i
Filter interviews by
I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.
Top trending discussions
I applied via Company Website and was interviewed before May 2021. There were 2 interview rounds.
Polythene sheet is provided to the pillar for protection against moisture and corrosion.
Polythene sheet acts as a barrier between the pillar and external environment.
It prevents moisture from seeping into the pillar, which can cause corrosion.
The sheet also protects the pillar from dust, dirt, and other contaminants.
By providing a polythene sheet, the lifespan of the pillar can be extended.
Examples: Construction sites ...
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
posted on 19 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Consists of 10 questions
Consists of 20 questions
posted on 23 Nov 2015
SDLC is a process followed by software development teams to design, develop and test high-quality software.
SDLC consists of several phases including planning, analysis, design, development, testing, deployment, and maintenance.
Each phase has its own set of deliverables and objectives.
SDLC models include Waterfall, Agile, and DevOps.
SDLC helps ensure that software is developed efficiently, on time, and within budget.
SDL...
Different software development models
Waterfall model
Agile model
Spiral model
V-model
Iterative model
RAD model
Prototype model
Incremental model
Waterfall model is a linear sequential approach to software development.
Advantages: clear and well-defined stages, easy to understand and manage, suitable for small projects with stable requirements
Disadvantages: inflexible, difficult to make changes once a stage is completed, testing is done only at the end, not suitable for large or complex projects
Stages: requirements gathering, design, implementation, testing, depl...
Agile is an iterative approach to software development that emphasizes flexibility and customer satisfaction.
Agile involves breaking down projects into smaller, more manageable chunks called sprints.
It prioritizes collaboration between developers, customers, and stakeholders.
It allows for changes and adjustments to be made throughout the development process.
It promotes continuous delivery and improvement.
Advantages ove...
Questions about my project, E-R diagram, C/C++ projects, and software development model used.
Explained my project and its E-R diagram
Shared my experience with C/C++ projects
Discussed the software development model used
Provided examples to support my answers
posted on 6 May 2019
I applied via Campus Placement and was interviewed before May 2018. There was 0 interview round.
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
posted on 17 Dec 2020
I applied via Campus Placement and was interviewed before Dec 2019. There was 1 interview round.
BMS stands for Building Management System and PLCs stands for Programmable Logic Controllers.
BMS is a computer-based control system that manages and monitors a building's mechanical and electrical equipment.
PLCs are industrial control systems that automate processes and machinery in manufacturing and other industries.
BMS and PLCs work together to control and optimize a building's energy usage and equipment performance.
...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Officer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Bangalore Metropolitan Transport Corporation
Mumbai Metro One
Chennai Metro Rail
Kolkata Metro Rail Corporation