Filter interviews by
I applied via Referral and was interviewed before Aug 2020. There was 1 interview round.
I applied via Referral and was interviewed before Jan 2024. There was 1 interview round.
Superelevation is the banking of a road or railway track around a curve to counteract the effects of centrifugal force.
Superelevation helps vehicles or trains to travel around curves at higher speeds safely.
It reduces the tendency of vehicles to overturn or derail on curves.
The amount of superelevation required depends on factors like curve radius, design speed, and vehicle type.
Superelevation is usually expressed as a...
I appeared for an interview before Jan 2024.
Risk assessment is the process of identifying, analyzing, and evaluating potential risks to determine their impact and likelihood.
Identify potential risks by examining internal and external factors
Analyze the risks by assessing their impact and likelihood
Evaluate the risks by prioritizing them based on severity and probability
Develop risk mitigation strategies to address the identified risks
Regularly review and update ...
Identifying hazards, assessing risks, and implementing precautions involve thorough evaluation and proactive measures to ensure safety.
Identify potential hazards in the workplace, such as slippery floors, faulty equipment, or hazardous chemicals.
Assess the risks associated with each hazard by considering the likelihood of occurrence and the potential impact on employees.
Implement precautions to control or eliminate the...
MSDS stands for Material Safety Data Sheet, a document that provides information on the properties of chemicals and how to safely handle them.
MSDS includes information on chemical composition, physical and chemical properties, health hazards, first aid measures, and safe handling procedures.
It is important for employees to be familiar with MSDS for any chemicals they work with to ensure safety in the workplace.
For exam...
I applied via Referral and was interviewed before Nov 2020. There were 5 interview rounds.
Quality of work is of utmost importance in project management.
Quality should be defined and agreed upon with stakeholders.
Quality control measures should be put in place to ensure standards are met.
Regular quality checks and audits should be conducted.
Corrective actions should be taken if quality standards are not met.
Quality should be monitored throughout the project lifecycle.
Examples: ensuring code quality in softwa...
Gawar Construction interview questions for popular designations
DBM laying procedure involves preparation of subgrade, spreading of DBM mix, compaction and finishing.
Subgrade preparation involves removing any loose soil or debris and compacting the surface.
DBM mix is then spread over the subgrade in layers and compacted using a roller.
The thickness of each layer depends on the design specifications and traffic volume.
The final layer is finished using a paver to achieve a smooth sur...
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2020. There was 1 interview round.
Tolerance in GSB .Dbm. SG top
GSB refers to General Specification for Building
Dbm stands for decibels relative to milliwatts
SG top refers to the top surface of the surveying point
Tolerance refers to the acceptable deviation or error allowed in measurements
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
posted on 29 Oct 2024
Technical questions and aptitude questions
About the railways facility
posted on 10 Oct 2024
based on 8 interviews
Interview experience
based on 215 reviews
Rating in categories
Structural Engineer
32
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Highway Engineer
32
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Civil Site Engineer
29
salaries
| ₹1.8 L/yr - ₹3.4 L/yr |
Site Engineer
20
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Project Manager
16
salaries
| ₹11.1 L/yr - ₹28 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
Ramky Infrastructure