Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
How to improve operation smoothly
To increase VRM efficiency, focus on optimizing power delivery, reducing losses, improving cooling, and using high-quality components.
Optimize power delivery by reducing resistance in the circuit
Reduce losses by using high-efficiency components and minimizing switching losses
Improve cooling to prevent overheating and maintain stable operation
Use high-quality components to ensure reliability and efficiency
Consider imple...
Rate your
company
🤫 100% anonymous
How was your last interview experience?
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
I have experience in fuel system layout, solving top complaints, and understanding how sensors work.
Fuel system layout involves designing and arranging components such as fuel tanks, pumps, filters, and injectors.
I have successfully resolved customer complaints related to fuel efficiency, engine performance, and fuel leaks.
Sensors work by detecting changes in physical or chemical properties and converting them into ele...
I applied via Naukri.com and was interviewed before Dec 2019. There were 5 interview rounds.
Implementing lean manufacturing principles, optimizing machine utilization, and investing in automation can improve productivity in machine shops.
Implementing lean manufacturing principles such as 5S, Kaizen, and Kanban can help reduce waste and improve efficiency.
Optimizing machine utilization by scheduling preventive maintenance, reducing setup times, and improving workflow can increase productivity.
Investing in auto...
ABC costing is a method of assigning costs to products based on their consumption of resources. Industrial engineers play a key role in implementing and optimizing ABC costing systems.
ABC costing stands for Activity-Based Costing
It is a method of assigning costs to products based on the resources they consume
Industrial engineers play a key role in implementing and optimizing ABC costing systems
They help identify the ac...
VA/VE stands for Value Analysis/Value Engineering. It is a systematic approach to improve the value of a product or service.
VA/VE aims to reduce costs while maintaining or improving the quality of the product or service.
It involves analyzing the functions of a product or service and identifying areas where costs can be reduced without compromising quality.
Examples of VA/VE projects include redesigning a product to use ...
I applied via LinkedIn and was interviewed before Feb 2020. There was 1 interview round.
I applied via Shine and was interviewed before Dec 2020. There was 1 interview round.
I was interviewed in Jun 2021.
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
Mercer Mettle Test for initial screening.
posted on 15 Aug 2023
I was interviewed before Aug 2022.
Extraction of aluminum involves the process of electrolysis of alumina.
Aluminum is extracted from its ore, bauxite, through the Bayer process.
The extracted alumina is then converted into aluminum through the Hall-Héroult process.
Electrolysis is used to separate the aluminum from the oxygen in alumina.
The process requires a large amount of electricity and is energy-intensive.
Alumina is extracted from bauxite through a process called the Bayer process.
Alumina is the primary component of aluminum production.
The Bayer process involves crushing the bauxite ore, mixing it with sodium hydroxide, and heating it in a pressure vessel.
The resulting solution is filtered to remove impurities, leaving behind alumina which is then processed into aluminum.
Alumina is used in a variety of industries includ
based on 1 interview
Interview experience
Anonymously discuss salaries, work culture, and many more
Get Ambitionbox App
Assistant Manager
216
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
31
salaries
| ₹0 L/yr - ₹0 L/yr |
ACC
Ambuja Cements
UltraTech Cement
Grasim Industries