A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Acts as a barrier between a trusted internal network and untrusted external network
Filters network traffic based on rules set by the administrator
Can be hardware-based or software-based
Examples include Cisco ASA, Palo Alto Networks, and Windows Firewall
posted on 12 Nov 2024
I applied via Recruitment Consulltant
posted on 7 Aug 2024
I handled a variety of customer complaints in my last company, ranging from billing issues to product quality concerns.
Resolved billing discrepancies by investigating and correcting errors
Addressed product quality complaints by offering refunds or replacements
Assisted customers with technical issues by providing troubleshooting steps
Managed delivery delays by communicating updates and offering compensation
posted on 3 May 2024
I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.
Python program python
I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.
ARUP is a global firm known for innovative and sustainable tunnel design solutions.
ARUP has a strong reputation for delivering high-quality and innovative tunnel projects.
The company has a diverse team of experts with extensive experience in tunnel design.
ARUP prioritizes sustainability and environmental considerations in their designs.
The firm has a global presence, allowing for collaboration on projects worldwide.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.
The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.
Before excavation begins, proper permits and approvals must be obtained from relevant authorities.
Excavation equipment such as excavators, bulldozers, and ba...
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
There are various types of scaffolds such as mobile tower, independent tower, suspended tower, cantilever, racker tower, basket, and fabricated and frame scaffold.
Mobile tower scaffold is a type of scaffold that can be easily moved from one place to another.
Independent tower scaffold is a free-standing scaffold that does not require support from the building or structure.
Suspended tower scaffold is a type of scaffold t...
The gin wheel capacity is 25 kg.
The gin wheel is a pulley system used to lift and lower materials on a scaffold.
The capacity of the gin wheel refers to the maximum weight it can safely lift.
It is important to ensure that the weight of the load being lifted does not exceed the capacity of the gin wheel.
Exceeding the capacity can result in accidents and injuries.
based on 53 reviews
Rating in categories
Senior Engineer Mechanical
3
salaries
| ₹21.7 L/yr - ₹21.7 L/yr |
QC Inspector
3
salaries
| ₹2 L/yr - ₹2 L/yr |
Piping Supervisor
3
salaries
| ₹6 L/yr - ₹6 L/yr |
Safety Supervisor
3
salaries
| ₹12 L/yr - ₹24 L/yr |
Construction Manager - Mechanical
3
salaries
| ₹14 L/yr - ₹22 L/yr |
Larsen & Toubro Limited
Tata Group
Adani Group
Reliance Industries