i
Escorts Kubota Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
5S is a workplace organization method that aims to improve efficiency and productivity by eliminating waste and optimizing workflow.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and inspect the work area regularly
Standardize - establish procedures and guidelines for maintaining the 5S system
Sustain - ensure that the 5S system i...
A checksheet is a tool used to collect and organize data in a structured manner.
It is a simple form used to record data in a consistent manner
It helps to identify patterns and trends in the data
It can be used to monitor quality control processes
Examples include tally sheets, defect checklists, and inspection forms
7 QC tools are a set of basic quality control tools used to identify and solve quality problems.
The tools include: Pareto chart, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart.
They are used to analyze data and identify the root cause of quality problems.
The tools are easy to use and can be applied to various industries and processes.
For example, a Pareto chart can be use...
FRL stands for Filter, Regulator, and Lubricator. It is a device used in pneumatic systems to clean, regulate, and lubricate compressed air.
Filter removes impurities and moisture from compressed air
Regulator controls the pressure of compressed air
Lubricator adds oil mist to compressed air to lubricate moving parts
Used in pneumatic systems for machinery, tools, and equipment
Helps to extend the life of pneumatic componen
Take time refers to the amount of time required to complete a task or process.
It is important to accurately estimate take time to ensure efficient production.
Factors that can affect take time include equipment, materials, and worker skill level.
Take time can be improved through process optimization and training.
For example, if a production line has a take time of 10 minutes per unit, increasing efficiency could reduce
DWM stands for Daily Work Management. It is a process used to manage daily work activities and improve productivity.
DWM involves setting daily goals and targets for the team
It includes tracking progress and identifying areas for improvement
DWM helps to prioritize tasks and ensure that work is completed efficiently
Examples of DWM tools include visual management boards and daily huddles
Top trending discussions
I applied via Walk-in and was interviewed before Oct 2021. There were 4 interview rounds.
Basic Mathematics, Science, English questions are asked
I was interviewed in Dec 2024.
Two stroke engines have a power stroke every two strokes, while four stroke engines have a power stroke every four strokes.
Two stroke engines have a simpler design with fewer moving parts.
Four stroke engines are more fuel efficient and produce less pollution.
Examples: Two stroke engines are commonly used in chainsaws and dirt bikes, while four stroke engines are found in cars and motorcycles.
posted on 26 Jan 2025
I was interviewed in Jul 2024.
I applied via Walk-in and was interviewed in Oct 2024. There were 2 interview rounds.
My project involved coordinating the production of a new line of eco-friendly packaging materials.
Managed a team of production staff to ensure timely completion of orders
Implemented new sustainable practices to reduce waste and improve efficiency
Collaborated with suppliers to source environmentally friendly materials
Conducted quality control checks to maintain high standards of production
Successfully launched the new p
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
As a Production Supervisor, my responsibility is to oversee the manufacturing process, ensure production goals are met, manage staff, and maintain quality standards.
Oversee the manufacturing process to ensure efficiency and productivity
Ensure production goals are met within budget and timeline
Manage and supervise production staff to maintain a safe and efficient work environment
Maintain quality standards and implement ...
SPR stands for Surface Plasmon Resonance and DPTT stands for Dipropylene glycol monomethyl ether (also known as Dowanol DPM).
SPR is a technique used to study biomolecular interactions in real time.
DPTT is a solvent commonly used in industrial applications such as coatings, inks, and cleaning products.
I have a wife and two children, a son and a daughter.
Married with two children
One son and one daughter
posted on 13 Sep 2024
I applied via Campus Placement and was interviewed in Mar 2024. There were 3 interview rounds.
To apply my knowledge and skills in production engineering to contribute to the success of the organization.
To utilize my technical expertise in optimizing production processes and improving efficiency.
To work collaboratively with cross-functional teams to troubleshoot issues and implement solutions.
To ensure quality control measures are in place to meet production goals and standards.
To continuously learn and adapt to...
I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.
Bachelor's degree in Mechanical Engineering
5+ years of experience in production engineering
Proficient in CAD software and manufacturing processes
Led a team to improve production efficiency by 20% at my previous job
Yes, I am comfortable with location and willing to relocate if necessary.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
1.1k
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Manager
531
salaries
| ₹5.2 L/yr - ₹17.2 L/yr |
Diploma Trainee Engineer
498
salaries
| ₹1.4 L/yr - ₹2.8 L/yr |
Executive
280
salaries
| ₹1.7 L/yr - ₹7.5 L/yr |
Senior Manager
272
salaries
| ₹8 L/yr - ₹25 L/yr |
Mahindra & Mahindra
Tata Motors
Ashok Leyland
Bharat Forge