RMR value is calculated by assigning scores to various parameters related to rock mass characteristics.
RMR stands for Rock Mass Rating.
It is calculated by assigning scores to six parameters: uniaxial compressive strength, rock quality designation, spacing of discontinuities, condition of discontinuities, groundwater conditions, and orientation of discontinuities.
The scores for each parameter are added up to get the RMR...
Various instruments are used in tunnel excavation, including drilling machines, blasting equipment, and tunnel boring machines.
Drilling machines are used to create holes in the rock or soil for explosives.
Blasting equipment is used to break up the rock or soil.
Tunnel boring machines are used to excavate tunnels without the need for explosives.
Surveying instruments are used to ensure the tunnel is being excavated in the...
RQD stands for Rock Quality Designation, a measure of rock mass quality used in geology and engineering.
RQD is calculated by measuring the percentage of intact rock pieces longer than 10 cm in a drill core sample.
It is used to assess the strength and stability of rock masses for engineering projects such as tunnels, dams, and foundations.
Higher RQD values indicate better rock quality and greater potential for stability...
posted on 29 Mar 2024
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I applied via Recruitment Consulltant and was interviewed in Apr 2021. There were 2 interview rounds.
The daily progress rate of welders varies based on factors such as experience, type of welding, and complexity of the project.
Welders with more experience tend to have a higher daily progress rate.
The type of welding being done can also affect the daily progress rate. For example, TIG welding may take longer than MIG welding.
The complexity of the project can also impact the daily progress rate. A simple welding project...
Project delays can be caused by various constraints.
Project delays can be caused by resource constraints such as lack of manpower or budget constraints.
Technical constraints such as unexpected technical issues or changes in requirements can also cause delays.
External constraints such as weather conditions or delays in receiving materials can also impact project timelines.
Effective project management can help mitigate t
I applied via Campus Placement and was interviewed before Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2021. There were 6 interview rounds.
To raise funding, create a solid business plan and pitch to investors. To control spending, set a budget and track expenses.
Create a detailed business plan that outlines your goals, strategies, and financial projections.
Identify potential investors and pitch your business plan to them.
Consider alternative funding sources such as crowdfunding or small business loans.
Set a budget and track all expenses to ensure you are ...
I applied via Other and was interviewed in May 2021. There were 3 interview rounds.
Assistant Manager
89
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Plant Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Hindustan Construction Company
Larsen & Toubro Limited
Simplex Infrastructures
Shapoorji Pallonji Group