Q1. How you will start with new construction in an open land.

Ans.

I will start by conducting a site survey and obtaining necessary permits and approvals.

  • Conduct a site survey to assess the land and determine the best location for the construction

  • Obtain necessary permits and approvals from local authorities

  • Develop a detailed plan for the construction process, including timelines and budget

  • Hire a team of contractors and subcontractors to carry out the construction work

  • Ensure compliance with all safety regulations and building codes

  • Regularly i...read more

Add your answer
right arrow

Q2. How many days mivan technology takes for slab cycle.

Ans.

The number of days for slab cycle in Mivan technology varies depending on the project and the size of the slab.

  • The duration of slab cycle in Mivan technology is project-specific.

  • The size of the slab also affects the number of days for slab cycle.

  • Factors such as weather conditions and availability of resources can also impact the duration of slab cycle.

  • On average, slab cycle in Mivan technology can take anywhere from 3 to 7 days.

  • However, larger projects may take longer, while ...read more

Add your answer
right arrow

Q3. Tell me about urself? What is Rera?how Rera fund transfer?how u do online payment?what is the compliance of intercompany transactions?

Ans.

I am a knowledgeable account executive with expertise in Rera, online payment, and intercompany transactions.

  • Rera is the Real Estate Regulatory Authority that regulates the real estate sector in India.

  • Rera fund transfer is the transfer of funds from the buyer to the developer through an escrow account.

  • Online payment is a method of payment that is made through the internet.

  • The compliance of intercompany transactions refers to the adherence to legal and regulatory requirements ...read more

Add your answer
right arrow

Q4. How do you check slab shuttering? What is the process?

Ans.

Slab shuttering is checked by ensuring proper alignment, levelness, and stability of formwork before concrete pouring.

  • Check alignment of formwork with respect to the structural drawings

  • Ensure formwork is level using a spirit level

  • Inspect the stability of formwork to prevent any collapse during concrete pouring

  • Check for any gaps or misalignments in the formwork that may affect the quality of the slab

  • Verify that all necessary supports and props are in place to bear the weight o...read more

View 1 answer
right arrow
Discover Dosti Realty interview dos and don'ts from real experiences

Q5. 1) type of sliding window material? 2) thickness of power coating? 3) instrument use for determine powder coating thickness?

Ans.

The sliding window material can be made of various materials such as glass, aluminum, or uPVC.

  • Common sliding window materials include glass, aluminum, and uPVC.

  • Glass sliding windows are popular for their transparency and aesthetic appeal.

  • Aluminum sliding windows are known for their durability and strength.

  • uPVC sliding windows offer excellent insulation and low maintenance.

  • The choice of sliding window material depends on factors like budget, climate, and personal preference.

Add your answer
right arrow

Q6. Where the lapping provided in coloumn?

Ans.

Lapping is provided in columns to ensure proper bonding between the column reinforcement and the beam reinforcement.

  • Lapping is typically provided at the junction of vertical and horizontal reinforcement bars in columns.

  • It helps in transferring the load from the column to the beam effectively.

  • The length of lapping required is specified in the structural drawings or as per design requirements.

  • Proper lapping ensures structural integrity and strength of the building.

  • Example: Lapp...read more

Add your answer
right arrow

Q7. 4) process of water proofing? 5) how to determine hard rock depth in piling?

Ans.

Waterproofing is the process of making a structure or object waterproof or water-resistant.

  • Identify the areas that need waterproofing

  • Prepare the surface by cleaning and repairing any cracks or damages

  • Apply a waterproofing membrane or coating

  • Ensure proper drainage to prevent water accumulation

  • Test the waterproofing system for effectiveness

Add your answer
right arrow

Q8. How to calculate concrete quantity

Ans.

Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

  • Calculate the volume of the area to be filled (length x width x height)

  • Determine the density of the concrete (usually around 2400 kg/m^3)

  • Multiply the volume by the density to get the total concrete quantity needed

  • Consider adding a percentage for wastage or spillage

Add your answer
right arrow

Q9. Entire process of CRM

Ans.

CRM is a process that helps businesses manage their interactions with customers throughout the customer lifecycle.

  • CRM stands for Customer Relationship Management.

  • It involves acquiring, analyzing, and utilizing customer data to improve customer satisfaction and loyalty.

  • The process includes various stages such as lead generation, customer acquisition, customer service, and customer retention.

  • CRM systems often include features like contact management, sales automation, and custo...read more

View 1 answer
right arrow

Q10. All the building constant

Ans.

The question is unclear and incomplete.

  • The question seems to be incomplete and lacks context.

  • It is unclear what is being asked about 'building constant'.

  • Please provide more information or clarify the question.

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Dosti Realty

based on 24 interviews
Interview experience
3.8
Good
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

Concentrix Corporation Logo
3.8
 • 407 Interview Questions
Qualcomm Logo
3.8
 • 257 Interview Questions
HSBC Group Logo
3.9
 • 245 Interview Questions
CARS24  Logo
3.5
 • 182 Interview Questions
Startek Logo
3.1
 • 180 Interview Questions
John Deere Logo
4.1
 • 142 Interview Questions
View all
Recently Viewed
SALARIES
Signature Global
SALARIES
Signature Global
JOBS
Signature Global
No Jobs
SALARIES
Nyati Group
REVIEWS
Novel Office
No Reviews
SALARIES
Nyati Group
JOBS
32nd Milestone
No Jobs
JOBS
Browse jobs
Discover jobs you love
SALARIES
Signature Global
SALARIES
Signature Global
Top Dosti Realty Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter