I prioritize tasks, communicate effectively, and adapt to changes to manage corporate responsibilities efficiently.
Prioritization: I use tools like the Eisenhower Matrix to distinguish between urgent and important tasks, ensuring I focus on what truly matters.
Effective Communication: I maintain open lines of communication with my team, using platforms like Slack for quick updates and feedback.
Time Management: I se...
RERA stands for Real Estate (Regulation and Development) Act, aimed at promoting transparency and accountability in the real estate sector.
RERA was enacted in India in 2016 to protect home buyers and promote fair practices.
It mandates real estate developers to register their projects before advertising or selling.
Homebuyers can file complaints against builders for delays or non-compliance with project specificatio...
Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.
Calculate the volume of the area to be filled (length x width x height)
Determine the density of the concrete (usually around 2400 kg/m^3)
Multiply the volume by the density to get the total concrete quantity needed
Consider adding a percentage for wastage or spillage
Lapping is provided in columns to ensure proper bonding between the column reinforcement and the beam reinforcement.
Lapping is typically provided at the junction of vertical and horizontal reinforcement bars in columns.
It helps in transferring the load from the column to the beam effectively.
The length of lapping required is specified in the structural drawings or as per design requirements.
Proper lapping ensures ...
The number of days for slab cycle in Mivan technology varies depending on the project and the size of the slab.
The duration of slab cycle in Mivan technology is project-specific.
The size of the slab also affects the number of days for slab cycle.
Factors such as weather conditions and availability of resources can also impact the duration of slab cycle.
On average, slab cycle in Mivan technology can take anywhere fr...
I will start by conducting a site survey and obtaining necessary permits and approvals.
Conduct a site survey to assess the land and determine the best location for the construction
Obtain necessary permits and approvals from local authorities
Develop a detailed plan for the construction process, including timelines and budget
Hire a team of contractors and subcontractors to carry out the construction work
Ensure compl...
Slab shuttering is checked by ensuring proper alignment, levelness, and stability of formwork before concrete pouring.
Check alignment of formwork with respect to the structural drawings
Ensure formwork is level using a spirit level
Inspect the stability of formwork to prevent any collapse during concrete pouring
Check for any gaps or misalignments in the formwork that may affect the quality of the slab
Verify that all...
The sliding window material can be made of various materials such as glass, aluminum, or uPVC.
Common sliding window materials include glass, aluminum, and uPVC.
Glass sliding windows are popular for their transparency and aesthetic appeal.
Aluminum sliding windows are known for their durability and strength.
uPVC sliding windows offer excellent insulation and low maintenance.
The choice of sliding window material depe...
Waterproofing is the process of making a structure or object waterproof or water-resistant.
Identify the areas that need waterproofing
Prepare the surface by cleaning and repairing any cracks or damages
Apply a waterproofing membrane or coating
Ensure proper drainage to prevent water accumulation
Test the waterproofing system for effectiveness
I am a knowledgeable account executive with expertise in Rera, online payment, and intercompany transactions.
Rera is the Real Estate Regulatory Authority that regulates the real estate sector in India.
Rera fund transfer is the transfer of funds from the buyer to the developer through an escrow account.
Online payment is a method of payment that is made through the internet.
The compliance of intercompany transaction...
I applied via Job Portal and was interviewed in Sep 2024. There were 2 interview rounds.
Take confirmation in written for site location posting
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
Slab shuttering is checked by ensuring proper alignment, levelness, and stability of formwork before concrete pouring.
Check alignment of formwork with respect to the structural drawings
Ensure formwork is level using a spirit level
Inspect the stability of formwork to prevent any collapse during concrete pouring
Check for any gaps or misalignments in the formwork that may affect the quality of the slab
Verify that all nece...
Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.
Calculate the volume of the area to be filled (length x width x height)
Determine the density of the concrete (usually around 2400 kg/m^3)
Multiply the volume by the density to get the total concrete quantity needed
Consider adding a percentage for wastage or spillage
I will manage site activities through effective planning, communication, and monitoring to ensure safety and efficiency.
Develop a detailed project plan outlining tasks, timelines, and resources needed.
Conduct daily briefings with the team to discuss goals, safety protocols, and any challenges.
Implement a robust safety management system to minimize risks and ensure compliance with regulations.
Utilize project management ...
Lapping is provided in columns to ensure proper bonding between the column reinforcement and the beam reinforcement.
Lapping is typically provided at the junction of vertical and horizontal reinforcement bars in columns.
It helps in transferring the load from the column to the beam effectively.
The length of lapping required is specified in the structural drawings or as per design requirements.
Proper lapping ensures struc...
I appeared for an interview in Feb 2025, where I was asked the following questions.
Dynamic sales professional with 5 years of experience in driving revenue growth and managing client relationships.
Led a team of 10 sales representatives, achieving a 30% increase in annual sales.
Developed and implemented strategic sales plans that expanded the customer base by 25%.
Cultivated strong relationships with key clients, resulting in a 40% increase in repeat business.
Utilized CRM software to track sales metric...
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
I prioritize tasks, communicate effectively, and adapt to changes to manage corporate responsibilities efficiently.
Prioritization: I use tools like the Eisenhower Matrix to distinguish between urgent and important tasks, ensuring I focus on what truly matters.
Effective Communication: I maintain open lines of communication with my team, using platforms like Slack for quick updates and feedback.
Time Management: I set spe...
RERA stands for Real Estate (Regulation and Development) Act, aimed at promoting transparency and accountability in the real estate sector.
RERA was enacted in India in 2016 to protect home buyers and promote fair practices.
It mandates real estate developers to register their projects before advertising or selling.
Homebuyers can file complaints against builders for delays or non-compliance with project specifications.
RE...
I applied via Company Website and was interviewed in Nov 2023. There was 1 interview round.
As a CRM Executive, my daily activities involve managing customer relationships, analyzing data, and implementing strategies for engagement.
Monitor customer interactions through CRM software to ensure satisfaction and address concerns.
Analyze customer data to identify trends and opportunities for upselling or cross-selling.
Develop and implement targeted marketing campaigns based on customer segmentation.
Collaborate wit...
The sliding window material can be made of various materials such as glass, aluminum, or uPVC.
Common sliding window materials include glass, aluminum, and uPVC.
Glass sliding windows are popular for their transparency and aesthetic appeal.
Aluminum sliding windows are known for their durability and strength.
uPVC sliding windows offer excellent insulation and low maintenance.
The choice of sliding window material depends o...
Waterproofing is the process of making a structure or object waterproof or water-resistant.
Identify the areas that need waterproofing
Prepare the surface by cleaning and repairing any cracks or damages
Apply a waterproofing membrane or coating
Ensure proper drainage to prevent water accumulation
Test the waterproofing system for effectiveness
I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2022. There were 3 interview rounds.
The question is unclear and incomplete.
The question seems to be incomplete and lacks context.
It is unclear what is being asked about 'building constant'.
Please provide more information or clarify the question.
Top trending discussions
The duration of Dosti Realty interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 25 interview experiences
Difficulty level
Duration
based on 214 reviews
Rating in categories
Assistant Manager
72
salaries
| ₹4.6 L/yr - ₹12.4 L/yr |
Senior Executive
29
salaries
| ₹4.3 L/yr - ₹8 L/yr |
Sales Manager
25
salaries
| ₹5 L/yr - ₹12 L/yr |
Executive Engineer
24
salaries
| ₹3.6 L/yr - ₹6.5 L/yr |
Senior Manager
21
salaries
| ₹11.3 L/yr - ₹18.2 L/yr |
Sobha
Godrej Properties
DLF
Surya Roshni