Upload Button Icon Add office photos

GE Vernova T&D India

Compare button icon Compare button icon Compare

Filter interviews by

GE Vernova T&D India Lead Project Manager Interview Questions and Answers

Updated 24 Jul 2024

GE Vernova T&D India Lead Project Manager Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Thermal powèr Plant and substation related questions
Round 2 - HR 

(2 Questions)

  • Q1. Current Salery and perks
  • Q2. Expected Salery and final negotiations

I applied via Recruitment Consultant and was interviewed in Aug 2019. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. The question were related to your experience and how you managing Projects, how you are contributing company's target like Revenue , collection ,OTD & profitability.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be straight forward, tell the truth what you are doing, how you can improve further and why company will hire you?

Lead Project Manager Interview Questions Asked at Other Companies

asked in Stellantis
Q1. Which Project management methodologies should be be applied per s ... read more
asked in Hoonartek
Q2. How to handle Conflict management
asked in Stellantis
Q3. How do you manage conflicts?
asked in Hoonartek
Q4. Manage multiple projects simultaneously

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are closed loop control system
  • Ans. 

    Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.

    • Closed loop control systems use feedback to maintain a desired output

    • They continuously monitor the output and compare it to the desired input

    • Based on the comparison, adjustments are made to maintain the desired output

    • Examples include thermostat-controlled heating systems and cruise control in cars

  • Answered by AI
  • Q2. Details of Field instruments
Round 3 - Technical 

(3 Questions)

  • Q1. Brief discussion on c&i
  • Q2. How you will handle the situations
  • Q3. What are expecting from us

Interview Preparation Tips

Interview preparation tips for other job seekers - Always prepare in detail what u have written in resume.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Your name, qualification & why you want to join organisation
Round 2 - Technical 

(1 Question)

  • Q1. I was hired for condition monitoring roll. It was basic questions with vibration analysis. You should know the basics and case study.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & you should have basis knowledge.

Interview Questionnaire 

2 Questions

  • Q1. Pullout Test CBR Test ERT paling MMS coordinate survey boundary concrete cube slmp test cement test
  • Q2. No material vestege paling concrete
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What's your past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Product good, provide product training and All over good experience

I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Salary and notice period
  • Q2. Why you are changing the company

Interview Preparation Tips

Topics to prepare for Waaree Energies Assistant Manager interview:
  • Lean Manufacturing
Interview preparation tips for other job seekers - Don't come in this company. Very unprofessional HR and non industrialists people. There is no connection of your Roles and responsibilities with interview questions. Even interviewers Don't know about the questions.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What is Process about New development
  • Ans. 

    Process about new development involves planning, designing, testing, and implementing innovative ideas or products.

    • Researching market trends and customer needs

    • Creating a detailed project plan

    • Collaborating with cross-functional teams

    • Testing prototypes and gathering feedback

    • Iterating on designs based on feedback

    • Launching the new product or service

  • Answered by AI
  • Q2. What is MSA, Control Plan
  • Ans. 

    MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.

    • MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.

    • Control Plan is a detailed document outlining the steps to maintain quality control in production processes.

    • MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.

    • Con...

  • Answered by AI
  • Q3. What is 7 QC Tools
  • Ans. 

    7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.

    • Check Sheet: Used to collect and analyze data in an organized manner.

    • Histogram: Represents data distribution visually to identify patterns and trends.

    • Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.

    • Cause and Effect Diagram (Fishbone Diagram): Identifies root ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge about any field in Details

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Cable type and it's current rating
  • Ans. 

    Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.

    • Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)

    • Current rating is determined by factors such as conductor size, insulation material, and ambien...

  • Answered by AI
  • Q2. What were the costs and other technical parameters, such as the client and scope of work, for your last project?
  • Ans. 

    The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.

    • Client: Company A

    • Scope of work: Development of new software system

    • Cost: $100,000

    • Technical parameters: Integration with existing systems, timeline of 6 months

  • Answered by AI
  • Q3. What are the types of substations and how does a bay function within them?
  • Ans. 

    Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.

    • Types of substations include distribution substations, transmission substations, and switching substations.

    • Distribution substations typically step down voltage for local distribution to customers.

    • Transmission substations step up voltage for long-distanc...

  • Answered by AI

I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. About job profile and competency in SAP
Round 3 - HR 

(1 Question)

  • Q1. ABOUT SALARY AND NEGOTIATION

Interview Preparation Tips

Interview preparation tips for other job seekers - INTRODUCE YOURSELF, VERY SEPECIFIC TO THE JOB PROFILE AND YOUR ACHEIVEMENTS

GE Vernova T&D India Interview FAQs

How many rounds are there in GE Vernova T&D India Lead Project Manager interview?
GE Vernova T&D India interview process usually has 2 rounds. The most common rounds in the GE Vernova T&D India interview process are Technical and HR.
What are the top questions asked in GE Vernova T&D India Lead Project Manager interview?

Some of the top questions asked at the GE Vernova T&D India Lead Project Manager interview -

  1. Thermal powèr Plant and substation related questi...read more
  2. Expected Salery and final negotiati...read more
  3. Current Salery and pe...read more

Tell us how to improve this page.

GE Vernova T&D India Lead Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 223 Interviews
ReNew Interview Questions
4.2
 • 88 Interviews
Vestas Interview Questions
4.2
 • 86 Interviews
Hitachi Energy Interview Questions
4.1
 • 82 Interviews
Jakson Group Interview Questions
4.2
 • 78 Interviews
Siemens Energy Interview Questions
4.1
 • 74 Interviews
Waaree Energies Interview Questions
3.9
 • 58 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
View all
GE Vernova T&D India Lead Project Manager Salary
based on 18 salaries
₹12.5 L/yr - ₹25 L/yr
8% less than the average Lead Project Manager Salary in India
View more details

GE Vernova T&D India Lead Project Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

-

Skill development

-

Work-life balance

-

Salary

-

Job security

-

Company culture

-

Promotions

-

Work satisfaction

Explore 1 Review and Rating
Project Manager
42 salaries
unlock blur

₹6.5 L/yr - ₹23.8 L/yr

Scada Engineer
24 salaries
unlock blur

₹3 L/yr - ₹7.5 L/yr

Site Manager
23 salaries
unlock blur

₹6 L/yr - ₹13 L/yr

Assistant Manager
22 salaries
unlock blur

₹5.5 L/yr - ₹13.5 L/yr

Quality Engineer
21 salaries
unlock blur

₹2.4 L/yr - ₹4 L/yr

Explore more salaries
Compare GE Vernova T&D India with

Adani Power

3.9
Compare

ReNew

4.2
Compare

Adani Green Energy

4.1
Compare

Vestas

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview