I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.
Estimate material required by calculating quantities based on project specifications and drawings.
Review project specifications and drawings to determine material requirements
Calculate quantities needed based on dimensions, area, volume, etc.
Consider factors such as waste, shrinkage, and additional materials for contingencies
Use software tools like Excel or specialized estimating software for accuracy
Consult with suppl...
The span of OHE foundations varies depending on the design and requirements of the project.
The span of OHE foundations can range from a few meters to tens of meters, depending on the distance between the support structures.
Factors such as soil conditions, type of support structures, and loads to be supported will influence the span of OHE foundations.
For example, in a project with widely spaced support structures, the ...
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
I have 5 years of experience as a Planning Engineer in the construction industry.
I have successfully managed and executed multiple construction projects from start to finish.
I have expertise in creating project schedules, resource allocation, and cost estimation.
I have strong analytical and problem-solving skills to identify and resolve project delays or issues.
I have excellent communication and coordination abilities ...
As a planning engineer in a railway project, my works include developing project schedules, coordinating with various stakeholders, monitoring progress, and resolving any scheduling conflicts.
Developing project schedules and timelines
Coordinating with different teams and stakeholders to ensure smooth execution
Monitoring progress and identifying any delays or issues
Resolving scheduling conflicts and adjusting timelines ...
Managing a complex construction project with multiple stakeholders and tight deadlines.
Coordinating and aligning the activities of various teams and subcontractors.
Ensuring that the project stays on schedule and within budget.
Dealing with unexpected issues and changes in plans.
Negotiating with suppliers and resolving conflicts between different parties involved.
Maintaining effective communication and collaboration amon...
I have a strong background in planning engineering with experience in project management and scheduling.
Bachelor's degree in Civil Engineering
5 years of experience as a Planning Engineer
Proficient in using planning software such as Primavera P6
Managed multiple construction projects and created detailed schedules
Collaborated with cross-functional teams to ensure project timelines are met
Yes, I have experience in SNT Works.
I have worked on several projects involving SNT Works.
I am familiar with the processes and techniques used in SNT Works.
I have successfully completed SNT Works tasks in my previous roles.
I have received training and certifications in SNT Works.
I can provide specific examples of my experience in SNT Works if required.
The procedure for OFC laying involves several steps including route survey, trenching, duct laying, blowing fiber, splicing, and testing.
Conduct a route survey to determine the best path for the OFC
Trench the ground to lay the ducts
Lay the ducts and secure them in place
Blow the fiber through the ducts
Splice the fiber to connect the cables
Test the fiber to ensure proper connectivity and signal strength
Top trending discussions
based on 3 interviews
Interview experience
based on 1 review
Rating in categories
Signal Engineer
20
salaries
| ₹2 L/yr - ₹4 L/yr |
Project Manager
6
salaries
| ₹9.7 L/yr - ₹14 L/yr |
Assistant Manager
5
salaries
| ₹5.5 L/yr - ₹10.5 L/yr |
Senior Engineer
5
salaries
| ₹4.5 L/yr - ₹8 L/yr |
Business Development Manager
5
salaries
| ₹7.2 L/yr - ₹9.3 L/yr |
Indian Railways
Delhi Metro Rail Corporation
Konkan Railway Corporation
Mumbai Metro One