Fichtner Consulting Engineers Site Supervisor Interview Questions and Answers

Updated 19 Mar 2024

Fichtner Consulting Engineers Site Supervisor Interview Experiences

1 interview found

Site Supervisor Interview Questions & Answers

user image Nitish Patel

posted on 19 Mar 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - OK

I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. 1. Make a layout of combined cycle power plant with different structures and components.
  • Ans. 

    Layout of combined cycle power plant with different structures and components.

    • Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.

    • Gas turbine generates electricity by burning natural gas or oil.

    • Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.

    • Steam turbine generates additional electricity using the steam produced by heat reco...

  • Answered by AI
  • Q2. 2 How you design machine foundation for Gas turbine. which are the different types of machine foundations.
  • Ans. 

    Designing machine foundation for gas turbine involves several factors and types of foundations.

    • Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.

    • Types of foundations include block, pile, and raft foundations.

    • Block foundations are suitable for smaller turbines on stable soil.

    • Pile foundations are used for larger turbines or unstable soil.

    • Raft foundations are us...

  • Answered by AI
  • Q3. 3. How you do ductile detailing for beam , column and foundation . which are the IS code you use for ductile detailing.
  • Ans. 

    Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.

    • For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.

    • For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.

    • For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...

  • Answered by AI
  • Q4. 4.what are the different type of pile foundation and how you design them .
  • Ans. 

    Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.

    • Driven piles are installed by hammering or vibrating them into the ground.

    • Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.

    • Screw piles are twisted into the ground using a hydraulic motor.

    • Design considerations include soil type, load c...

  • Answered by AI
  • Q5. 5. How you design shear wall and how you detail it .
  • Ans. 

    Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.

    • Design shear walls based on the building code requirements and structural analysis.

    • Select appropriate materials and thickness for the shear wall.

    • Detail the reinforcement placement and anchorage to ensure proper load transfer.

    • Provide adequate boundary elements and openings for ducts and pipes.

    • Consider seismic and ...

  • Answered by AI
  • Q6. 6. which are the different software you are using for structural analysis.
  • Ans. 

    I have experience with various software for structural analysis.

    • STAAD.Pro

    • SAP2000

    • ETABS

    • ANSYS

    • AutoCAD Structural Detailing

  • Answered by AI
  • Q7. 7. How you model raft foundation or shear wall in finet element method.
  • Ans. 

    To model raft foundation or shear wall in finite element method, one needs to follow certain steps.

    • First, create a 3D model of the foundation or wall using a CAD software.

    • Next, import the model into a finite element analysis software.

    • Define the material properties and boundary conditions.

    • Mesh the model to create finite elements.

    • Solve the model to obtain the stresses and displacements.

    • Finally, analyze the results and ma...

  • Answered by AI
  • Q8. 8. How you design water retaining structures. which is the IS code you use for water retaining structures. and what is the crack width for water retaining structures.
  • Ans. 

    Water retaining structures are designed as per IS code and crack width is limited to ensure safety.

    • Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.

    • IS 3370 is the code used for design of water retaining structures in India.

    • The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.

    • Various types of water retaini...

  • Answered by AI
  • Q9. 9. Have you worked with international codes like American and British codes .
  • Ans. 

    Yes, I have worked with both American and British codes.

    • I have experience working with the International Building Code (IBC) which is based on American codes.

    • I have also worked with British Standards (BS) such as BS 5950 for structural steel design.

    • I am familiar with the differences between the two codes and can adapt accordingly.

  • Answered by AI
  • Q10. 10. What are the different load combination for RCC and Steal structures .
  • Ans. 

    Different load combinations for RCC and Steel structures.

    • Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.

    • Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.

    • Load combinations are determined based on the design codes and standards applicable to the project.

    • The load combinations...

  • Answered by AI
  • Q11. 11. Do you have exposure of site inspection and can you make progress and quality report .
  • Ans. 

    Yes, I have extensive experience in site inspections and creating progress and quality reports.

    • I have conducted site inspections for various projects in my previous roles.

    • I am proficient in creating detailed progress and quality reports based on my observations during site inspections.

    • I have also implemented corrective actions based on the findings of my inspections to ensure project success.

    • For example, in my previous...

  • Answered by AI
  • Q12. 12. Draw a bending moment and shear fonce diagram for portal frame with lateral force and UDL .
  • Ans. 

    To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.

    • Calculate the reactions at the supports

    • Determine the shear force and bending moment at each section

    • Plot the shear force and bending moment diagrams

    • Identify the maximum shear force and bending moment

    • Consider the sign conventions for shear force and bending moment

    • Use appropriate software or tools for accurate results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - you should be perfect in design aspect and fundamentals, different codes and state of art software which you using.

Skills evaluated in this interview

Interview Questionnaire 

9 Questions

  • Q1. What is rolling margin
  • Ans. 

    Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

    • Rolling margin is used to measure the profitability of a business or project.

    • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

    • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

    • For e...

  • Answered by AI
  • Q2. What will you do if the site qty differ from Drawing qty
  • Ans. 

    If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

    • I will review the drawings and specifications to ensure accuracy.

    • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

    • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

    • If there are significant differences, I ...

  • Answered by AI
  • Q3. Tell me about ur self
  • Q4. What is reconciliation of steel
  • Ans. 

    Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

    • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

    • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...

  • Answered by AI
  • Q5. What is the procedure for BBS
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

    • BBS is prepared based on the structural drawings and specifications.

    • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

    • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

    • It is an essential document for t...

  • Answered by AI
  • Q6. How you do the rate analysis
  • Ans. 

    Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

    • Rate analysis involves breaking down the cost of each item in a construction project.

    • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

    • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

    • Rate analysis helps in estimating ...

  • Answered by AI
  • Q7. What is margin for OH & Profits in Rate analysis
  • Ans. 

    Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

    • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

    • It is usually expressed as a percentage of the direct cost.

    • The margin for OH & Profits varies depending on the nature of the project and market conditions.

    • For example, if the direct cost of a proje...

  • Answered by AI
  • Q8. Wastage % for Reinforcement Steel
  • Ans. 

    The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

    • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

    • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

    • Proper planning, accurate cutting, and careful handling can help minimize wastage.

    • Examples of wastage include incorrect cu...

  • Answered by AI
  • Q9. Code for Structural steel and reinforced steel
  • Ans. 

    The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

    • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

    • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

    • Reinforced steel, also known as reba...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain a positive attitude and demonstrate a willingness to learn.

I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions related pipeline

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with your basic knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - You was achieved goal in oil and gas sector and pipe line construction project of CGD.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Contribute & help others!
anonymous
You can choose to be anonymous

Fichtner Consulting Engineers Interview FAQs

How many rounds are there in Fichtner Consulting Engineers Site Supervisor interview?
Fichtner Consulting Engineers interview process usually has 1 rounds. The most common rounds in the Fichtner Consulting Engineers interview process are HR.

Recently Viewed

SALARIES

Bridgei2i Analytics Solutions

INTERVIEWS

Larsen & Toubro Limited

No Interviews

INTERVIEWS

Fichtner Consulting Engineers

No Interviews

CAMPUS PLACEMENT

Anna University

INTERVIEWS

Larsen & Toubro Limited

No Interviews

INTERVIEWS

Larsen & Toubro Limited

No Interviews

COMPANY BENEFITS

Bridgei2i Analytics Solutions

No Benefits

INTERVIEWS

Larsen & Toubro Limited

No Interviews

INTERVIEWS

Fichtner Consulting Engineers

10 top interview questions

SALARIES

Bridgei2i Analytics Solutions

Tell us how to improve this page.

Fichtner Consulting Engineers Site Supervisor Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

TCE Interview Questions
3.8
 • 247 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Worley Interview Questions
4.1
 • 109 Interviews
Mott MacDonald Interview Questions
4.2
 • 43 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
Mecon Interview Questions
3.9
 • 41 Interviews
Ramboll Interview Questions
4.2
 • 37 Interviews
View all

Fast track your campus placements

View all

Fichtner Consulting Engineers Site Supervisor Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Design Engineer
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Chief Engineer
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

QA QC Engineer
22 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Chief Engineer
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Design Engineer
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Fichtner Consulting Engineers with

Tractebel

4.1
Compare

Worley

4.1
Compare

TCE

3.8
Compare

Mecon

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview