Filter interviews by
Water supply projects related with family question paper and send me.
Top trending discussions
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
Design Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Chief Engineer
27
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Chief Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Tractebel
Worley
TCE
Mecon