The basic planning of erection involves determining the scope, timeline, resources, and sequence of activities required for the construction process.
Define the scope of the project, including the specific tasks and deliverables
Create a detailed timeline, identifying key milestones and deadlines
Allocate resources such as manpower, equipment, and materials
Establish the sequence of activities, considering dependencies and...
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 3 reviews
Rating in categories
Project Engineer
4
salaries
| ₹12.2 L/yr - ₹12.2 L/yr |
TCS
Accenture
Wipro
Cognizant