Suitable trails in tandem co-extruder plant at China can be checked by conducting trials with different materials and adjusting process parameters.
Conduct trials with different materials to determine suitable trails
Adjust process parameters such as temperature, pressure, and speed
Analyze the results of the trials to determine the best trails
Consider factors such as product quality, efficiency, and cost
Collaborate with ...
I applied via Walk-in and was interviewed before Mar 2020. There was 1 interview round.
Top trending discussions
The duration of EPL Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 31 interviews
Interview experience
based on 541 reviews
Rating in categories
10-16 Yrs
Not Disclosed
Production Engineer
356
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Engineer
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Production Engineer
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Technician
31
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Uflex
Cosmo Films
Huhtamaki
TCPL Packaging