Gem Engserv Interview Questions and Answers

Updated 26 May 2025
Popular Designations

35 Interview questions

An Environmental Health and Safety Manager was asked 1mo ago
Q. What are Safety Management Systems?
Ans. 

Safety Management Systems (SMS) are structured frameworks for managing safety risks and ensuring compliance in organizations.

  • Risk Assessment: SMS involves identifying hazards and assessing risks to implement appropriate control measures, such as conducting regular safety audits.

  • Policy Development: Organizations create safety policies that outline their commitment to safety and the procedures to follow, like a work...

View all Environmental Health and Safety Manager interview questions
An Environmental Health and Safety Manager was asked 1mo ago
Q. What are the control measures for HIRA (Hazard Identification and Risk Assessment)?
Ans. 

Control measures for HIRA involve systematic identification and assessment of hazards to ensure workplace safety and compliance.

  • Hazard Identification: Conduct regular inspections and audits to identify potential hazards, such as chemical spills or equipment malfunctions.

  • Risk Assessment: Evaluate the likelihood and severity of identified hazards, using tools like risk matrices to prioritize risks.

  • Control Measures: ...

View all Environmental Health and Safety Manager interview questions
A MEP Supervisor was asked 7mo ago
Q. Which module is used in a flow switch?
Ans. 

The module used in flow switch is a reed switch.

  • Reed switch is commonly used in flow switches to detect the flow of liquid or gas.

  • It consists of two metal reeds inside a glass tube that are magnetically actuated.

  • When the flow of fluid moves the reeds, they come into contact and complete an electrical circuit.

  • This triggers the switch to indicate the presence of flow.

  • Reed switches are reliable and have a long operat...

View all MEP Supervisor interview questions
A MEP Supervisor was asked 7mo ago
Q. Why can't transformers be synchronized?
Ans. 

Transformers cannot be synchronized due to differences in frequency, phase angle, and voltage levels.

  • Transformers have different frequency ratings which prevent them from being synchronized.

  • Phase angle differences between transformers also make synchronization impossible.

  • Voltage levels may vary between transformers, further complicating synchronization.

  • Synchronization requires identical parameters in order to oper...

View all MEP Supervisor interview questions
A MEP Supervisor was asked 7mo ago
Q. What is an IDMT relay?
Ans. 

IDMT relay stands for Inverse Definite Minimum Time relay, used for protection in electrical systems.

  • IDMT relay is a type of protective relay used in electrical systems.

  • It operates based on the principle of inverse time characteristics.

  • The relay operates faster for higher fault currents and slower for lower fault currents.

  • IDMT relays are commonly used for overcurrent protection in power systems.

  • They are designed t...

View all MEP Supervisor interview questions
A MEP Supervisor was asked 7mo ago
Q. What does Dyn11 signify in a transformer?
Ans. 

Dyn 11 is a transformer connection where the primary winding is connected in delta and the secondary winding is connected in star with neutral grounded.

  • Dyn 11 is a common transformer connection used in power distribution systems.

  • In Dyn 11 connection, the primary winding is connected in delta configuration while the secondary winding is connected in star configuration with neutral grounded.

  • This configuration provid...

View all MEP Supervisor interview questions
A MEP Supervisor was asked 7mo ago
Q. What is power factor?
Ans. 

Power factor is a measure of how effectively electrical power is being used in a system.

  • Power factor is the ratio of real power (kW) to apparent power (kVA) in an electrical system.

  • It indicates how efficiently power is being converted into useful work.

  • A power factor of 1 indicates all power is being used effectively, while a lower power factor means some power is being wasted.

  • Power factor correction can be used to...

View all MEP Supervisor interview questions
Are these interview questions helpful?
A MEP Supervisor was asked 7mo ago
Q. What will be the breaker size on the LT side for a 2000 kVA transformer?
Ans. 

The breaker size on LT side for a 2000kVA transformer will depend on the specific requirements of the transformer and the system it is connected to.

  • The breaker size on the LT side of a transformer is typically determined based on the transformer's full load current (FLC) and the system's short circuit current rating.

  • Factors such as the type of protection required (thermal, magnetic, or both), the type of system (s...

View all MEP Supervisor interview questions
A MEP Supervisor was asked 7mo ago
Q. What is the thickness of medium and heavy-duty PVC conduit?
Ans. 

The thickness of medium duty PVC conduit is typically around 1.5mm to 2mm, while heavy duty PVC conduit can range from 2.5mm to 3mm.

  • Medium duty PVC conduit thickness: 1.5mm to 2mm

  • Heavy duty PVC conduit thickness: 2.5mm to 3mm

View all MEP Supervisor interview questions
A MEP Supervisor was asked 7mo ago
Q. What is synchronization?
Ans. 

Synchronization is the coordination of events to operate in unison.

  • Synchronization ensures that different components or processes work together smoothly

  • It prevents conflicts or errors that may arise from simultaneous actions

  • Examples include synchronizing data between multiple devices, coordinating traffic signals, and aligning audio and video in multimedia applications

View all MEP Supervisor interview questions

Gem Engserv Interview Experiences

27 interviews found

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. Tell us about the procedure for fixing of false ceiling in detail
  • Ans. 

    The procedure for fixing false ceiling involves several steps including measuring, marking, framing, and installation.

    • Measure the area where the false ceiling will be installed

    • Mark the area with chalk or pencil

    • Frame the area with metal channels or wooden battens

    • Install the false ceiling tiles or panels onto the frame

    • Finish the edges with trim or molding

  • Answered by AI
  • Q2. Rate anlysis for tile flooring and cladding
  • Ans. 

    Rate analysis for tile flooring and cladding involves calculating the cost of materials, labor, and other expenses.

    • Determine the area to be covered by the tiles

    • Calculate the cost of tiles per square foot/meter

    • Estimate the cost of labor and other expenses such as adhesive, grout, and sealant

    • Add all the costs to get the total cost of the project

    • Compare the cost with the budget to ensure it is feasible

  • Answered by AI
  • Q3. What we have to check during door frame factory visit for teak and miranti frame
  • Ans. 

    During a door frame factory visit for teak and miranti frame, we need to check for quality, dimensions, moisture content, and finishing.

    • Check the quality of the wood used for the frame

    • Check the dimensions of the frame to ensure it fits the door properly

    • Check the moisture content of the wood to ensure it is not too high or too low

    • Check the finishing of the frame to ensure it is smooth and even

    • Ensure that the frame is fr...

  • Answered by AI
  • Q4. Difference between Vineer door and laminated door
  • Ans. 

    Veneer doors are made of thin slices of real wood while laminated doors are made of synthetic materials.

    • Veneer doors have a natural wood grain and texture while laminated doors have a smooth and consistent appearance.

    • Veneer doors are more expensive than laminated doors.

    • Laminated doors are more durable and resistant to scratches and moisture than veneer doors.

    • Veneer doors require more maintenance and care than laminated...

  • Answered by AI
  • Q5. Major difference in vitrified tile and ceramic tiles?
  • Ans. 

    Vitrified tiles are denser and more durable than ceramic tiles.

    • Vitrified tiles are made by fusing clay and silica at high temperatures, resulting in a non-porous and harder surface.

    • Ceramic tiles are made by baking a mixture of clay and other natural materials at lower temperatures.

    • Vitrified tiles are more resistant to stains, scratches, and moisture than ceramic tiles.

    • Ceramic tiles are more affordable than vitrified ti...

  • Answered by AI
  • Q6. What type of waterproofing used in water tanks, sunk with detail procedure
  • Ans. 

    The most common waterproofing used in water tanks is cementitious waterproofing.

    • Clean the surface of the tank and make sure it is free from any debris or dirt.

    • Apply a coat of primer to the surface of the tank.

    • Mix the cementitious waterproofing material with water according to the manufacturer's instructions.

    • Apply the first coat of waterproofing material using a brush or spray gun.

    • Allow the first coat to dry completely ...

  • Answered by AI
  • Q7. Your previous projects cost, type of project , built-up area , scope
  • Ans. 

    I have worked on various projects with different costs, types, built-up areas, and scopes.

    • I have managed a residential project with a cost of $10 million and a built-up area of 50,000 square feet.

    • I have also overseen a commercial project with a cost of $5 million and a built-up area of 100,000 square feet.

    • In terms of scope, I have handled projects involving interior finishing, including flooring, painting, and installa...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was based on what you have done in your previous projects. Most of the questions were asked to me related my previous experiences. You have to go through with all details of each and every activity before attending the interview. If questions will be related to false ceiling they can ask section of framing, sizes, make/ brand , rate anlysis, work method statement for particular activity, labour productivity, what type of false ceiling Grid ceiling/ gypsum board ceiling.

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. What are Safety Management Systems?
  • Ans. 

    Safety Management Systems (SMS) are structured frameworks for managing safety risks and ensuring compliance in organizations.

    • Risk Assessment: SMS involves identifying hazards and assessing risks to implement appropriate control measures, such as conducting regular safety audits.

    • Policy Development: Organizations create safety policies that outline their commitment to safety and the procedures to follow, like a workplace...

  • Answered by AI
  • Q2. What are the control measures for HIRA (Hazard Identification and Risk Assessment)?
  • Ans. 

    Control measures for HIRA involve systematic identification and assessment of hazards to ensure workplace safety and compliance.

    • Hazard Identification: Conduct regular inspections and audits to identify potential hazards, such as chemical spills or equipment malfunctions.

    • Risk Assessment: Evaluate the likelihood and severity of identified hazards, using tools like risk matrices to prioritize risks.

    • Control Measures: Imple...

  • Answered by AI

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Aug 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Ans. 

    Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.

    • Penetration test involves identifying vulnerabilities in a system or network.

    • It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.

    • The goal of a penetration test is to strengthen the security defenses of the system or network.

    • Common ...

  • Answered by AI
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the mix design how we do the mix design of concrete
  • Ans. 

    Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete to achieve desired properties.

    • Determine the required strength and durability of the concrete

    • Select suitable materials such as cement, aggregates, water, and admixtures

    • Calculate the proportions of each material based on desired properties and specifications

    • Perform trial mixes to test the properties of the co...

  • Answered by AI
  • Q2. All material testings and procedures
  • Q3. Finishing activities

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job platform we get good knowledge of all construction activities.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Oct 2024, where I was asked the following questions.

  • Q1. Tile start to end sequence
  • Ans. 

    The tile installation process involves preparation, layout, cutting, and grouting for a successful finish.

    • 1. Surface Preparation: Ensure the substrate is clean, dry, and level. Example: Remove old flooring or debris.

    • 2. Layout Planning: Measure and mark the layout to avoid small tile cuts at edges. Example: Use chalk lines for guidance.

    • 3. Cutting Tiles: Use a tile cutter or wet saw for precise cuts. Example: Cut tiles t...

  • Answered by AI
  • Q2. Steel BBS Reinforcement
  • Q3. Gypsum start to end checking

Interview Questions & Answers

user image Anonymous

posted on 25 Nov 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2024, where I was asked the following questions.

  • Q1. What is the process for casting concrete cubes in a myone slab?
  • Q2. What computer skills do you possess that are relevant to the construction industry?

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice company.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How do you make RMC reconciliation?
  • Ans. 

    RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.

    • Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.

    • Compare the quantity of RMC ordered with the quantity actually used in construction.

    • Identify any discrepancies and investigate the reasons behind them.

    • Adjust the records accordingly to ensure accurate billing and ...

  • Answered by AI
  • Q2. How to calculate bbs ?
  • Ans. 

    BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.

    • Calculate the total length of bars required for each diameter and type of reinforcement.

    • Determine the number of bars required for each diameter and type of reinforcement.

    • Calculate the total weight of bars required for each diameter and type of reinforcement.

    • Prepare a detailed schedule...

  • Answered by AI
  • Q3. How to check paint measurements?
  • Ans. 

    Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.

    • Use a paint thickness gauge to measure the thickness of the paint layer.

    • Compare the measured thickness with the specified thickness in the project specifications.

    • Ensure that the paint thickness is uniform across the surface.

    • Repeat the measurements at multiple points to ensure accuracy.

    • Adjust the paint application if...

  • Answered by AI
  • Q4. How do you find extra items for WO amendment?
  • Ans. 

    Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.

    • Review project specifications for any missed items or changes

    • Consult with stakeholders such as architects, engineers, and contractors for input

    • Conduct site visits to identify any additional work required

    • Analyze previous change orders to see if any item...

  • Answered by AI
  • Q5. How do you ConsiderJMR is right or wrong?
  • Ans. 

    Consider JMR based on project specifications, quantities, rates, and market conditions.

    • Review project specifications to ensure accurate billing

    • Verify quantities of materials and work done

    • Check rates for labor, materials, and equipment

    • Consider market conditions for pricing accuracy

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For billing engineer interview you should practice of bbs and procedures of billing and backup required for billing process!

MEP Manager Interview Questions & Answers

user image Anonymous

posted on 12 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Abou lift landing and storm water drain slope
  • Q2. Electrical load calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - Must join the company, salary on time
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Safety procedures and regulations
  • Q2. BOCW act and benifit
  • Q3. Safety policy about
  • Q4. HIRA preparation
Round 3 - Technical 

(1 Question)

  • Q1. Role and responsibilities
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Grade of concrete at site
  • Ans. 

    Grade of concrete at site refers to the strength of the concrete mix used in construction.

    • Grade of concrete is specified by its compressive strength in megapascals (MPa) at 28 days.

    • Common grades of concrete include M20, M25, M30, etc.

    • Higher grade concrete indicates higher strength and durability.

    • The grade of concrete is determined by the mix design and testing of samples.

    • For example, M25 grade concrete has a compressiv...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be confident
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(11 Questions)

  • Q1. What is power factor?
  • Ans. 

    Power factor is a measure of how effectively electrical power is being used in a system.

    • Power factor is the ratio of real power (kW) to apparent power (kVA) in an electrical system.

    • It indicates how efficiently power is being converted into useful work.

    • A power factor of 1 indicates all power is being used effectively, while a lower power factor means some power is being wasted.

    • Power factor correction can be used to impr...

  • Answered by AI
  • Q2. What is dyn 11 in transformer?
  • Ans. 

    Dyn 11 is a transformer connection where the primary winding is connected in delta and the secondary winding is connected in star with neutral grounded.

    • Dyn 11 is a common transformer connection used in power distribution systems.

    • In Dyn 11 connection, the primary winding is connected in delta configuration while the secondary winding is connected in star configuration with neutral grounded.

    • This configuration provides a ...

  • Answered by AI
  • Q3. What is IDMT relay
  • Ans. 

    IDMT relay stands for Inverse Definite Minimum Time relay, used for protection in electrical systems.

    • IDMT relay is a type of protective relay used in electrical systems.

    • It operates based on the principle of inverse time characteristics.

    • The relay operates faster for higher fault currents and slower for lower fault currents.

    • IDMT relays are commonly used for overcurrent protection in power systems.

    • They are designed to tri...

  • Answered by AI
  • Q4. Types of cooling in transformer
  • Ans. 

    There are two main types of cooling in transformers: oil cooling and air cooling.

    • Oil cooling involves circulating oil within the transformer to dissipate heat.

    • Air cooling uses fans to blow air over the transformer coils to cool them down.

    • Oil cooling is more efficient but requires more maintenance, while air cooling is simpler and cheaper.

    • Examples of oil-cooled transformers include distribution transformers, while power...

  • Answered by AI
  • Q5. How to calculate cable size as per load
  • Ans. 

    Cable size is calculated based on the load requirements to ensure safety and efficiency.

    • Calculate the total load in amperes (A) by adding up the individual loads of all connected devices.

    • Determine the voltage (V) of the circuit.

    • Use the formula: Cable size (mm²) = (2 x length x current) / (voltage drop x cos θ)

    • Consider factors such as voltage drop, ambient temperature, and installation method when selecting cable size.

    • F...

  • Answered by AI
  • Q6. Types of Fire Alarm system
  • Ans. 

    There are mainly two types of fire alarm systems: Conventional and Addressable.

    • Conventional fire alarm system: divides the building into zones with detectors and manual call points connected to a central control panel.

    • Addressable fire alarm system: each device has a unique address, allowing for specific identification of the location of a fire or fault.

    • Other types include wireless fire alarm systems, aspirating smoke d...

  • Answered by AI
  • Q7. Which module is used in flow switch
  • Ans. 

    The module used in flow switch is a reed switch.

    • Reed switch is commonly used in flow switches to detect the flow of liquid or gas.

    • It consists of two metal reeds inside a glass tube that are magnetically actuated.

    • When the flow of fluid moves the reeds, they come into contact and complete an electrical circuit.

    • This triggers the switch to indicate the presence of flow.

    • Reed switches are reliable and have a long operational...

  • Answered by AI
  • Q8. What is synchronization
  • Ans. 

    Synchronization is the coordination of events to operate in unison.

    • Synchronization ensures that different components or processes work together smoothly

    • It prevents conflicts or errors that may arise from simultaneous actions

    • Examples include synchronizing data between multiple devices, coordinating traffic signals, and aligning audio and video in multimedia applications

  • Answered by AI
  • Q9. Why transformer cannot be synchronize
  • Ans. 

    Transformers cannot be synchronized due to differences in frequency, phase angle, and voltage levels.

    • Transformers have different frequency ratings which prevent them from being synchronized.

    • Phase angle differences between transformers also make synchronization impossible.

    • Voltage levels may vary between transformers, further complicating synchronization.

    • Synchronization requires identical parameters in order to operate e...

  • Answered by AI
  • Q10. What will be the braker size on LT side for 2000kva transformer
  • Ans. 

    The breaker size on LT side for a 2000kVA transformer will depend on the specific requirements of the transformer and the system it is connected to.

    • The breaker size on the LT side of a transformer is typically determined based on the transformer's full load current (FLC) and the system's short circuit current rating.

    • Factors such as the type of protection required (thermal, magnetic, or both), the type of system (single...

  • Answered by AI
  • Q11. What is the thickness of medium and heay duty PVC condute
  • Ans. 

    The thickness of medium duty PVC conduit is typically around 1.5mm to 2mm, while heavy duty PVC conduit can range from 2.5mm to 3mm.

    • Medium duty PVC conduit thickness: 1.5mm to 2mm

    • Heavy duty PVC conduit thickness: 2.5mm to 3mm

  • Answered by AI

Skills evaluated in this interview

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Gem Engserv?
Ask anonymously on communities.

Gem Engserv Interview FAQs

How many rounds are there in Gem Engserv interview?
Gem Engserv interview process usually has 1-2 rounds. The most common rounds in the Gem Engserv interview process are Technical, Resume Shortlist and HR.
How to prepare for Gem Engserv interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Gem Engserv. The most common topics and skills that interviewers at Gem Engserv expect are Quality Control, QC Inspection, Project Planning, QC and Quality Audit.
What are the top questions asked in Gem Engserv interview?

Some of the top questions asked at the Gem Engserv interview -

  1. Tell us about the procedure for fixing of false ceiling in det...read more
  2. What we have to check during door frame factory visit for teak and miranti fr...read more
  3. What type of waterproofing used in water tanks, sunk with detail proced...read more
How long is the Gem Engserv interview process?

The duration of Gem Engserv interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.2/5

based on 24 interview experiences

Difficulty level

Easy 7%
Moderate 80%
Hard 13%

Duration

Less than 2 weeks 67%
2-4 weeks 27%
4-6 weeks 7%
View more

Interview Questions from Similar Companies

R.V.R. PROJECTS Interview Questions
4.1
 • 41 Interviews
Balajee Group Interview Questions
3.6
 • 13 Interviews
Perkins Interview Questions
4.3
 • 11 Interviews
NKC Projects Interview Questions
4.0
 • 11 Interviews
View all

Gem Engserv Reviews and Ratings

based on 202 reviews

4.0/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

3.8

Salary

3.5

Job security

3.8

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 202 Reviews and Ratings
Hiring Architect in GEM Engserv Pvt Ltd @ BKC, Mumbai

Mumbai,

Mumbai Suburban

+1

7-12 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
65 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Safety Officer
24 salaries
unlock blur

₹3.2 L/yr - ₹6.5 L/yr

Senior Engineer
22 salaries
unlock blur

₹5 L/yr - ₹8.5 L/yr

Assistant Manager - MEP
18 salaries
unlock blur

₹5 L/yr - ₹9.2 L/yr

Civil Site Engineer
15 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Explore more salaries
Compare Gem Engserv with

Lea Associates South Asia

4.3
Compare

R.V.R. PROJECTS

4.1
Compare

ABCI Infrastructures

3.5
Compare

VIKRAN Engineering & Exim

4.0
Compare
write
Share an Interview