Filter interviews by
I applied via Referral and was interviewed before Nov 2020. There were 5 interview rounds.
Quality of work is of utmost importance in project management.
Quality should be defined and agreed upon with stakeholders.
Quality control measures should be put in place to ensure standards are met.
Regular quality checks and audits should be conducted.
Corrective actions should be taken if quality standards are not met.
Quality should be monitored throughout the project lifecycle.
Examples: ensuring code quality in softwa...
I applied via Referral and was interviewed before Jan 2024. There was 1 interview round.
Superelevation is the banking of a road or railway track around a curve to counteract the effects of centrifugal force.
Superelevation helps vehicles or trains to travel around curves at higher speeds safely.
It reduces the tendency of vehicles to overturn or derail on curves.
The amount of superelevation required depends on factors like curve radius, design speed, and vehicle type.
Superelevation is usually expressed as a...
I was interviewed before Jan 2024.
Risk assessment is the process of identifying, analyzing, and evaluating potential risks to determine their impact and likelihood.
Identify potential risks by examining internal and external factors
Analyze the risks by assessing their impact and likelihood
Evaluate the risks by prioritizing them based on severity and probability
Develop risk mitigation strategies to address the identified risks
Regularly review and update ...
Identifying hazards, assessing risks, and implementing precautions involve thorough evaluation and proactive measures to ensure safety.
Identify potential hazards in the workplace, such as slippery floors, faulty equipment, or hazardous chemicals.
Assess the risks associated with each hazard by considering the likelihood of occurrence and the potential impact on employees.
Implement precautions to control or eliminate the...
MSDS stands for Material Safety Data Sheet, a document that provides information on the properties of chemicals and how to safely handle them.
MSDS includes information on chemical composition, physical and chemical properties, health hazards, first aid measures, and safe handling procedures.
It is important for employees to be familiar with MSDS for any chemicals they work with to ensure safety in the workplace.
For exam...
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
Gawar Construction interview questions for popular designations
DBM laying procedure involves preparation of subgrade, spreading of DBM mix, compaction and finishing.
Subgrade preparation involves removing any loose soil or debris and compacting the surface.
DBM mix is then spread over the subgrade in layers and compacted using a roller.
The thickness of each layer depends on the design specifications and traffic volume.
The final layer is finished using a paver to achieve a smooth sur...
I applied via Referral and was interviewed before Aug 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2020. There was 1 interview round.
Tolerance in GSB .Dbm. SG top
GSB refers to General Specification for Building
Dbm stands for decibels relative to milliwatts
SG top refers to the top surface of the surveying point
Tolerance refers to the acceptable deviation or error allowed in measurements
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
based on 8 interviews
Interview experience
based on 209 reviews
Rating in categories
Structural Engineer
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company