptitude

Round 2 - Technical 

(2 Questions)

  • Q1. Question on Technical Knowledge
  • Q2. Ask About Your Experience and Background

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on Technical Knowledge
Focus on Personality and Behaviour

Hitek Engineering Services Interview FAQs

How many rounds are there in Hitek Engineering Services Electrical Engineer interview?
Hitek Engineering Services interview process usually has 2 rounds. The most common rounds in the Hitek Engineering Services interview process are Resume Shortlist and Technical.
What are the top questions asked in Hitek Engineering Services Electrical Engineer interview?

Some of the top questions asked at the Hitek Engineering Services Electrical Engineer interview -

  1. type of earthing types function of induction mo...read more
  2. basics of electrical engineering questions, earthing ty...read more

Tell us how to improve this page.

Hitek Engineering Services Electrical Engineer Salary
based on 8 salaries
₹1.2 L/yr - ₹3.6 L/yr
44% less than the average Electrical Engineer Salary in India
View more details

Hitek Engineering Services Electrical Engineer Reviews and Ratings

based on 4 reviews

2.9/5

Rating in categories

3.1

Skill development

1.9

Work-life balance

1.4

Salary

1.2

Job security

2.5

Company culture

1.8

Promotions

1.8

Work satisfaction

Explore 4 Reviews and Ratings
Project Engineer
16 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Site Engineer
10 salaries
unlock blur

₹2.1 L/yr - ₹5.4 L/yr

Account Assistant
9 salaries
unlock blur

₹1.1 L/yr - ₹3.6 L/yr

Electrical Engineer
8 salaries
unlock blur

₹1.2 L/yr - ₹3.6 L/yr

Quality Engineer
7 salaries
unlock blur

₹2 L/yr - ₹3.4 L/yr

Explore more salaries
Compare Hitek Engineering Services with

John Deere

4.1
Compare

Thermax Limited

4.2
Compare

Cummins

4.3
Compare

Tractors and Farm Equipment

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview