I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
My favorite song is 'Bohemian Rhapsody' by Queen.
The song was released in 1975 and is a rock opera.
It has a unique structure, combining elements of rock, opera, and ballad.
The lyrics are poetic and thought-provoking, with themes of life, death, and self-reflection.
The song features intricate vocal harmonies and a wide range of musical styles.
It has become a timeless classic and is often regarded as one of the greatest
I applied via Company Website and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 25 Apr 2022
I was interviewed in Jul 2021.
posted on 5 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There were 3 interview rounds.
Moisture content in sand can be calculated using the formula: Moisture content (%) = ((wet weight - dry weight) / dry weight) * 100
Collect a sample of sand and weigh it while wet (wet weight)
Dry the sample in an oven until it reaches a constant weight (dry weight)
Calculate the moisture content using the formula: ((wet weight - dry weight) / dry weight) * 100
For example, if the wet weight is 100g and the dry weight is 9...
posted on 1 Dec 2024
I was interviewed in Nov 2024.
posted on 31 Jan 2024
About site experience
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Assistant Engineer
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
84
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
72
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem