I applied via Referral and was interviewed before Apr 2020. There was 1 interview round.
Power factor improvement involves reducing reactive power and increasing active power to improve efficiency.
Power factor is the ratio of active power to apparent power
Improving power factor reduces energy costs and improves system efficiency
Methods for improving power factor include capacitor banks, synchronous motors, and static VAR compensators
3-phase induction motor slip ring and squirrel cage motor differ in rotor construction and starting torque.
Slip ring motor has external resistors and brushes to control rotor current and torque, while squirrel cage motor has a simple rotor with copper bars.
Slip ring motor has high starting torque and is used in heavy load applications like cranes and elevators, while squirrel cage motor has low starting torque and is u...
Slip ring motors use external resistors for starting and speed control, while squirrel cage motors rely on the number of poles and frequency for speed control.
Slip ring motors have external resistors that are gradually removed to increase speed
Squirrel cage motors rely on the number of poles and frequency for speed control
Slip ring motors are used in applications where high starting torque is required
Squirrel cage moto...
Top trending discussions
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
posted on 18 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 18 Oct 2021
I applied via Company Website and was interviewed in Apr 2021. There were 4 interview rounds.
posted on 7 Aug 2023
The question is asking about the work and testing of a transformer, inverter, PV array, and MMS in an electrical engineering context.
Transfomer: Explain the function of a transformer in electrical systems, mention testing methods like turns ratio test and insulation resistance test.
Inverter: Describe how an inverter converts DC power to AC power, discuss testing procedures such as efficiency testing and harmonic distor...
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
posted on 15 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
posted on 18 Mar 2025
I appeared for an interview in Sep 2024, where I was asked the following questions.
I appeared for an interview in Feb 2025, where I was asked the following questions.
Some of the top questions asked at the Gupta Power Infrastructure Electrical Engineer interview for experienced candidates -
based on 7 reviews
Rating in categories
Electrical Site Engineer
61
salaries
| ₹1.6 L/yr - ₹4.1 L/yr |
Site Engineer
47
salaries
| ₹1.5 L/yr - ₹3.8 L/yr |
Project Manager
37
salaries
| ₹4.4 L/yr - ₹9.5 L/yr |
Assistant Project Manager
36
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Assistant Manager
33
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Vestas
ReNew
Siemens Gamesa Renewable Power Private Limited
Adani Green Energy