Filter interviews by
I applied via Referral and was interviewed before Jan 2022. There were 4 interview rounds.
Oil and gas construction activities involve civil, piping, and equipment work.
Civil work includes building foundations, roads, and drainage systems.
Piping work involves installing pipelines for oil and gas transportation.
Equipment work includes installing and commissioning various types of equipment such as pumps, compressors, and turbines.
Other activities include electrical and instrumentation work, testing and commis...
Piping iso drawings are detailed engineering drawings that show the layout of piping systems in a plant or facility.
Piping iso drawings provide a detailed view of the piping system, including the size and type of pipes, valves, fittings, and other components.
They are used by engineers and designers to plan and design piping systems, and by construction and maintenance teams to install and maintain the system.
The drawin...
Top trending discussions
posted on 20 Jan 2025
I applied via Campus Placement
The test was based on logical reasoning and verbal reasoning.
EVM stands for Earned Value Management. It is a project management technique used to measure project performance and progress.
EVM integrates scope, schedule, and cost to provide a comprehensive view of project performance.
It compares the planned value (PV), earned value (EV), and actual cost (AC) to assess project health.
PV represents the budgeted cost of the work scheduled, EV represents the budgeted cost of the work ...
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
posted on 30 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They consist of two coils of wire, known as the primary and secondary windings
The primary winding is connected to the input voltage source, while the secondary winding is connected to the output load
The transformer changes th...
A resistor is an electronic component that resists the flow of electrical current.
Resistors are used to control the amount of current flowing in a circuit.
The resistance of a resistor is measured in ohms (Ω).
One way to measure a resistor without a multimeter is by using a simple circuit with a known voltage source and an ammeter to measure the current flowing through the resistor.
Another method is to use a resistor col...
posted on 29 Jun 2023
I applied via Referral and was interviewed in May 2023. There were 2 interview rounds.
Suitability for location depends on various factors such as accessibility, infrastructure, regulations, and environmental impact.
Consider proximity to transportation hubs for easy access
Check if the location meets zoning and building regulations
Assess the availability of utilities such as water, electricity, and internet
Evaluate the environmental impact of the location on the project
Ensure the location is safe and secu
posted on 25 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
20 question of Apti and 30 questions of Technical, timing 1 hr
posted on 13 Oct 2023
I applied via campus placement at National Institute of Technology (NIT), Jamshedpur and was interviewed in Sep 2023. There were 4 interview rounds.
The level of the exam was normal.
Quality of brick, cement, and SF & BMD diagram can be checked through visual inspection, testing, and comparison with standards.
Brick quality can be checked by inspecting for uniform size, shape, and color, and conducting water absorption test.
Cement quality can be checked by performing tests like fineness test, setting time test, and compressive strength test.
SF & BMD diagram quality can be checked by verifying accura...
posted on 28 Sep 2022
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
HSE Officer
16
salaries
| ₹5 L/yr - ₹12.1 L/yr |
Safety Officer
12
salaries
| ₹9.6 L/yr - ₹12.3 L/yr |
Quantity Surveyor
8
salaries
| ₹4.8 L/yr - ₹16 L/yr |
Planning Engineer
8
salaries
| ₹6.8 L/yr - ₹18 L/yr |
Piping Supervisor
6
salaries
| ₹8 L/yr - ₹20 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Tata Projects
Hindustan Construction Company