Filter interviews by
Top trending discussions
I applied via Approached by Company and was interviewed before Jul 2023. There were 4 interview rounds.
Field engineer in RACW
Refrigeration & air conditioner
Yes, I have experience in handling a situation where a critical quality issue was identified during production.
Identified root cause of the quality issue
Implemented corrective actions to address the issue
Worked closely with production team to prevent recurrence
Group discussion with any issues
posted on 7 May 2023
I applied via Approached by Company and was interviewed in Apr 2023. There were 2 interview rounds.
During my time as a Quality Engineer at XYZ company, we had 4 defects related to bicycle parts.
I worked closely with the production team to identify the root cause of the defects.
We implemented corrective actions such as improving the inspection process and providing additional training to the operators.
We also conducted regular audits to ensure that the corrective actions were effective and sustainable.
As a result, we...
Supplier name. Quantity. Material dimensions. Rejected part information.check part.visually and vernier caliper.
Good materials accepted and bad Raw materials rejected after checking quality checking.
Good easy process and aptitude test
I applied via Recruitment Consulltant and was interviewed before Mar 2023. There were 2 interview rounds.
Saturation point is the point at which a substance can no longer absorb or dissolve any more of another substance.
Saturation point is reached when a solution can no longer dissolve any more solute.
In chemistry, it refers to the point at which a solution is holding the maximum amount of solute that can be dissolved at a given temperature and pressure.
For example, if you keep adding sugar to a cup of water and stirring i...
I applied via Referral
7 QC tools are problem-solving techniques used in quality control. PPAP documents are used in automotive industry for product approval.
7 QC tools include Pareto chart, fishbone diagram, control chart, histogram, scatter diagram, flowchart, and check sheet
PPAP documents are Production Part Approval Process documents used in automotive industry for product approval
PPAP documents include design records, engineering change...
I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.
Electronic components are parts that make up electronic circuits, such as resistors, capacitors, transistors, and diodes.
Resistors: control the flow of electric current
Capacitors: store and release electrical energy
Transistors: amplify or switch electronic signals
Diodes: allow current to flow in one direction only
posted on 1 Nov 2023
I applied via campus placement at Adhiyamaan College of Engineering, Hosur and was interviewed before Nov 2022. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 2 interview rounds.
Sales Executive
219
salaries
| ₹0.9 L/yr - ₹4.7 L/yr |
Circle Head
108
salaries
| ₹1.9 L/yr - ₹7 L/yr |
Key Account Manager
107
salaries
| ₹5.5 L/yr - ₹12.7 L/yr |
Team Lead
104
salaries
| ₹1.1 L/yr - ₹6 L/yr |
Service Engineer
97
salaries
| ₹1 L/yr - ₹6 L/yr |
KENT RO Systems
AQUA GUARD
Livpure
Blue Star