posted on 3 May 2019
I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.
I am currently earning $60,000 per year.
My current salary is $60,000 per year.
I am satisfied with my current salary.
I believe my salary reflects my experience and qualifications.
posted on 13 May 2018
I was interviewed before May 2017.
posted on 23 Apr 2022
posted on 12 Sep 2021
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
I applied via LinkedIn and was interviewed in Aug 2021. There was 1 interview round.
posted on 2 Jul 2021
The capacity of the plant is 1000 units per day.
The plant has a daily production capacity of 1000 units.
The capacity is measured in terms of the number of units produced per day.
This information is crucial for planning and scheduling production activities.
posted on 4 Apr 2021
Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.
Types of piles include driven piles, bored piles, and screw piles.
Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.
The diameter of a pile is determined based on the load it needs to support and the soil conditions.
LVUP (Large...
posted on 18 Dec 2020
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.
posted on 24 Oct 2020
I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.
The amount of cement used for making 1m³ of concrete varies depending on the desired strength and type of concrete.
The cement content typically ranges from 300 to 400 kg/m³ for general-purpose concrete.
For high-strength concrete, the cement content can be as high as 500 kg/m³ or more.
The water-cement ratio also affects the amount of cement required.
Admixtures and additives may be used to modify the properties of the co...
The amount of steel used for 1m³ concreting varies depending on the type of concrete and the structural requirements.
The steel used in concrete is typically in the form of reinforcing bars (rebar) or welded wire mesh.
The amount of steel required for 1m³ of concrete depends on the structural requirements and the type of concrete being used.
For example, a standard reinforced concrete slab may require 70-100 kg of steel p...
based on 1 interview
Interview experience
based on 38 reviews
Rating in categories
Civil Engineer
9
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Assistant Manager
5
salaries
| ₹4.2 L/yr - ₹5.9 L/yr |
Civil Supervisor
5
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Plant Engineer
5
salaries
| ₹3.2 L/yr - ₹4.3 L/yr |
Mechanical Engineer
5
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Hindustan Construction Company
Simplex Infrastructures