Filter interviews by
Clear (1)
I applied via LinkedIn and was interviewed in Nov 2021. There was 1 interview round.
Top trending discussions
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 18 Nov 2020
Android architecture stack is a set of layers that make up the Android operating system.
The stack includes four main layers: Linux kernel, native libraries, Android runtime, and application framework.
The Linux kernel provides low-level system functionality.
Native libraries are written in C or C++ and provide access to hardware-specific features.
The Android runtime includes the Dalvik virtual machine and core libraries.
...
AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.
AIDL is used to define the interface between client and service in Android.
It allows communication between different processes in Android.
AIDL is used to pass complex data types between processes.
AIDL is similar to Remote Procedure Call (RPC) in other programming languages.
Example: AIDL is used in Android to implement...
Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.
Hash set stores unique values without any specific order.
Hash map stores key-value pairs and allows fast retrieval of values based on keys.
Both use hashing to map keys to their corresponding values.
In Java, HashSet and HashMap are implementations of these data structures.
posted on 12 May 2018
posted on 4 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
posted on 30 Nov 2023
I was interviewed before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
posted on 8 Apr 2024
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
based on 1 review
Rating in categories
HSE Officer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Quantity Surveyor
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Supervisor
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Tata Projects
Hindustan Construction Company