i
Essar Group
Filter interviews by
I applied via Referral and was interviewed before Dec 2019. There were 3 interview rounds.
Top trending discussions
posted on 12 Nov 2024
posted on 2 Dec 2024
I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.
posted on 25 Jun 2024
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Reconciliation process of raw material involves comparing the physical inventory with the recorded inventory to identify discrepancies.
Verify the accuracy of raw material receipts and usage records
Compare physical inventory counts with the recorded inventory levels
Investigate and resolve any discrepancies found
Update inventory records accordingly
Implement controls to prevent future discrepancies
posted on 9 Apr 2024
Behaviour based safety is a proactive approach to safety that focuses on changing behaviors to prevent accidents and injuries.
Focuses on changing behaviors to improve safety
Involves observing and addressing at-risk behaviors
Encourages positive reinforcement for safe behaviors
Incorporates training and education on safe practices
Emphasizes employee involvement and ownership of safety
Accident type and analysis techniques involve identifying the type of accidents that occur and analyzing the root causes to prevent future incidents.
Identify common accident types such as slips, trips, falls, machinery accidents, and chemical exposures.
Conduct accident investigations to determine the root causes of incidents.
Use techniques like root cause analysis, fault tree analysis, and fishbone diagrams to analyze ...
I manage unsafe behavior by implementing safety protocols, providing training, conducting regular inspections, and addressing issues promptly.
Implementing safety protocols to prevent unsafe behavior
Providing regular training on safety procedures
Conducting regular inspections to identify potential hazards
Addressing unsafe behavior promptly through corrective actions
Encouraging open communication to address safety concer
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
Group Discussion - Operation & Maintenance
posted on 21 Jul 2024
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
posted on 18 Apr 2023
I applied via Walk-in and was interviewed in Mar 2023. There were 3 interview rounds.
Primavera P6 is a project management software that uses critical path method to schedule activities and track progress.
Primavera P6 is a tool used for project planning, scheduling, and control.
It uses critical path method to calculate the longest path of planned activities to determine the project's duration.
It allows users to create a project schedule, assign resources, track progress, and analyze data.
It also has fea...
Assistant Manager
78
salaries
| ₹2.4 L/yr - ₹8.4 L/yr |
Manager
72
salaries
| ₹7.3 L/yr - ₹25 L/yr |
Deputy Manager
62
salaries
| ₹4.7 L/yr - ₹15 L/yr |
Senior Manager
43
salaries
| ₹11 L/yr - ₹29 L/yr |
Deputy General Manager
19
salaries
| ₹13 L/yr - ₹45.5 L/yr |
Tata Group
Reliance Industries
Adani Group
Bharti Enterprises