Common bricks typically measure 3 5/8 inches by 2 1/4 inches by 8 inches.
Common bricks are typically 3 5/8 inches by 2 1/4 inches by 8 inches in size.
The size of common bricks can vary slightly depending on the manufacturer.
Common bricks are often used in construction for walls, pavements, and other structures.
Types of footings include spread footings, mat foundations, pile foundations, and drilled caissons.
Spread footings are used to distribute the load of a structure over a larger area.
Mat foundations are large, thick slabs used to support heavy structures.
Pile foundations are deep foundations that transfer loads to deeper, more stable soil or rock.
Drilled caissons are deep, narrow foundation elements drilled into the grou
Top trending discussions
posted on 7 Aug 2024
I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.
Good learning and Teaching and growing
Good base knowledge and experience
Good base background and growth and knowledgeable
posted on 26 Mar 2024
I applied via Approached by Company and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 3 Nov 2023
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 2 interview rounds.
Selection of a cable involves considering factors like voltage rating, current carrying capacity, insulation material, and environmental conditions.
Determine the voltage rating required for the application.
Calculate the current carrying capacity needed based on the load.
Select the appropriate size and type of cable based on the current rating.
Consider the insulation material suitable for the environment (e.g. PVC, XLPE...
Load factor is the ratio of the average load to the maximum load that a system can handle.
Load factor is calculated by dividing the average load by the maximum load capacity.
It is used to measure the efficiency of a system or equipment in handling varying loads.
For example, a power plant with a load factor of 0.8 means it is operating at 80% of its maximum capacity.
The tertiary winding in a power transformer is important for providing a path for zero-sequence currents and reducing harmonics.
Provides a path for zero-sequence currents, which helps in balancing the three-phase system
Reduces harmonics in the system, improving power quality
Helps in limiting fault currents and improving the overall efficiency of the transformer
To check if a lightning arrestor is working fine, you can perform visual inspections, check for physical damage, test for continuity, and monitor surge protection levels.
Perform visual inspections for any signs of physical damage or wear
Check for loose connections or corrosion on the lightning arrestor
Test for continuity using a multimeter to ensure proper electrical connection
Monitor surge protection levels to ensure ...
posted on 19 Feb 2024
posted on 16 May 2023
I was interviewed before May 2022.
posted on 26 Apr 2022
I applied via Company Website and was interviewed in Oct 2021. There were 2 interview rounds.
Steel measurement can be taken using various methods depending on the type of steel and the purpose of measurement.
Use a micrometer or caliper to measure the thickness of steel plates or sheets.
Use a tape measure or ruler to measure the length and width of steel bars or pipes.
Use ultrasonic testing to measure the thickness of steel pipes or tanks.
Use X-ray fluorescence (XRF) to measure the chemical composition of steel...
Cost can be calculated by considering all the expenses incurred in the production process.
Identify all the expenses incurred in the production process
Determine the quantity of materials required for production
Calculate the cost of each material
Add the cost of labor and overhead expenses
Determine the profit margin and add it to the total cost
Divide the total cost by the number of units produced to get the cost per unit
posted on 7 Aug 2024
based on 1 interview
Interview experience
Site Supervisor
5
salaries
| ₹0.9 L/yr - ₹2.5 L/yr |
Site Engineer
4
salaries
| ₹3.1 L/yr - ₹3.2 L/yr |
Civil Site Engineer
4
salaries
| ₹1.9 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
Tata Technologies
Tata Projects
Megha Engineering & Infrastructures