45 minutes, 15-20 questions Includes English, basic Engineering
First and Third Angle are two different methods of representing orthographic projections in engineering drawings.
First Angle Projection is commonly used in Europe and Asia, while Third Angle Projection is commonly used in North America.
In First Angle Projection, the object is placed in the first quadrant and the views are projected onto the planes surrounding the object.
In Third Angle Projection, the object is placed i...
TORR stands for Torricelli, a unit of pressure equal to one millimeter of mercury.
TORR is a unit of pressure used in various fields, including engineering and physics.
It is named after Evangelista Torricelli, an Italian physicist and mathematician.
1 TORR is equal to the pressure exerted by a column of mercury 1 millimeter high in a vacuum.
TORR is commonly used in vacuum measurements and is equivalent to approximately 1...
Knurling is a process of creating a pattern of ridges on a cylindrical or flat surface to improve grip or aesthetics.
Knurling is commonly used on tools, handles, and knobs to provide a better grip.
It involves pressing a knurling tool against the surface to create a pattern of ridges or diamond-shaped impressions.
Knurling can be done on various materials such as metal, plastic, or wood.
The pattern created by knurling ca...
QA focuses on preventing defects, while QC focuses on identifying and fixing defects.
QA stands for Quality Assurance and is a proactive process that focuses on preventing defects by establishing processes and standards.
QC stands for Quality Control and is a reactive process that focuses on identifying and fixing defects through inspections and testing.
QA involves activities like creating test plans, conducting reviews,...
I applied via Referral and was interviewed before Apr 2022. There was 1 interview round.
To draw 1st angle symbol, draw a square with a horizontal line on top and a vertical line on the right. To draw 3rd angle symbol, draw a square with a horizontal line on bottom and a vertical line on the left.
1st angle symbol is commonly used in Europe and Asia while 3rd angle symbol is commonly used in North America.
The symbol indicates the orientation of the object in relation to the views shown on the drawing.
1st an...
Knurling is a manufacturing process used to create a pattern of small, raised lines or ridges on a surface.
It is commonly used on handles or grips to improve grip and prevent slipping.
Knurling can be done using a lathe or a specialized knurling tool.
The pattern created by knurling can vary in size, shape, and spacing depending on the desired outcome.
Knurling can also be used for decorative purposes, such as on jewelry
Top trending discussions
I was interviewed in Jan 2025.
It was easy, bacis aptitude questions asked in this round
posted on 7 Jan 2025
I applied via Walk-in and was interviewed in Dec 2024. There were 2 interview rounds.
Its actually based on your voice actually they are hiring for international voice process so you need to have an idea of how international people speak in their language if you have experience in email writing and able to understand british english then its easy for you to clear
I was interviewed in Aug 2024.
I applied via Approached by Company and was interviewed in Jul 2024. There were 3 interview rounds.
It occurred on HackerRank.
posted on 13 Jan 2025
I applied via campus placement at Institute of Cost and Works Accountants of India (ICWAI) and was interviewed in Dec 2024. There were 3 interview rounds.
Online assessment (Technical, English, Reasoning)
Balance sheet shows assets, liabilities, and equity at a specific point in time. Trial balance lists all ledger accounts with their balances.
Balance sheet is a snapshot of a company's financial position at a specific point in time.
Trial balance is a list of all ledger accounts with their balances to ensure debits equal credits.
Balance sheet includes assets, liabilities, and equity sections.
Trial balance is used to prep...
Standard costing formula calculates the expected cost of a product based on predetermined standards.
Standard costing formula includes direct materials, direct labor, and overhead costs.
It helps in comparing actual costs with standard costs to identify variances.
Formula: Standard Cost = Standard Quantity of Inputs x Standard Price of Inputs
Explanation of journal entries for Prepaid, Accruals, Depreciation, Provision for Bad debts, DTA, and DTL.
Prepaid expenses are initially recorded as assets and then expensed over time as they are used up.
Accruals are expenses incurred but not yet paid or revenue earned but not yet received.
Depreciation is the allocation of the cost of a fixed asset over its useful life, with accumulated depreciation representing the to...
Preparation of balance sheet involves listing assets, liabilities, and equity. Ratios are computed using financial data from the balance sheet.
List all assets, liabilities, and equity on the balance sheet
Calculate various financial ratios such as current ratio, debt to equity ratio, and return on equity
Use formulae like Current Ratio = Current Assets / Current Liabilities
Interpret the ratios to analyze the financial he
DTA stands for Deferred Tax Asset and DTL stands for Deferred Tax Liability.
DTA is an asset recorded on a company's balance sheet that may be used to reduce taxable income in the future.
DTL is a liability recorded on a company's balance sheet that represents taxes that have been accrued but not yet paid.
DTA arises when a company has overpaid taxes or has tax deductions that exceed its taxable income.
DTL arises when a c...
Accumulated depreciation is a contra asset account that represents the total depreciation expense taken on an asset since it was acquired.
Accumulated depreciation is recorded on the balance sheet as a reduction from the gross amount of fixed assets to arrive at the net book value.
The accounting entry for accumulated depreciation involves debiting the depreciation expense account and crediting the accumulated depreciati...
Standard costing formula calculates the expected cost of a product based on predetermined standards.
Standard costing formula = Standard cost of direct materials + Standard cost of direct labor + Standard manufacturing overhead cost
Standard cost of direct materials = Standard quantity of materials x Standard price per unit
Standard cost of direct labor = Standard hours of labor x Standard rate per hour
Standard manufactur...
Budgeting involves setting financial goals and allocating resources, while forecasting predicts future financial outcomes based on past data and trends.
Budgeting is a plan for how to allocate resources and achieve financial goals
Forecasting predicts future financial outcomes based on past data and trends
Budgeting is typically done on an annual basis, while forecasting can be done on a shorter or longer term basis
Budget...
Variance analysis is a technique used to identify and analyze the difference between planned financial outcomes and actual results.
Variance analysis helps in understanding the reasons for deviations from budgeted or expected figures.
It involves comparing actual financial performance with budgeted or standard performance.
Common types of variances include price variance, quantity variance, and mix variance.
Variance analy...
posted on 30 Jan 2025
I was interviewed in Dec 2024.
Basic quant and reasoning questions
Selenium MCQ
Java programs with MCQ
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Dec 2024. There were 2 interview rounds.
Process planning refers to the methodical approach of determining the best possible way to manufacture a product or deliver a service by considering various aspects such as resources, timelines, and methodologies involved in production or execution.
Implemented a new chemical process to increase efficiency and reduce waste.
Researched and analyzed current process to identify areas for improvement
Designed and tested new process using simulation software
Collaborated with production team to implement changes and monitor results
Achieved 20% increase in production output and 15% reduction in waste
Continuously monitored and optimized process for further improvements
I utilize a combination of project management tools and communication strategies to effectively manage my team and projects.
I prioritize tasks based on deadlines and importance
I regularly communicate with team members to ensure everyone is on the same page
I use project management software such as Trello or Asana to track progress and assign tasks
I adapt my management style to fit the needs and preferences of individual
Interview experience
based on 11 reviews
Rating in categories
Design Engineer
14
salaries
| ₹1.9 L/yr - ₹4.2 L/yr |
Production Engineer
7
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Quality Engineer
5
salaries
| ₹1.9 L/yr - ₹4.5 L/yr |
Senior Quality Engineer
5
salaries
| ₹4.5 L/yr - ₹4.8 L/yr |
Quality Assurance Quality Control Engineer
5
salaries
| ₹1.5 L/yr - ₹4.7 L/yr |
Cognizant
Teleperformance
Reliance Retail
iEnergizer