Filter interviews by
I applied via Naukri.com and was interviewed before Feb 2021. There were 4 interview rounds.
Civil site related work objective test
Top trending discussions
posted on 19 Jul 2022
I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Feb 2022. There were 2 interview rounds.
I am manikandan diploma civil in 5 years experience sir
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 1 Oct 2021
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
Welding quality is the measure of how well a weld meets the required standards and specifications.
Welding quality is determined by factors such as weld strength, appearance, and adherence to welding procedures.
It is important to ensure that the weld is free from defects such as cracks, porosity, and incomplete fusion.
Quality control measures, such as non-destructive testing, are used to assess the integrity of the weld...
posted on 19 Mar 2022
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Bricks are wet during brick work to prevent them from absorbing water from the mortar too quickly.
Wet bricks prevent the mortar from drying out too quickly, which can weaken the bond between the bricks and the mortar.
Wet bricks also help to prevent efflorescence, a white powdery substance that can form on the surface of bricks due to the migration of salts.
Bricks should be dampened, not soaked, before use.
The amount of...
The thickness of cement mortar in brickwork varies depending on the type of brick and the purpose of the wall.
For load-bearing walls, the thickness of the mortar should be 10mm for horizontal joints and 8mm for vertical joints.
For non-load-bearing walls, the thickness of the mortar can be reduced to 6mm for horizontal joints and 4mm for vertical joints.
The type of brick used can also affect the thickness of the mortar....
Chemical names of water proofing
Acrylic polymers
Bituminous coatings
Silicones
Polyurethane
Epoxy resins
Ceramic or porcelain tiles are commonly used in toilets due to their durability and water resistance.
Ceramic or porcelain tiles are commonly used in toilets
These tiles are durable and water-resistant
Other options include natural stone tiles and vinyl tiles
I expect a competitive salary based on my qualifications and experience.
Research the average salary range for Site Engineers in your area
Consider your level of experience and expertise
Factor in any additional certifications or specialized skills you possess
Be prepared to negotiate and discuss benefits package
Example: Based on my research, the average salary range for Site Engineers in this area is $60,000 to $80,000. C...
I worked as a Site Engineer at XYZ Construction Company.
Managed and supervised construction projects on-site.
Ensured compliance with building codes and regulations.
Collaborated with architects, contractors, and subcontractors.
Monitored project progress and resolved any issues that arose.
Prepared and maintained project documentation, including reports and drawings.
posted on 18 Jun 2023
I applied via Walk-in and was interviewed before Jun 2022. There were 3 interview rounds.
Round was quite easy, for mechanical they had turbo machinery and heat transfer questions and basic SOM,TOM,MD,MF
Lifts work on the principle of pulleys and counterweights while ACs work on the principle of refrigeration.
Lifts use a motor to move a counterweight that balances the weight of the lift car and its occupants.
ACs use a compressor to compress and expand refrigerant gas to absorb and release heat.
Types of ACs include window ACs, split ACs, central ACs, and portable ACs.
Window ACs are mounted on windows and cool a single r...
I appeared for an interview before Mar 2024, where I was asked the following questions.
As a Site Engineer, I managed construction activities, ensured quality control, and coordinated with various stakeholders on-site.
Oversaw daily construction operations, ensuring adherence to project timelines and safety regulations.
Conducted regular site inspections to monitor progress and quality, addressing any issues promptly.
Collaborated with architects and contractors to interpret blueprints and implement design s...
Cube casting samples involves specific procedures to ensure accurate testing of concrete strength as per IS codes.
Prepare the concrete mix as per design specifications.
Use clean, non-absorbent molds for casting cubes, typically 150mm x 150mm x 150mm.
Fill the molds in layers, compacting each layer to eliminate air pockets.
Level the surface of the concrete and cover the molds with a damp cloth or plastic to prevent moist...
based on 2 reviews
Rating in categories
Relationship Manager
15
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Site Engineer
12
salaries
| ₹4 L/yr - ₹7.4 L/yr |
Relationship Executive
12
salaries
| ₹3.4 L/yr - ₹5.5 L/yr |
Area Business Manager
10
salaries
| ₹6 L/yr - ₹11 L/yr |
Management Trainee
7
salaries
| ₹3.5 L/yr - ₹4 L/yr |
JLL
CBRE
NoBroker
Lodha Group