Filter interviews by
I applied via Campus Placement and was interviewed in Jun 2024. There was 1 interview round.
When we add a new line, how do we setup it?
Top trending discussions
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
To troubleshoot inverters, SCBs, transformers, and breakers, follow these pointers:
Check for loose connections and wiring
Inspect for physical damage or wear and tear
Use a multimeter to test voltage and current
Check for proper grounding
Refer to manufacturer's manual for specific troubleshooting steps
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
I applied via Referral and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
Overhauling procedure of turbine and generator involves disassembly, inspection, repair, and reassembly.
Disassemble turbine and generator components
Inspect components for wear and damage
Repair or replace damaged components
Reassemble components and test for proper function
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jun 2022. There were 4 interview rounds.
Yes, I am able to locate pan India for engineering projects.
I have experience working on engineering projects in various locations across India
I am familiar with the different regulations and requirements in different states
I have a network of contacts and resources that can help me navigate different regions
I am willing to travel and relocate as needed for projects
I have successfully completed projects in multiple sta
Current CTC is $80,000 and expectations are $100,000.
Current CTC is $80,000
Expectations are $100,000
DFIF stands for Digital Filter Initialization File. It is used to store filter coefficients and settings for digital signal processing.
DFIF is a file format used in digital signal processing to store filter coefficients and settings.
It is commonly used in audio processing applications to apply filters to sound signals.
DFIF files can be created and edited using software tools like MATLAB or Python libraries.
The informat...
A converter is a device that converts one form of energy into another form.
Converters can be used to convert electrical energy into mechanical energy, or vice versa.
Examples of converters include AC to DC converters, voltage converters, and frequency converters.
Converters are commonly used in power electronics and electrical engineering applications.
Different types of motor principles include DC motors, AC motors, stepper motors, and servo motors.
DC motors operate using direct current and are commonly used in household appliances and electric vehicles.
AC motors operate using alternating current and are commonly used in industrial applications.
Stepper motors move in precise increments and are commonly used in 3D printers and CNC machines.
Servo motors use feedback t...
Nitrogen gas is used in accumulators due to its inert properties and ability to maintain pressure for extended periods of time.
Nitrogen gas is inert, meaning it does not react with other substances, making it ideal for maintaining pressure without causing corrosion or contamination.
It is also non-flammable, which reduces the risk of fire hazards in accumulator systems.
Nitrogen gas has a stable temperature range, allowi...
Accumulator is used in WTG to store excess energy generated by the wind turbine for later use.
Accumulator helps in smoothing out the power output from the wind turbine.
It allows for energy storage when the demand is low and release of stored energy when the demand is high.
Accumulators can also help in providing backup power during periods of low wind.
Examples of accumulators used in WTG include batteries, flywheels, an
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Junior Engineer
103
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Production Engineer
42
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Management Engineer Trainee
29
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Junior Engineer Production
26
salaries
| ₹2 L/yr - ₹3.4 L/yr |
Assistant Manager
21
salaries
| ₹5.1 L/yr - ₹9.5 L/yr |
ReNew
Adani Green Energy
Vestas
Jakson Group