Filter interviews by
I applied via Walk-in and was interviewed in Nov 2020. There were 4 interview rounds.
PCBs are observed for defects, errors, and quality assurance purposes.
Soldering defects such as bridging, cold joints, and insufficient solder
Component placement errors such as incorrect orientation or missing components
Electrical testing for shorts, opens, and impedance
Visual inspection for physical damage or contamination
Quality assurance checks for adherence to industry standards and customer specifications
Possible problems in PCB layout include signal integrity issues, thermal management, and manufacturability concerns.
Signal integrity issues can arise from improper trace routing or placement of components.
Thermal management can be a challenge if components are too close together or if there is inadequate ventilation.
Manufacturability concerns may include difficulty in placing or soldering components, or issues with the...
Top trending discussions
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
Introduction
Test
Normality
Introduction
Ph
Morality
BVA Testing stands for Boundary Value Analysis Testing, a software testing technique to test the boundary values of input ranges.
BVA Testing is used to identify errors at the boundaries of input ranges.
It involves testing the minimum and maximum values, as well as just inside and just outside the boundaries.
For example, if a system accepts values from 1 to 10, BVA Testing would test values 0, 1, 10, and 11.
Reverse linked list. followup for optimized way.
I applied via Referral and was interviewed in Dec 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in May 2024. There were 3 interview rounds.
Interface is a point where two systems, subjects, organizations, etc. meet and interact with each other.
Interface allows communication and interaction between different components or systems.
It defines how different entities can communicate with each other.
Examples include user interfaces on electronic devices, API interfaces for software integration, and physical interfaces like USB ports.
I applied via Newspaper Ad and was interviewed in Aug 2024. There was 1 interview round.
My future goal is to become a certified Quality Engineer and lead a team of inspectors to ensure the highest quality standards are met.
Obtain certification as a Quality Engineer
Lead a team of inspectors
Ensure highest quality standards are met
Continuously improve processes and procedures
I expect a challenging work environment, opportunities for growth, and a supportive team.
Challenging work that allows me to utilize my skills and knowledge
Opportunities for professional development and advancement
A supportive team that values collaboration and communication
I applied via Referral
MW stands for molecular weight while UBR stands for ultimate bearing resistance.
MW is a measure of the average mass of molecules in a sample, while UBR is the maximum load a structure can withstand before failure.
MW is commonly used in chemistry to determine the size of molecules, while UBR is important in engineering for designing structures.
Examples: The MW of water is approximately 18 g/mol, while the UBR of a steel...
Different ways to locate elements in a web page include using XPath, CSS selectors, ID, class name, tag name, and link text.
XPath: Allows you to navigate through the HTML structure of a web page.
CSS selectors: Can be used to target specific elements based on their attributes.
ID: Unique identifier for an element on a web page.
Class name: Used to group elements with similar styling.
Tag name: Targets elements based on the...
Working with lists in Selenium involves locating elements, storing them in a list, and performing actions on them.
Locate elements using findElements() method
Store elements in a List
Iterate through the list to perform actions on each element
Example: List
I faced challenges in team communication and conflicting priorities.
Miscommunication leading to delays in project timelines
Conflicting priorities causing tension within the team
Difficulty in aligning team members' goals and objectives
Production Engineer
5
salaries
| ₹1.1 L/yr - ₹2.2 L/yr |
Quality Engineer
4
salaries
| ₹1.6 L/yr - ₹2.6 L/yr |
Design Engineer
3
salaries
| ₹3 L/yr - ₹4.1 L/yr |
Quality Inspection Engineer
3
salaries
| ₹1.1 L/yr - ₹2 L/yr |
TCS
Accenture
Wipro
Cognizant