Filter interviews by
posted on 1 May 2021
I applied via Walk-in and was interviewed in Nov 2020.Ā There were 3 interview rounds.
KPI of production refers to the key performance indicators that measure the effectiveness and efficiency of production processes.
KPIs help monitor and evaluate the performance of production activities.
Examples of production KPIs include production output, quality, efficiency, downtime, and cost per unit.
KPIs provide insights into areas for improvement and help in making data-driven decisions.
KPIs should be specific, me...
UPH stands for Units Per Hour and UPPH stands for Units Per Person Per Hour. Material management involves the planning, procurement, storage, and control of materials used in production.
UPH is a measure of production efficiency, indicating the number of units produced in an hour.
UPPH is a measure of individual productivity, indicating the number of units produced by each person in an hour.
Material management ensures th...
I applied via Walk-in and was interviewed in Jan 2021.Ā There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2020.Ā There were 3 interview rounds.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Mar 2021.Ā There were 3 interview rounds.
A framework is a set of guidelines, standards, and tools used to develop software applications.
A framework provides a structure for developers to build upon
It includes pre-written code and libraries to simplify development
Frameworks can be specific to a programming language or platform
Examples include React for web development and TensorFlow for machine learning
posted on 19 Nov 2020
I applied via Campus Placement and was interviewed in Jan 2021.Ā There were 3 interview rounds.
Swap two numbers with and without temporary variable
Without temporary variable: Use addition and subtraction
With temporary variable: Use a third variable to store the value of one of the numbers
Example without temporary variable: a=5, b=7; a=a+b; b=a-b; a=a-b;
Example with temporary variable: a=5, b=7; temp=a; a=b; b=temp;
I applied via Naukri.com and was interviewed in Jan 2020.Ā There were 3 interview rounds.
Depreciation is necessary to allocate the cost of an asset over its useful life.
Depreciation helps in matching the cost of an asset with the revenue it generates.
It allows for the recognition of the wear and tear, obsolescence, and loss of value of assets over time.
Depreciation expense reduces taxable income, resulting in tax savings for companies.
It helps in determining the true profitability and financial position of...
based on 6 reviews
Rating in categories
Junior Engineer
10
salaries
| ā¹3 L/yr - ā¹3.3 L/yr |
Assistant Manager
4
salaries
| ā¹12 L/yr - ā¹12.5 L/yr |
QA Engineer
3
salaries
| ā¹3.5 L/yr - ā¹7.5 L/yr |
Junior Engineer Electrical
3
salaries
| ā¹2.7 L/yr - ā¹4.8 L/yr |
Accenture
Amazon
Wipro
Infosys