BBU stands for Baseband Unit, a key component in a mobile network responsible for processing and managing the radio signals.
BBU is responsible for processing and managing the radio signals in a mobile network.
It is a key component in the network infrastructure, working closely with the Remote Radio Unit (RRU).
BBU is typically located at the base station and plays a crucial role in ensuring smooth communication between ...
LSTK project stands for Lump Sum Turnkey project.
LSTK project is a type of project where the contractor is responsible for completing the project within a specified budget and timeline.
The contractor takes on the risk of any cost overruns or delays in completion.
Examples of LSTK projects include construction of a new building, installation of a manufacturing plant, or development of a new infrastructure project.
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the minimum time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often depicted in a Gantt chart.
By focusing on the criti...
EPC stands for Engineering, Procurement, and Construction in project management.
EPC is a common type of contract used in the construction industry where the contractor is responsible for all aspects of the project from design to completion.
The contractor is responsible for engineering the project, procuring the necessary materials and equipment, and constructing the project according to the agreed specifications.
EPC co...
Top trending discussions
posted on 8 Jan 2015
posted on 6 Feb 2015
The Bending Moment graph represents the variation of bending moment along the length of a beam.
The graph shows the bending moment at different points along the beam.
The x-axis represents the distance along the beam, while the y-axis represents the bending moment.
The graph can be used to determine the maximum bending moment and its location.
The shape of the graph depends on the type of load applied to the beam.
For examp...
posted on 17 Jan 2021
I applied via Naukri.com and was interviewed before Jan 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
posted on 4 May 2019
I applied via Approached by Company and was interviewed in Sep 2018. There was 0 interview round.
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Apr 2024. There were 5 interview rounds.
One for personality and another for Technical
based on 1 interview
Interview experience
Project Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Instrument Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Energy Hydrocarbon
Bharati Defence and Infrastructure
Dolphin Offshore Enterprises (I)
ABG Shipyard