Filter interviews by
Construction line impressive work
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
I applied via Referral and was interviewed in Nov 2023. There were 3 interview rounds.
My highest qualification is a Master's degree in Electrical Engineering.
Master's degree in Electrical Engineering
Specialized in power systems
Thesis focused on renewable energy integration
Completed advanced courses in control systems
Published research papers in IEEE conferences
As a Senior Engineer, my role in project quality is to ensure that all deliverables meet the required standards and specifications.
Developing and implementing quality assurance processes and procedures
Conducting regular audits and inspections to identify any quality issues
Collaborating with cross-functional teams to address and resolve quality concerns
Creating and maintaining quality documentation, including test plans...
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
I am a Senior Engineer with 10+ years of experience in software development, specializing in backend systems and database management.
10+ years of experience in software development
Specialize in backend systems and database management
Strong problem-solving skills
Experience with various programming languages such as Java, Python, and SQL
Cutting length in R/f bar is the length of reinforcement required for bending and overlapping in a reinforced concrete structure.
Cutting length is calculated based on the shape and size of the structure where the reinforcement bars will be placed.
It includes the length required for bending the bars at corners and overlaps at joints.
Cutting length helps in determining the quantity of reinforcement bars needed for a spec...
Slump test is used to measure the workability of concrete mix.
Determines the consistency and fluidity of concrete mix
Helps in ensuring the concrete is of the desired quality
Results can indicate if adjustments need to be made to the mix proportions
Commonly used in construction projects to assess the quality of concrete
posted on 19 Oct 2023
based on 1 interview
Interview experience
Software Developer
15
salaries
| ₹5 L/yr - ₹10.5 L/yr |
Piping Designer
11
salaries
| ₹6 L/yr - ₹8 L/yr |
Senior Software Engineer
9
salaries
| ₹14 L/yr - ₹23 L/yr |
Electrical Designer
7
salaries
| ₹6.5 L/yr - ₹8.2 L/yr |
Piping Design Engineer
6
salaries
| ₹6.6 L/yr - ₹16.5 L/yr |
Swiggy
Zomato
BigBasket
Blinkit