Upload Button Icon Add office photos

Filter interviews by

Hindustan Construction Company Senior Finishing Engineer Interview Questions and Answers

Updated 21 Feb 2024

Hindustan Construction Company Senior Finishing Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is thikness of floor tile.
  • Ans. 

    The thickness of floor tiles can vary depending on the type and material used.

    • Floor tiles can range in thickness from 1/4 inch to 3/4 inch.

    • Common thickness for ceramic tiles is around 1/4 inch.

    • Porcelain tiles are typically thicker, around 3/8 inch to 1/2 inch.

    • Natural stone tiles can vary in thickness depending on the type of stone.

    • Thin tiles, known as slim tiles, can be as thin as 3mm.

    • Thicker tiles are more durable and

  • Answered by AI
  • Q2. Types of tiles.
  • Ans. 

    Types of tiles include ceramic, porcelain, glass, mosaic, and natural stone.

    • Ceramic tiles are made from clay and other natural materials, and are popular for their durability and versatility.

    • Porcelain tiles are also made from clay but are denser and less porous than ceramic tiles, making them more water-resistant.

    • Glass tiles are known for their unique appearance and ability to reflect light, making them popular for bac...

  • Answered by AI
  • Q3. Bar bending schedule

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Finishing work related discussion

Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Brick work joint filling which thickness
  • Ans. 

    The thickness of brick work joint filling typically ranges from 10mm to 20mm.

    • Brick work joint filling thickness is usually around 10mm to 20mm.

    • The thickness may vary based on the type of bricks used and the specific requirements of the project.

    • It is important to follow the specifications provided in the construction plans for the joint filling thickness.

    • Properly filled joints help in ensuring the structural integrity a

  • Answered by AI
  • Q2. Plaster internal wall thickness
  • Ans. Plaster internal wall thickness is 12mm
  • Answered Anonymously
  • Q3. External wall plaster thickness how
  • Ans. 

    The external wall plaster thickness is typically determined by the type of finish desired and the structural requirements of the building.

    • External wall plaster thickness can vary depending on the type of finish, such as smooth, textured, or decorative.

    • The thickness may also be influenced by the structural requirements of the building, such as insulation or soundproofing needs.

    • Common external wall plaster thickness rang...

  • Answered by AI
  • Q4. Rcc surface Plaster thickness how
  • Ans. 

    The thickness of RCC surface plaster is determined based on the structural requirements and design specifications.

    • RCC surface plaster thickness is typically specified in the construction drawings or project specifications.

    • The thickness of RCC surface plaster can vary depending on the type of finish desired, such as smooth or textured.

    • It is important to ensure that the RCC surface plaster is applied evenly and at the co...

  • Answered by AI
  • Q5. Wall plaster mortar ratio how
  • Ans. 

    The wall plaster mortar ratio is typically 1:3 or 1:4, meaning one part cement to three or four parts sand.

    • Common ratios include 1:3 and 1:4, with one part cement to three or four parts sand respectively

    • The ratio may vary depending on the specific requirements of the project

    • Proper mixing and consistency are crucial for a strong and durable finish

  • Answered by AI
  • Q6. Hardonite Flooring how thickness & method
  • Ans. 

    Hardonite flooring is a type of flooring known for its durability and strength. The thickness and method of installation depend on the specific requirements of the project.

    • Hardonite flooring is typically installed at a thickness of 1/4 inch to 1/2 inch, depending on the level of durability required.

    • The method of installation involves preparing the subfloor, applying a bonding agent, pouring the Hardonite mixture, and t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Quality work & work programing day by day & progress work & Hause Keeping time to time & curing must

I applied via Walk-in

Round 1 - HR 

(1 Question)

  • Q1. Building finishing work

Interview Preparation Tips

Interview preparation tips for other job seekers - Block work plaster tiles granite gypsum putty painting

Hindustan Construction Company Interview FAQs

How many rounds are there in Hindustan Construction Company Senior Finishing Engineer interview?
Hindustan Construction Company interview process usually has 1 rounds. The most common rounds in the Hindustan Construction Company interview process are Technical.
What are the top questions asked in Hindustan Construction Company Senior Finishing Engineer interview?

Some of the top questions asked at the Hindustan Construction Company Senior Finishing Engineer interview -

  1. What is thikness of floor ti...read more
  2. Types of til...read more
  3. Bar bending sched...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Hindustan Construction Company interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 690 Interviews
Tata Projects Interview Questions
4.3
 • 398 Interviews
AtkinsRealis Interview Questions
4.0
 • 83 Interviews
GMR Group Interview Questions
4.1
 • 73 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 64 Interviews
View all
Site Engineer
222 salaries
unlock blur

₹2.1 L/yr - ₹7.2 L/yr

Civil Site Engineer
184 salaries
unlock blur

₹2.2 L/yr - ₹7.9 L/yr

Senior Planning Engineer
57 salaries
unlock blur

₹5 L/yr - ₹8.5 L/yr

Quantity Surveyor
56 salaries
unlock blur

₹3.5 L/yr - ₹7.2 L/yr

Manager
47 salaries
unlock blur

₹9.7 L/yr - ₹19.5 L/yr

Explore more salaries
Compare Hindustan Construction Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview