Quality control is reactive and focuses on identifying defects, while quality assurance is proactive and focuses on preventing defects.
Quality control involves inspecting and testing products to identify defects and ensure they meet standards.
Quality assurance involves implementing processes and procedures to prevent defects from occurring in the first place.
Quality control is reactive, meaning it occurs after the prod...
Quality assurance ensures that products are made to meet the required standards and specifications.
Quality assurance involves setting standards and specifications for the product.
Quality control measures are put in place to ensure that the product meets these standards.
Testing and inspection are carried out at various stages of production to identify and correct any defects.
Continuous improvement processes are implemen...
I applied via Referral and was interviewed before Jan 2022. There were 2 interview rounds.
Generic Engineering Construction and Projects interview questions for popular designations
I applied via Referral and was interviewed before Jan 2022. There was 1 interview round.
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 13 Feb 2025
I was interviewed in Jan 2025.
based on 7 interviews
Interview experience
based on 66 reviews
Rating in categories
Civil Site Engineer
23
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Project Manager
11
salaries
| ₹10 L/yr - ₹15.2 L/yr |
Site Engineer
9
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Junior Engineer
8
salaries
| ₹2.1 L/yr - ₹3.5 L/yr |
Senior Site Engineer
7
salaries
| ₹4.5 L/yr - ₹9.7 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company