Add office photos
Employer?
Claim Account for FREE

Gawar Construction

3.9
based on 200 Reviews
Filter interviews by

Solvative Interview Questions and Answers

Updated 24 Jan 2025

Q1. What are the steps for identifying hazards, assessing risks, and implementing precautions as per the job specification?

Ans.

Identifying hazards, assessing risks, and implementing precautions involve thorough evaluation and proactive measures to ensure safety.

  • Identify potential hazards in the workplace, such as slippery floors, faulty equipment, or hazardous chemicals.

  • Assess the risks associated with each hazard by considering the likelihood of occurrence and the potential impact on employees.

  • Implement precautions to control or eliminate the identified hazards, such as providing safety training, in...read more

Add your answer

Q2. What is the process of risk assessment?

Ans.

Risk assessment is the process of identifying, analyzing, and evaluating potential risks to determine their impact and likelihood.

  • Identify potential risks by examining internal and external factors

  • Analyze the risks by assessing their impact and likelihood

  • Evaluate the risks by prioritizing them based on severity and probability

  • Develop risk mitigation strategies to address the identified risks

  • Regularly review and update the risk assessment process to adapt to changing circumsta...read more

Add your answer

Q3. Tolerance in GSB .Dbm. SG top

Ans.

Tolerance in GSB .Dbm. SG top

  • GSB refers to General Specification for Building

  • Dbm stands for decibels relative to milliwatts

  • SG top refers to the top surface of the surveying point

  • Tolerance refers to the acceptable deviation or error allowed in measurements

View 2 more answers

Q4. Quality of work

Ans.

Quality of work is of utmost importance in project management.

  • Quality should be defined and agreed upon with stakeholders.

  • Quality control measures should be put in place to ensure standards are met.

  • Regular quality checks and audits should be conducted.

  • Corrective actions should be taken if quality standards are not met.

  • Quality should be monitored throughout the project lifecycle.

  • Examples: ensuring code quality in software development, meeting safety standards in construction p...read more

Add your answer
Discover Solvative interview dos and don'ts from real experiences

Q5. What is the MSDS

Ans.

MSDS stands for Material Safety Data Sheet, a document that provides information on the properties of chemicals and how to safely handle them.

  • MSDS includes information on chemical composition, physical and chemical properties, health hazards, first aid measures, and safe handling procedures.

  • It is important for employees to be familiar with MSDS for any chemicals they work with to ensure safety in the workplace.

  • For example, an MSDS for a cleaning product would provide informat...read more

Add your answer

Q6. D.b.m laying procedure

Ans.

DBM laying procedure involves preparation of subgrade, spreading of DBM mix, compaction and finishing.

  • Subgrade preparation involves removing any loose soil or debris and compacting the surface.

  • DBM mix is then spread over the subgrade in layers and compacted using a roller.

  • The thickness of each layer depends on the design specifications and traffic volume.

  • The final layer is finished using a paver to achieve a smooth surface.

  • Curing is done for a minimum of 7 days before the roa...read more

Add your answer

Q7. Superelevation along a curve.

Ans.

Superelevation is the banking of a road or railway track around a curve to counteract the effects of centrifugal force.

  • Superelevation helps vehicles or trains to travel around curves at higher speeds safely.

  • It reduces the tendency of vehicles to overturn or derail on curves.

  • The amount of superelevation required depends on factors like curve radius, design speed, and vehicle type.

  • Superelevation is usually expressed as a percentage of the horizontal distance.

  • For example, a 6% s...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Solvative

based on 7 interviews
Interview experience
4.0
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.4
 • 497 Interview Questions
3.8
 • 257 Interview Questions
4.2
 • 206 Interview Questions
4.2
 • 159 Interview Questions
3.9
 • 138 Interview Questions
View all
Top Gawar Construction Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter