Filter interviews by
The best time for vibrating concrete is when it is in a plastic state.
Vibrating concrete helps to remove air bubbles and compact the mixture.
The ideal time for vibrating is when the concrete is still workable and has not yet hardened.
Vibrating too early can cause segregation of the mixture, while vibrating too late may not be effective in removing air voids.
The specific time for vibrating depends on factors such as the...
The pH value of water for concrete construction should be between 6 and 8.
The pH value of water affects the hydration process of cement in concrete.
Water with a pH below 6 can be acidic and may corrode the reinforcement in concrete.
Water with a pH above 8 can be alkaline and may cause efflorescence on the concrete surface.
Testing the pH value of water before using it in concrete construction is important.
Water with a p...
The temperature of concrete casting is an important factor that affects its strength and durability.
The temperature of concrete during casting should be within a specific range to ensure proper hydration and curing.
The ideal temperature for concrete casting is typically between 50°F and 90°F (10°C and 32°C).
If the temperature is too low, the hydration process slows down, leading to delayed strength development.
If the t...
Circular steel is used for its strength, durability, and versatility in various construction applications.
Circular steel is commonly used in the construction of bridges, high-rise buildings, and infrastructure projects.
Its circular shape provides structural stability and resistance to bending and torsion forces.
Circular steel is easy to fabricate, transport, and install, making it a preferred choice for construction pr...
Stirrups are reinforcement bars used in concrete structures to provide lateral support and prevent shear failure.
Stirrups are typically made of steel and are placed perpendicular to the main reinforcement bars.
They are used to resist diagonal tension forces and prevent the concrete from cracking.
Stirrups help in enhancing the structural integrity and load-bearing capacity of the concrete elements.
They are commonly used...
Cut off pile level refers to the elevation at which a pile is terminated or cut off during construction.
Cut off pile level is the final elevation at which a pile is stopped or cut during construction.
It is determined based on the design requirements and the load-bearing capacity of the pile.
Cut off pile level is usually specified in the project drawings or specifications.
The cut off pile level may vary for different pi...
The minimum diameter of a bored pile depends on various factors such as soil conditions, load requirements, and construction methods.
The minimum diameter of a bored pile is typically determined by the design engineer based on the load requirements and soil conditions at the site.
In general, larger diameter bored piles are used for higher load-bearing capacities.
The minimum diameter of a bored pile can range from 300mm ...
The density of bentonite solution for pile is the weight of bentonite per unit volume.
Density is typically measured in kilograms per cubic meter (kg/m³).
The density of bentonite solution for pile is usually around 1000 to 1200 kg/m³.
Higher density solutions are used for larger diameter piles or in situations where higher hydrostatic pressure is required.
The density of the solution can be adjusted by adding more or less...
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.
I appeared for an interview before Sep 2016.
I applied via Recruitment Consultant and was interviewed before Sep 2018. There were 4 interview rounds.
I appeared for an interview in Jul 2017.
I am a software engineer with experience in developing and maintaining software applications.
I have a strong background in programming languages such as Java, C++, and Python.
I have worked on various projects, including developing web applications and implementing software solutions.
I am skilled in problem-solving and debugging, ensuring efficient and effective software development.
I have experience in collaborating wi...
I learned valuable teamwork and problem-solving skills during my summer internship.
Developed strong collaboration skills by working with a team of software engineers to complete projects
Gained experience in troubleshooting and debugging software issues
Learned to effectively communicate and present technical concepts to both technical and non-technical stakeholders
Improved problem-solving abilities by identifying and re...
based on 2 interviews
Interview experience
based on 10 reviews
Rating in categories
Protection Engineer
5
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Service Engineer
4
salaries
| ₹3.4 L/yr - ₹4.1 L/yr |
Site Engineer
4
salaries
| ₹2 L/yr - ₹3.2 L/yr |
Civil Site Engineer
4
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Electrical Testing Engineer
4
salaries
| ₹3 L/yr - ₹6.6 L/yr |
TCS
Accenture
Wipro
Cognizant