Filter interviews by
I applied via Approached by Company and was interviewed before Aug 2023. There were 4 interview rounds.
Had Question based on Logical reasoning, maths, english. code and sql query output
Top trending discussions
I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.
Technical and project assignments
posted on 8 Jan 2021
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
I applied via Referral and was interviewed in Dec 2024. There were 3 interview rounds.
Basic java questions
I applied via LinkedIn and was interviewed in Nov 2021. There was 1 interview round.
Software life cycle is a process of developing software from planning to deployment and maintenance.
Planning and requirement analysis
Design and prototyping
Coding and implementation
Testing and quality assurance
Deployment and maintenance
Iterative process
Waterfall, Agile, and DevOps are common models
A test case (TC) is a set of steps to validate a specific functionality of the software.
Identify the functionality to be tested
Define the input data and expected output
Write step-by-step instructions to execute the test
Include preconditions and post-conditions
Ensure the TC is clear, concise, and unambiguous
I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.
Quality assurance ensures quality of product while quality control ensures quality of process. Bug report is a document that contains information about a defect. Defect life cycle is the process of identifying, reporting, and resolving defects.
Quality assurance focuses on preventing defects while quality control focuses on identifying and correcting defects
Bug report includes information such as steps to reproduce, sev...
posted on 5 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 3 interview rounds.
Testing Life Cycle includes planning, designing, executing and reporting. Bug Life Cycle includes reporting, assigning, fixing and verifying.
Testing Life Cycle involves planning, designing, executing and reporting of tests.
Bug Life Cycle involves reporting, assigning, fixing and verifying bugs.
Testing Life Cycle starts with requirement analysis and ends with test closure.
Bug Life Cycle starts with bug reporting and end...
Severity is the impact of a bug on the system while priority is the urgency of fixing it.
Severity is the measure of how much a bug affects the system's functionality or performance.
Priority is the measure of how urgently a bug needs to be fixed.
A high severity bug may not have a high priority if it does not affect critical functionality.
A low severity bug may have a high priority if it affects critical functionality.
Bo...
Challenges faced during testing phase
Lack of clear requirements
Limited access to test environment
Time constraints
Difficulty in reproducing bugs
Integration issues with third-party systems
Lack of proper documentation
Testing on multiple platforms and devices
Dealing with unexpected errors
Interview experience
based on 4 reviews
Rating in categories
Software Engineer
228
salaries
| ₹6.9 L/yr - ₹19 L/yr |
Senior Software Engineer
213
salaries
| ₹9.8 L/yr - ₹30 L/yr |
Principal Software Engineer
144
salaries
| ₹12.8 L/yr - ₹35.7 L/yr |
Associate Software Engineer
134
salaries
| ₹4 L/yr - ₹12.8 L/yr |
Module Lead
82
salaries
| ₹22 L/yr - ₹38.3 L/yr |
TCS
Infosys
Wipro
HCLTech