  • Q1. About yourself? About previous project? About work?
  • Q2. About Tunnel Engineering
  • Q3. About Aggregate and cement test?
  • Q4. About shotcrete, Rock bolt?
  • Q5. NATM
  • Q6. Concrete technology, BBS, Site management?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive all is well!

Interview questions from similar companies

I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Work details for my privious company and what will work going on. Finally salary discuss

Interview Preparation Tips

Interview preparation tips for other job seekers - For civil engineering questions
How much brick using for 1m3?
How to steel weight calculate?
How to concrete quantity calculate?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. : What are some of the biggest challenges civil engineers face?
  • Ans. 

    Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.

    • Managing project budgets effectively to avoid cost overruns

    • Dealing with unexpected site conditions such as soil instability or environmental hazards

    • Ensuring compliance with regulations and obtaining necessary permits

    • Balancing the needs of various stakeho...

  • Answered by AI
  • Q2. What is your favorite role on a project team? How do you react to a task you're not sure how to approach?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about your self
  • Q2. Tell me about your strength

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in your self
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Execution of piling, standards concrete and RCC structure related questions
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com

Round 1 - HR 

(2 Questions)

  • Q1. Foundation footing how much cover required
  • Ans. 

    Foundation footing requires a minimum cover of 50mm to 75mm for reinforcement protection.

    • Minimum cover of 50mm to 75mm is required for foundation footing to protect the reinforcement from corrosion and provide adequate strength.

    • The cover requirement may vary based on the type of soil, environmental conditions, and structural design.

    • Proper cover ensures durability and stability of the foundation.

    • In some cases, additiona...

  • Answered by AI
  • Q2. Shuttering column up to FFL how much cover required
  • Ans. 

    The cover required for shuttering column up to FFL depends on the type of concrete being used and the environmental conditions.

    • Cover required for shuttering column up to FFL typically ranges from 25mm to 50mm.

    • Factors such as type of concrete mix, exposure conditions, and structural requirements can influence the required cover.

    • For example, in harsh environmental conditions or high-strength concrete, a higher cover may ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - N/A
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Slop of stairs case
  • Ans. 

    The slope of stairs refers to the angle at which the stairs are inclined, affecting safety and accessibility.

    • The slope of stairs is typically between 30-35 degrees for comfortable and safe use.

    • Building codes may dictate specific slope requirements for stairs to ensure safety and accessibility.

    • The slope of stairs can be calculated using trigonometry, with the rise and run of the stairs determining the angle.

    • A steep slop...

  • Answered by AI
  • Q2. Why covering provided in steel reinforcement?
  • Ans. 

    Covering is provided in steel reinforcement to protect it from corrosion and to ensure proper bond with concrete.

    • Covering protects steel reinforcement from corrosion caused by exposure to moisture and chemicals in the environment.

    • It helps in maintaining the bond between steel reinforcement and concrete, ensuring structural integrity.

    • Proper covering thickness is important to prevent rusting of steel bars and maintain du...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the leaping zone of steel rainforcement ?
  • Ans. 

    The leaping zone of steel reinforcement refers to the area where the steel bars are not provided in a concrete member.

    • The leaping zone is typically found in beams and slabs where the steel reinforcement is not required to be continuous.

    • It is important to ensure that the leaping zone does not compromise the structural integrity of the member.

    • Proper detailing and design considerations are necessary to determine the exten...

  • Answered by AI
  • Q2. How can identify the site uses materials?
  • Ans. 

    Site uses materials can be identified through visual inspection, testing, and documentation.

    • Conduct visual inspection of materials on site to identify their type and quality

    • Perform tests on materials such as soil, concrete, and asphalt to determine their properties

    • Review documentation such as material specifications, delivery receipts, and quality control reports

    • Consult with suppliers and manufacturers to verify the au

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Draw the section of stairs case with reinforcement.
  • Ans. 

    A section of stairs case with reinforcement is a structural drawing showing the details of the stairs and the reinforcement bars used for strength.

    • Include dimensions and materials used for the stairs and reinforcement bars

    • Show the arrangement of reinforcement bars in the section view

    • Label the different components of the stairs case for clarity

  • Answered by AI
  • Q2. What is the component of maivan technology
  • Ans. 

    Maivan technology consists of various components including sensors, software, and data analytics for monitoring and managing civil infrastructure.

    • Sensors are used to collect data on various parameters such as temperature, humidity, and structural integrity.

    • Software is utilized to process the data collected by sensors and provide real-time monitoring and analysis.

    • Data analytics tools are employed to identify patterns, t...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About last company works
  • Q2. About steel and concrete
  • Q3. Handling labours and supervisors
Round 3 - HR 

(2 Questions)

  • Q1. About last paid salary
  • Q2. 1)Marital status 2) accomodation
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical side question
  • Q2. Civil engineering jobs in
Round 3 - Technical 

(2 Questions)

  • Q1. Civil structure
  • Q2. Civil engineering construction

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Civil Site Engineer interview:
  • Civil Construction
  • Steel Structures
  • Sarvey
  • Building Construction
Interview preparation tips for other job seekers - Please company in job

HCC Infrastructure Interview FAQs

What are the top questions asked in HCC Infrastructure Senior Site Engineer interview?

Some of the top questions asked at the HCC Infrastructure Senior Site Engineer interview -

  1. Concrete technology, BBS, Site manageme...read more
  2. About Aggregate and cement te...read more
  3. About shotcrete, Rock bo...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 722 Interviews
Tata Projects Interview Questions
4.2
 • 414 Interviews
Adani Group Interview Questions
3.9
 • 178 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
View all
Civil Site Engineer
16 salaries
unlock blur

₹2.9 L/yr - ₹5.8 L/yr

Civil Engineer
13 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Site Engineer
7 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Senior Engineer
6 salaries
unlock blur

₹6.8 L/yr - ₹11.4 L/yr

Senior Legal Officer
6 salaries
unlock blur

₹9 L/yr - ₹18 L/yr

Explore more salaries
Compare HCC Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview